Sei sulla pagina 1di 10

Houston, Texas

Arc Flash Risk Assessment Done!


What Next?

By

Yogi Nimbalkar
Saber Power Services

TechCon North America 2017 – Houston, TX


Arc Flash Risk Assessment Done! What Next?
Author: Yogi Nimbalkar
Saber Power Services

Abstract

Facilities (industrial / commercial / intuitional / utility) depend on continuous power supply and
maintaining these has significantly increased the need for qualified personnel at certain times to
perform work on energized equipment, thus exposing persons to arc flash risk. Working on or
near electrical equipment that is energized is not considered a safe act, a risk exists at all times.
Every employer is required to conduct an Arc Flash Risk Assessment (AFRA) in accordance
with OSHA 29 CR 1910.132(d) (1) / NFPA 70E article 110.3 and document the results. Hence
it is a requirement for any facility owner to perform an Arc Flash Risk Assessment for
their facility / electrical distribution system. Benefits of performing a detailed and accurate arc
flash risk assessment are: better system reliability, equipment protection, reduced downtime,
employee safety, code/insurance requirements, etc. This paper will discuss the importance of Arc
Flash Risk Assessment, detailed steps to perform the same, followed by important steps to be
done after the assessment study is performed which are mostly ignored / unknown.

Introduction

Electrical Safety has no substitute, don’t believe anyone but yourself! The key guidelines for
electrical safety are:

1. NEC (NFPA 70) - safe installation of electrical equipment


2. NFPA 70B - preventive maintenance of the electrical equipment assures safe operation.
3. NFPA 70E - guide for employers to develop an Electrical Safety Program for the facility,
which will help workers to ensure safe execution of work during normal operating
conditions of the energized electrical equipment. Workers are exposed to energized
equipment which can result in an electrical hazard (arc flash, arc blast and shock).

An electrical safety program shall include a risk assessment that will provide protection to
qualified persons from electrical hazards. Risk Assessment
is a process with several steps to ensure that the hazards are
properly identified and analyzed with regards to their severity
and the likelihood of their occurrence. Upon assessing these
risks, appropriate control measures need to be implemented
to minimize the hazards and ensure a safe work
environment for qualified persons. The risk assessment must
determine the voltage, incident energy, the shock boundaries,
and the required Personal Protective Equipment (PPE) to protect employees from the shock
hazard. The arc flash risk assessment first determines if an arc flash hazard exists. If an arc flash
hazard exists, the employer then determines safe work practices, as well as the arc flash
boundary and the required PPE from AFRA. Hence, to provide a practical safe working area for
qualified persons it is necessary to perform an Arc Flash Risk Assessment for any facility.

TechCon North America 2017 – Houston, TX 1


Paper

NFPA 70E 2015 Article 130.5 states the detailed requirements for an Arc Flash Risk Assessment
(AFRA) to be performed. To summarize the same in a few items:

1. AFRA shall be reviewed not to exceed 5 years, or any change in the system that can
invalidate the results of AFRA
2. Results of the AFRA need to be documented
3. To determine if a hazard exists, then determine safe work practices, the arc flash boundary, and
the required PPE
4. Arc Flash PPE shall be calculated by using one of the two methods (Incident Energy / PPE
Categories or Tables), but not both for same equipment
5. All equipment needs to be labeled followed by training of qualified persons.

Overall scope of the AFRA study includes data collection, system modeling (developing /
updating software model), performing short-circuit analysis, equipment evaluation, protective
device coordination, arc flash incident energy analysis and report then followed by labeling of
electrical equipment.

These various steps of performing an accurate AFRA must be followed under supervision and
control of a Registered Professional Engineer with a minimum of five years of experience.

1. Site kick-off meeting and scheduling data collection


This meeting could be either a conference call or held at the facility, where site/contact
person information can be exchanged with the field engineer which can help in scheduling
the actual data collection. This step can serve as an input to the field engineer (who
would request an existing single line diagram - if any available, utility information, etc.)
of the facility. During this meeting, discuss the scope of work (for e.g. grouping of < 50
HP motors, single low impedance transformers under 125kVA with secondary less than
240V, single phase ac system being ignored, etc.), methodology (software modeling
preference) that will be used for AFRA, label size, etc.

2. Data Collection
Qualified persons must collect the data for electrical equipment noted below with all the
necessary information. It is always a good idea to take pictures, in case i t i s required
to verify some details later. This is a very important step and requires attention to details
to accurately determine the AFRA. The old saying “Garbage-in is Garbage-out (GIGO)”
is very true, especially in data collection for AFRA and/or any other power engineering
studies. Data shall be complete for each equipment as a minimum, but not limited to items
listed below.
a. Utility fault current (3 Phase and SLG) with corresponding X/R ratios at respective
voltages
b. Protective devices shall include Manufacture, Type, Voltage/Interrupting Rating,
over current and ground settings, etc.
c. Cables size, number per phase, length, etc.

TechCon North America 2017 – Houston, TX 2


d. Transformer kVA and voltage ratings, connections, % impedance, tap, etc.
e. Generator kVA, voltage ratings
f. Motor HP rating, SF, FLA, PF, efficiency, NEMA code letter, etc.
g. Switchgear/MCC voltage, ampacity and interrupting ratings, etc.
h. Modes of operation of the facility

3. System Modeling

There are several applications (ETAP, SKM, Easypower, EDSA, etc.) which contain
modules to determine incident energy levels. It should be noted that the AFRA study
results will only be as good as the system model. Every effort should be made to collect
the actual equipment information as found in the field and select the correct protective
devices from the software. Any variations can change the actual results. Facilities with
simple radial systems have one mode of operation, however for larger facilities there
can be multiple modes of operation, such as multiple utility sources, generators in parallel
with utility, etc. Separate scenarios shall be created to consider the worst-case results for
such larger facilities.

Below is a sample one line system model.

TechCon North America 2017 – Houston, TX 3


4. Short Circuit Analysis and Equipment Evaluation

This step evaluates electrical equipment (switchgear/switchboard/MCC, etc.), protective


device existing ratings and compares them to calculated short circuit ratings. Inadequacy
of any equipment or protective device shall be mentioned in the report and
recommendations shall be made to mitigate the same. All results need to be tabulated. The
study results are also used to selectively coordinate Time v s Current Characteristics
(TCC) of electrical protective devices.

5. Protective Device Coordination

Log-log plots give a clear picture as to how the protective device settings coordinate
within a system to comply with article 110.10 of NEC 2014. This step ensures the
protective device nearest to the fault will clear the fault without extensive damage to the
system electrical equipment. Proper selective coordination ensures system reliability.

TechCon North America 2017 – Houston, TX 4


6. Arc Flash Incident Energy Analysis

Short circuit analysis and protective device coordination are prerequisites for arc flash
incident energy analysis. Arcing current from the short circuit results and tripping time from
the coordination study are used to calculate the Incident energy and arc flash boundaries
referring the IEEE 1584 / NFPA 70E standards. Based on the incident energy values,
appropriate PPE Level and protective equipment are selected.

The results of the study are reviewed to determine if the calculated incident energy can be
mitigated to lower the incident energy by adjustments to the protective device
overcurrent settings. Two main factors that can reduce the incident energy are, the short
circuit and device operating time. Short circuit current cannot be easily altered, however
operating time can be. The adjustments are made while maintaining selective
coordination between the protective overcurrent devices. These changes should be
reviewed by the facility engineers and approved before making the adjustments in the
actual protective devices.

TechCon North America 2017 – Houston, TX 5


7. Arc Flash Labeling

Arc flash labels are generated based on the results from the arc flash incident energy
analysis and applied to all electrical equipment modeled as bus in the study. Minimum
information required on the labels is detailed in article 130.5. (D) of the NFPA 70E 2015
standard. The facility owner is responsible for documentation, installation and
maintenance of these labels.

8. Report

All study results shall be documented for future reference and d e v e l o p m e n t o f a


safety program. It is recommended to have two hard copies and one soft copy of all the
documents used in the final report, approved by registered professional engineer.

On receipt of the hard copies of the report and all electrical equipment being labeled, are you fully
complying with the AFRA? NO! WHAT TO DO NEXT!

The AFRA report is based on assumptions that the electrical equipment and protective devices are
well maintained. What if a main breaker on a switchboard does not trip in case of a fault, then the
AFRA report is invalid.

Below are a few important points that need to be addressed after AFRA is performed.

1. Report

After an AFRA study has been performed a report is submitted to the facility. The report
should be saved in a designated location that it is easily accessible (e.g. just like the
MSDS's). Any soft copy should be stored on a public drive and file attributes should be
set to read only. It is a very common practice that a report is provided in CD-ROM format
which typically lands in a drawer or desk that may not be easily accessible to others,
especially when it is required the most, l i k e during an electrical safety program audit,
OSHA incident or event, etc.

TechCon North America 2017 – Houston, TX 6


2. Study review and procurement of PPE.

Facility owner or engineer should review the results of the study and determine what
PPE should be purchased for their employees. All PPE should be easily accessible and
checked before every use. To minimize cost, most facilities like to manage by procurement
of PPE for level 2 and level 4, instead of purchasing PPE for all levels. In such cases an
electrician would use level 2 PPE while working on any panels that are labeled level 1 and
level 2. Similarly, one would use level 4 PPE while working on level 3 or level 4 labeled
electrical equipment. Check if any recommendations (item # 4) can be implemented to
reduce the PPE level, which could reduce the cost of the PPE.

3. Single line diagrams.

It is good engineering practice to provide a hardcopy print of the single line diagrams
from the report, which will help during any troubleshooting and most importantly, for
documentation. In a case of changes to the electrical distribution system, mark these
changes and send the same to the study engineer to determine if there are any change to the
arc flash PPE level in the overall electrical system.

4. Implementing Recommendations

Very often the AFRA report includes recommendations that will reduce the PPE level at the
electrical equipment. Generally, the recommendations are not approved and labels are
generated using the “as found” arc flash incident energy results. The most common
question asked i s when and how to implement the changes. This depends on the
type of recommendations. If only a setting change on the circuit breaker is recommended,
typically this should be done during a slowdown or shutdown to avoid any nuisance
tripping (the study engineer should consider upstream and downstream coordination to
avoiding any nuisance tripping). If the recommendation includes retrofitting a circuit
breaker, this will require a complete shutdown of the equipment. The equipment owner
should communicate with the study engineer and classify the priority (taking the financial
and production activity into account) based on report recommendations and develop a plan
to implement the changes. When any recommendation is to be implemented,
communicate the plan with the study engineer and most importantly create new labels for
the affected equipment.

5. Testing and Preventative Maintenance program

An AFRA study is based on the operation of over current protective devices as per the
electrical distribution system. The AFRA report provides values if the over current
devices do not operate in the event of an actual fault. Testing of over current devices is a
very important task of the overall electrical safety program. A proper maintenance
program should be place to increase the reliability of the electrical system and minimize the
chances of an unplanned shutdown.

TechCon North America 2017 – Houston, TX 7


6. Training

All operators or technicians should be properly trained to read and interpret all the
information on an arc flash label. Employees should be trained on how to use the
appropriate PPE and proper storage of PPE (e.g. never put gloves directly in the glove case,
instead the glove opening should be at the bottom of the case). Have a PPE level
description and glove class table (with pictures) in every MCC or Switchgear room to
easily identify the appropriate PPE to be used.

7. Spare labels

Have 5-10% spare labels of each PPE level. Just in case any label is damaged or unreadable
to allow a new label to be applied.

8. Periodic review

According to NFPA 70E, the study needs to be reviewed every five years even if there is
no change to the electrical system. In case of any changes, send the marked one-line to
t h e study engineer to verify if there is any effect on the PPE levels. It is also a good
practice to document the date when the next study should be reviewed.

Conclusion

Every facility should properly protect their employees from exposure to hazardous energy levels.
The best way to prevent arc flash is not to work on energized equipment. But if the equipment
cannot be de-energized, qualified personnel should be trained and provided appropriate PPE for
the task. Just performing an AFRA and labeling the equipment is not all that should be done to
safeguard employee safety. There are other things as mentioned above that should be done after
AFRA has been completed. This paper should not be considered as a comprehensive guide, only a
summary of tasks after AFRA is complete.

References

[1] Occupational Safety and Health Standards, 29CFR, Part 1910, Subpart S, Electrical,
Occupational Safety and Health Administration (OSHA)
[2] 2014 NFPA 70: National Electrical Code (NEC)
[3] NFPA 70B – 2016, Electrical Equipment Maintenance
[4] NFPA 70E – 2015, National Fire Protection Association (NFPA)
[5] IEEE Guide for Performing Arc-Flash Hazard Calculations, IEEE Standard 1584, Institute
of Electrical and Electronics Engineers

TechCon North America 2017 – Houston, TX 8


Biography

Yogi Nimbalkar

Yogi is Power System Studies Manager at Saber Power Services and has more
than 15 years’ experience in the electric power industry. He has held various
positions in electrical industry, including design engineer, technical support
engineer, electrical engineer, senior electrical engineer, at various engineering
firms. His experience includes performing various engineering studies,
designing electrical systems, developing electrical training programs, and
teaching about electrical systems.

Yogi received his M.S. in power engineering degree from California State University, Long
Beach and his B.S. in electrical engineering from Mumbai university.

Contact information Yogi Nimbalkar

Power Systems Studies Manager


Saber Power Services, LLC
ynimbalkar@saberpower.com
Office: 713.222.9102 | Toll Free: 877.912.9102
www.saberpower.com
9841 Saber Power Lane
Rosharon, TX 77583

TechCon North America 2017 – Houston, TX 9

Potrebbero piacerti anche