ESTIMATE
O.R. to Ahmednagar Kada Ashti
Jamkhed Beed road NH-561 (KM 38/0
to 144/500). (Providing KM, 5th KM,
200 m stones).
1 Name of Work
2 Cost of work portion
3 Contengencies
4 Quality Controll Charges
5 Computerisation Charges
6 Centage charges
7 Fund head 3054 M& R to R & B PR to Parbhani - Gangakhed - Isad - Kopara - Nalegaon - B
AGREEMENT
0 Amount of Aggrement 0
1 Name of Agencies
2 Agreement No & Date BI/ /DL/2014-15
3 Date of work order
4 No & Date of Work order
5 Time Limit
6 Due date of Completion
7 No of Bill First R A Bill
8 Serial No & date of Previous bill
9 %age above/below 0.10%
10 EMD
11 SD
12 1st Extension
13 2nd Extension
14 3rd Extension
15 Actual date of Completion
16 Last date of receipt of tender
17 Bill MB Ref
18 Bill Pages
19 M/ment MB Ref
20 Mments Pages
21 M/ments recorded by
22 SDO %age Check %age
23 AE 2 M/ment recording date
24 SDO %age Check adte
25 Date of
Actual date of commissioning
Completion
26 of work
27 Defect Liability period
28 Defect Liability period As per
Agreement
29 Date of start of Defect liability
period
30 Date of End of Defect liability Period
Escalation Bill
Percentage of Component
Date of Receipt of Tender
Date of Work Order
Cement Star Rate
Cement Basic Rate
Steel Star Rate
Steel Basic Rate
Bitumen Star Rate
Bitumen Basic Rate
Period Bills
Ist RA Bill
2nd RA Bill
3rd RA Bill
4th RA Bill
5th RA Bill
6th RA Bill
7th RA Bill
8th RA Bill
9th RA Bill
10th RA Bill
Office Estimate level
Junior Engineer CE Chief Engineer
N H Sub Division No 4, Beed SE Superintending Engineer
National Highway Division, Latur EE Executive Engineer
National Highway Circle Aurangabad Others
P W National Highway Navi Mumbai
Parbhani - Gangakhed - Isad - Kopara - Nalegaon - Bori - Latur - Nitur - Nilanga - Aurad - Shahajani - Bhaiki Road NH - 752 K
Below
Indices
Percentage Jan Feb Mar Apr May Jun Jul
3.77 % 5 5 4
86.33 %
9.90 %
Actual 2 2 2
Actual
Actual
ki Road NH - 752 K
Indices
Aug Sep Oct Nov Dec Av 1st Qtr Av 2nd QtrAv 3rdQtAv 4th Qtr
n Consumtion
GOVERNMENT OF MAHARASHTRA
DETAILED ESTIMATE
NAME OF WORK
O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to
144/500). (Providing KM, 5th KM, 200 m stones).
FUND HEAD :-
MAJOR HEAD :-
MINOR HEAD :-
SERVICE HEAD :-
DEPTT HEAD :-
Estimate is framed in the office of the Executive Engineer.N H Division, Jalna, for the probable
expenses to be incured in the work of--
O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to 144/500).
(Providing KM, 5th KM, 200 m stones).
Rs. 40.77
Lakhs
ESTIMATE ADMINISTRATIVELY APPROVED VIDE
GENERAL ABSTRACT
Say 40.77
Lakhs
NAME OF WORK :- O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to
144/500). (Providing KM, 5th KM, 200 m stones).
The work is included in the proposed O.R. plan for year 2020-21, which is
AUTHORITY :- submitted to MORT & H New Delhi, for state of Maharashtra by Chief
Engineer, National Highway(PW) Navi Mumbai.
RATE :- The rates adopted in this Estimate are as per the SSR of Maharashtra State
for year 2020-21 w.e.f. 01/10/2020.
SPECIFICATIONS :- The work shall be executed as per the Standard Specification laid in the
MORT & H and with the time to time directives of Engineer in Charge.
ABSTRACT
S Ref to
ITEM OF WORK QTY RATE UNIT AMOUNT
No SSR
1 6.02 Providing and fixing _______ metre stones as per I.R.C. standard including
fixing in standard size ______ block including curing, painting, lettering etc.
complete.
a RCC 200 meter stones in CC 1:4:8 3427.00 871.00 Numbers 2,984,917.00
b Fixing 1:2:4 ordinary km. stones in C.C. 1:4:8 107.00 2739.00 Numbers 293,073.00
c Fixing R.C.C. 5th Km. stones, in c.c. 1:4:8 21.00 4615.00 Numbers 96,915.00
TOTAL RS 3,374,905.00
SAY 3,374,905.00
No CSR Ref Description of Item No Length Breadth Height Quantity Total Qty Unit
1 6.02 Providing and fixing _______ metre stones as per I.R.C. standard including fixing in Numbers
standard size ______ block including curing, painting, lettering etc. complete.
Km 30/0 to 144/0/500
a RCC 200 meter stones in CC 1:4:8
4 856.00 + 3.00 3427.000
b Fixing 1:2:4 ordinary km. stones in C.C. 1:4:8
1 107.00 107.000
c Fixing R.C.C. 5th Km. stones, in c.c. 1:4:8
1 21 21.000