Sei sulla pagina 1di 18

S No Designation Name

1 Assistant Engineer(Gr II)


2 Sub divisional Engineer R.V. Bhopale
3 Executive Engineer O.R. Swami
4 Superintending Engineer
5 Chief Engineer

1 Serial No as per Budjet Booklet


2 Electorate Constituency
3 Budjet Inclusion year
4 Item No
5 Budjet Item No/Pg No
6 Approximate Cost
7 Expediture upto 3/09
8 Expediture upto 8/09
9 Expediture upto 3/10
10 Bal Amount
11 Expenditure 2009-10
12 BP for 2009-10
13 Demand 2009-10
14 AA Cost
15 No & Date
16 Scope of AA
17 T S Cost
18 No & Date
19 Scope of TS
20 Present Status

ESTIMATE
O.R. to Ahmednagar Kada Ashti
Jamkhed Beed road NH-561 (KM 38/0
to 144/500). (Providing KM, 5th KM,
200 m stones).
1 Name of Work
2 Cost of work portion
3 Contengencies
4 Quality Controll Charges
5 Computerisation Charges
6 Centage charges
7 Fund head 3054 M& R to R & B PR to Parbhani - Gangakhed - Isad - Kopara - Nalegaon - B

AGREEMENT
0 Amount of Aggrement 0
1 Name of Agencies
2 Agreement No & Date BI/ /DL/2014-15
3 Date of work order
4 No & Date of Work order
5 Time Limit
6 Due date of Completion
7 No of Bill First R A Bill
8 Serial No & date of Previous bill
9 %age above/below 0.10%
10 EMD
11 SD
12 1st Extension
13 2nd Extension
14 3rd Extension
15 Actual date of Completion
16 Last date of receipt of tender
17 Bill MB Ref
18 Bill Pages
19 M/ment MB Ref
20 Mments Pages
21 M/ments recorded by
22 SDO %age Check %age
23 AE 2 M/ment recording date
24 SDO %age Check adte
25 Date of
Actual date of commissioning
Completion
26 of work
27 Defect Liability period
28 Defect Liability period As per
Agreement
29 Date of start of Defect liability
period
30 Date of End of Defect liability Period

E-mail Adress of Sub division


E-mail Adress of Contractor

Escalation Bill

Percentage of Component
Date of Receipt of Tender
Date of Work Order
Cement Star Rate
Cement Basic Rate
Steel Star Rate
Steel Basic Rate
Bitumen Star Rate
Bitumen Basic Rate

Basic Component @ the month of


Receipt of Tender
Labour KI 125
Material K2
POL K3
Cement K4
Steel K5
Bitumen K6

Period Bills
Ist RA Bill
2nd RA Bill
3rd RA Bill
4th RA Bill
5th RA Bill
6th RA Bill
7th RA Bill
8th RA Bill
9th RA Bill
10th RA Bill
Office Estimate level
Junior Engineer CE Chief Engineer
N H Sub Division No 4, Beed SE Superintending Engineer
National Highway Division, Latur EE Executive Engineer
National Highway Circle Aurangabad Others
P W National Highway Navi Mumbai

Parbhani - Gangakhed - Isad - Kopara - Nalegaon - Bori - Latur - Nitur - Nilanga - Aurad - Shahajani - Bhaiki Road NH - 752 K

Below
Indices
Percentage Jan Feb Mar Apr May Jun Jul

3.77 % 5 5 4
86.33 %
9.90 %
Actual 2 2 2
Actual
Actual

Vr No Date Gross cost of Work donRecovery of Schedule A Bitumen Consumtion


National Highway Circle,Bandhkam Bhavan Adalat road Aurangabad
National Highway (P W) Konkan Bhavan Navi Mumbai

ki Road NH - 752 K
Indices
Aug Sep Oct Nov Dec Av 1st Qtr Av 2nd QtrAv 3rdQtAv 4th Qtr

5 #DIV/0! #DIV/0! #DIV/0!


#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0!

n Consumtion
GOVERNMENT OF MAHARASHTRA

P W NATIONAL HIGHWAY NAVI MUMBAI

National Highway Division, Latur

N H Sub Division No 4, Beed

DETAILED ESTIMATE

NAME OF WORK

O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to
144/500). (Providing KM, 5th KM, 200 m stones).

ESTIMATED COST Rs #REF! #REF!


ESTIMATE

DIVISION :- National Highway Division, Latur

SUB DIVISION :- N H Sub Division No 4, Beed

FUND HEAD :-

MAJOR HEAD :-

MINOR HEAD :-

SERVICE HEAD :-

DEPTT HEAD :-

Estimate is framed in the office of the Executive Engineer.N H Division, Jalna, for the probable
expenses to be incured in the work of--
O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to 144/500).
(Providing KM, 5th KM, 200 m stones).

Rs. 40.77
Lakhs
ESTIMATE ADMINISTRATIVELY APPROVED VIDE

ESTIMATE TECHNICALLY SANCTIONED VIDE

ESTIMATE PREPARED BY S.K. Munde, Sect. Engineer.

ESTIMATE CHECKED BY R.V. Bhople Sub divisional Engineer

Sub Divisional Engineer Executive Engineer


N H Sub Division No 4, Beed National Highway Division, Latur
NAME OF WORK :- Periodical renewal to existing carriageway in Jamkhed to Sautada section
of Ahmednagar - Ashti - Jamkhed - Beed NH-561 road from KM 73/00 to
90/00 on EPC mode in the state of Maharashtra.

GENERAL ABSTRACT

1. Cost of Work Portion Rs. 3,374,905.00

2. Add 12% GST Rs. 404,989.00

3. Add 2.80 % Contingency Charges Rs. 94,497.00

4. Add 3 % Supervision Charges Rs. 101,247.00

5.Add 3 % Agency charges Rs. 101,247.00

Grand Total Rs. 4,076,885.00

Say 40.77
Lakhs

Sub Divisional Engineer Executive Engineer


N.H. Sub Division No. 4, Beed National Highway Division, Latur

Superintending Engineer Secretary (N.H.)


National Highway Circle Public Works Department
Aurangabad Konkan Bhavan, Navi Mumbai.
Chief Engineer Superintending Engineer
P W National Highway Navi Mumbai National Highway Circle Aurangabad
1 Amount of Estimate #REF!

3 Add 1.50 % w/c charges ###

Total Amount Rs. #REF!

Superintending Engineer Chief Engineer


National Highway (P. W.) Maharashtra.

Sub Divisional Engineer Executive Engineer


N.H.way Sub-Dn.51 National Highway Dn. No.14
Nagpur Nagpur
nal Highway Dn. No.14
GENERAL DESCRIPTION

NAME OF WORK :- O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to
144/500). (Providing KM, 5th KM, 200 m stones).

ESTIMATED COST :- Rs 4076885.00

The work is included in the proposed O.R. plan for year 2020-21, which is
AUTHORITY :- submitted to MORT & H New Delhi, for state of Maharashtra by Chief
Engineer, National Highway(PW) Navi Mumbai.

INTRODUCTION & NECESSITY :-


The New National Highway No. 561 starts from Ahmednagar
has been newly named as Ahmednagar Kada Ashti Jamkhed Beed .

The stretch of the road from Ahmednagar to Beed has no


KM, 5th KM and 200 m stones of N.H. standard. Hence the estimate is
framed in accordance to the availability of funds.
PROVISIONS:-
Following are the provisions made in this estimate.

1) Providing and fixing KM, 5th KM and 200 m stones.

RATE :- The rates adopted in this Estimate are as per the SSR of Maharashtra State
for year 2020-21 w.e.f. 01/10/2020.

SPECIFICATIONS :- The work shall be executed as per the Standard Specification laid in the
MORT & H and with the time to time directives of Engineer in Charge.

Sub Divisional Engineer Executive Engineer


N H Sub Division No 4, Beed National Highway Division, Latur
O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to 144/500). (Providing KM, 5th KM, 200 m stones).

ABSTRACT

S Ref to
ITEM OF WORK QTY RATE UNIT AMOUNT
No SSR
1 6.02 Providing and fixing _______ metre stones as per I.R.C. standard including
fixing in standard size ______ block including curing, painting, lettering etc.
complete.
a RCC 200 meter stones in CC 1:4:8 3427.00 871.00 Numbers 2,984,917.00
b Fixing 1:2:4 ordinary km. stones in C.C. 1:4:8 107.00 2739.00 Numbers 293,073.00
c Fixing R.C.C. 5th Km. stones, in c.c. 1:4:8 21.00 4615.00 Numbers 96,915.00

TOTAL RS 3,374,905.00
SAY 3,374,905.00

Sub Divisional Engineer Executive Engineer


N H Sub Division No 4, Beed National Highway Division, Latur
O.R. to Ahmednagar Kada Ashti Jamkhed Beed road NH-561 (KM 38/0 to 144/500). (Providing KM, 5th KM, 200 m
stones).
MEASUREMENT SHEET

No CSR Ref Description of Item No Length Breadth Height Quantity Total Qty Unit

1 6.02 Providing and fixing _______ metre stones as per I.R.C. standard including fixing in Numbers
standard size ______ block including curing, painting, lettering etc. complete.

Km 30/0 to 144/0/500
a RCC 200 meter stones in CC 1:4:8
4 856.00 + 3.00 3427.000
b Fixing 1:2:4 ordinary km. stones in C.C. 1:4:8
1 107.00 107.000
c Fixing R.C.C. 5th Km. stones, in c.c. 1:4:8
1 21 21.000

Sub Divisional Engineer Executive Engineer


N H Sub Division No 4, Beed National Highway Division, Latur

Potrebbero piacerti anche