TIME SCHEDULE CURVE-S

PROJECT NAME : COMPLETE INSTALLATION FOR IKS DEMIN WATER & POLISHER PLANT
OWNER : PT. INDAH KIAT PULP & PAPER - SERANG
CONTRACTOR : SCYY / CV. HASTEK
DOCUMENT NO : IKS-SCYY/HT-S-CURVE-VII-001
REV : 3

JULI 2020 AGUSTUS 2020 SEPETEMBER 2020 OKTOBER 2020 NOVEMBER 2020 DESEMEBER 2020

MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE MINGGU KE


NO ITEM DESCRIPTION QTY UNIT BOBOT (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1 - 8 July 9 - 15 July 16 - 22 July 23 - 29 July 30 July - 5 Aug 6 - 12 Aug 13 - 19 Aug 20 - 26 Aug 27 Aug - 2 Sep 3 - 9 Sep 10 - 16 Sep 17 - 23 Sep 24 - 30 Sep 1 - 7 Okt 8 - 14 Okt 15 - 21 Okt 22 - 28 Okt 29 Okt - 4 Nov 5 - 11 Nov 12 - 18 Nov 19 - 25 Nov 26 - 2 Des 3- 9 Des 10 - 16 Des 17 - 23 Des 24 - 31 Des

I Preparation

Site Office 1 Lot 0.64 0.21 0.21 0.21

Submitted Document & Procedure 1 Lot 0.32 0.11 0.11 0.11

Direction Kit (Shelter Rest area, Praying Room, Washtafhel, etc) 1 set 0.48 0.16 0.16 0.16

Test Welder 1 Lot 0.32 0.16 0.16

Preparing Access 1 Lot 0.64 0.21 0.21 0.21

2 Tank Construction -

Fresh Water Storage Tank V=500m3 Φ8000×10000mm 1 set 6.24 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78

UF Feed Water Storage Tank V=300m3 Φ6400×10000mm 1 set 5.28 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53

Ro Feed Water Storage Tank V=500m3 Φ8000×10000mm 1 set 6.24 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62

Degassified Water Tank V=200m3 Φ6400×6500mm 1 set 5.28 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59

Demin Water Tank V=500m3 Ø8000×10000mm 2 set 12.48 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25

Condensate Raw Water Tank V=500m3 Ø8000×10000mm 1 set 6.24 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62

Sedimentation Tank (Clarifier) V=200m3 Ø8000×4500mm


(Including mud scraper installation)
2 set 10.56 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

3 Mechanical Construction -

Iron Tower Q=200m3/h Φ2800×3300mm 2 set 0.35 0.12 0.12 0.12

Mmf Filter Q=90m3/h Φ3200×3300mm 4 set 0.70 0.14 0.14 0.14 0.14 0.14

Self Cleaning Filter Q=180m3/h Φ500×1100mm 2 set 0.29 0.10 0.10 0.10

Ultra Filtration Q=150m3/h Recovery rate:90% 2 set 0.32 0.16 0.16

Cartidge Filters Q=150m3/h 2 set 0.32 0.16 0.16

Reverse Osmosis Q=120m3/h recovery >75%, Salt rejection


>99%
2 set 0.32 0.11 0.11 0.11

Degasser Φ1800×3200mm,Q=200m3/h 1 set 0.16 0.16

Mixed Bed Q=120m3/h Φ2000×5000mm 2 set 0.32 0.08 0.08 0.08 0.08

Silicon Bed Q=120m3/h Φ2000×5000mm 2 set 0.32 0.11 0.11 0.11

Regeneration Effluent Neutralization System And CIP System for


Demin Water System
1 lot 0.18 0.09 0.09

Chemical Dosing System 1 lot 0.18 0.09 0.09

Heat Exchanger Q=150m3/h 4 set 0.58 0.29 0.29

Anthracite filter Q=150m3/h,φ3200*4500mm 2 set 0.29 0.14 0.14

Mixed Bed Q=150m3/h Φ2200×5000mm 2 set 0.32 0.11 0.11 0.11

Regenaration Effluent Neutrlization System For CPU 1 lot 0.18 0.09 0.09

Compressed Air System Installation 1 Lot 0.21 0.07 0.07 0.07

All Chemical Tanks 16 sets 2.30 0.38 0.38 0.38 0.38 0.38 0.38

All Pumps 34 Sets 1.63 0.27 0.27 0.27 0.27 0.27 0.27

All Valves 1 lot 0.30 0.06 0.06 0.06 0.06 0.06

All Pipng & Fittings & Support 1 Lot 20.80 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49

4 Electric Construction -

All Wire And Cable 1 lot 0.96 0.16 0.16 0.16 0.16 0.16 0.16

Cable Tray And Support 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

Mcc Control Cabinet 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

Plc Control Cabinet 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

Local Control 1 lot 0.96 0.32 0.32 0.32

All Grounding 1 lot 0.80 0.20 0.20 0.20 0.20

Mcc Room And Outdoor Lighting 1 lot 0.64 0.13 0.13 0.13 0.13 0.13

Smoke Alarming For Mcc Room 1 lot 0.64 0.16 0.16 0.16 0.16

Air Conditioner For Mcc Room 1 lot 0.80 0.27 0.27 0.27

Operation Station Installation For Mcc Room 1 lot 0.48 0.16 0.16 0.16

5 Instrument And Automatic Installation -

All Local Instrument Installation 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

All Remote Instrument Installation 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

All Instrument Wiring Installation 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

All Air Source Tube Installation 1 lot 0.96 0.19 0.19 0.19 0.19 0.19

6 Engineering Quality Test -

Pipe Weld Joint Pressure Test 1 lot 0.64 0.11 0.11 0.11 0.11 0.11 0.11

Water Tank Weld Joint Water Filling Test 1 lot 0.64 0.13 0.13 0.13 0.13 0.13

All Motor Powre-On Test 1 lot 0.48 0.10 0.10 0.10 0.10 0.10

All Valve Switch Test 1 lot 0.48 0.10 0.10 0.10 0.10 0.10

All Instrument Power-On Test 1 lot 0.48 0.10 0.10 0.10 0.10 0.10

All Electric Power-On Test 1 lot 0.48 0.10 0.10 0.10 0.10 0.10

7 TOTAL 100 0.21 0.69 0.85 5.33 4.57 4.57 5.35 5.35 5.35 6.84 6.84 6.84 6.25 4.35 3.20 3.42 6.08 5.96 4.20 3.73 3.24 2.92 2.10 0.62 0.62 0.51

8 BOBOT RENCANA KUMULATIF (%) 0.21 0.91 1.76 7.09 11.66 16.23 21.58 26.93 32.29 39.12 45.96 52.80 59.05 63.40 66.60 70.01 76.10 82.06 86.25 89.99 93.22 96.15 98.25 98.87 99.49 100.00

9 BOBOT REALISASI (%) 0.21 0.69 4.20 4.00 3.16 6.20 5.52 6.23

9 BOBOT REALISASI KUMULATIF(%) 0.21 0.91 5.11 9.10 12.26 18.46 23.98 30.21

10 SELISIH (%) - - 3.35 -1.33 -1.41 1.63 0.16 0.88


TIME SCHEDULE CURVE-S

PROJECT NAME : COMPLETE INSTALLATION FOR IKS DEMIN WATER & POLISHER PLANT
OWNER : PT. INDAH KIAT PULP & PAPER - SERANG
CONTRACTOR : SCYY / CV. HASTEK
DOCUMENT NO : IKS-SCYY/HT-S-CURVE-VII-001
REV : 1

JULI 2020 AGUSTUS 2020 SEPETEMBER 2020 OKTOBER 2020

NO ITEM DESCRIPTION QTY UNIT BOBOT (%) MINGGU KE MINGGU KE MINGGU KE MINGGU KE

1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 5

I Preparation 1 - 8 July 9 - 15 July 16 - 22 July 23 - 29 July 30 July - 5 Aug 6 - 12 Aug 13 - 19 Aug 20 - 26 Aug 27 Aug - 2 Sep 3 - 9 Sep 10 - 16 Sep 17 - 23 Sep 24 - 30 Sep 1 - 6 Okt 7 - 13 Okt 14 - 20 Okt 21 - 27 Okt 28 - 31 Okt

Site Office 1 Lot 0.70 0.23 0.23 0.23


Submitted Document & Procedure 1 Lot 0.35 0.12 0.12 0.12
Direction Kit (Shelter Rest area, Praying Room, Washtafhel, etc) 1 set 0.53 0.18 0.18 0.18
Test Welder 1 Lot 0.35 0.18 0.18
Preparing Access 1 Lot 0.70 0.23 0.23 0.23
2 Tank Construction -
Fresh Water Storage Tank V=500m3 Φ8000×10000mm 1 set 6.14 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
UF Feed Water Storage Tank V=300m3 Φ6400×10000mm 1 set 3.82 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38
Ro Feed Water Storage Tank V=500m3 Φ8000×10000mm 1 set 6.14 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61
Degassified Water Tank V=200m3 Φ6400×6500mm 1 set 2.77 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31
Demin Water Tank V=500m3 Ø8000×10000mm 2 set 12.28 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23
Condensate Raw Water Tank V=500m3 Ø8000×10000mm 1 set 6.14 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
Sedimentation Tank (Clarifier) V=200m3 Ø8000×4500mm
(Including mud scraper installation)
2 set 6.95 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
3 Mechanical Construction -
Iron Tower Q=200m3/h Φ2800×3300mm 2 set 0.39 0.13 0.13 0.13
Mmf Filter Q=90m3/h Φ3200×3300mm 4 set 0.77 0.39 0.39
Self Cleaning Filter Q=180m3/h Φ500×1100mm 2 set 0.32 0.11 0.11 0.11

Ultra Filtration Q=150m3/h Recovery rate:90% 2 set 0.35 0.18 0.18


Cartidge Filters Q=150m3/h 2 set 0.35 0.18 0.18
Reverse Osmosis Q=120m3/h recovery >75%, Salt rejection
>99%
2 set 0.35 0.12 0.12 0.12

Degasser Φ1800×3200mm,Q=200m3/h 1 set 0.18 0.18


Mixed Bed Q=120m3/h Φ2000×5000mm 2 set 0.35 0.18 0.18
Silicon Bed Q=120m3/h Φ2000×5000mm 2 set 0.35 0.12 0.12 0.12
Regeneration Effluent Neutralization System And CIP System for
Demin Water System
1 lot 0.19 0.10 0.10
Chemical Dosing System 1 lot 0.19 0.10 0.10
Heat Exchanger Q=150m3/h 4 set 0.63 0.21 0.21 0.21
Anthracite filter Q=150m3/h,φ3200*4500mm 2 set 0.32 0.16 0.16
Mixed Bed Q=150m3/h Φ2200×5000mm 2 set 0.35 0.18 0.18
Regenaration Effluent Neutrlization System For CPU 1 lot 0.19 0.19
Compressed Air System Installation 1 Lot 0.23 0.08 0.08 0.08
All Chemical Tanks 16 sets 2.53 0.42 0.42 0.42 0.42 0.42 0.42
All Pumps 34 Sets 1.79 0.30 0.30 0.30 0.30 0.30 0.30
All Valves 1 lot 0.33 0.08 0.08 0.08 0.08
All Pipng & Fittings & Support 1 Lot 26.31 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39
4 Electric Construction -
All Wire And Cable 1 lot 1.05 0.18 0.18 0.18 0.18 0.18 0.18
Cable Tray And Support 1 lot 1.05 0.15 0.15 0.15 0.15 0.15 0.15 0.15
Mcc Control Cabinet 1 lot 1.05 0.26 0.26 0.26 0.26
Plc Control Cabinet 1 lot 1.05 0.26 0.26 0.26 0.26
Local Control 1 lot 1.05 0.35 0.35 0.35
All Grounding 1 lot 0.88 0.29 0.29 0.29
Mcc Room And Outdoor Lighting 1 lot 0.70 0.14 0.14 0.14 0.14 0.14
Smoke Alarming For Mcc Room 1 lot 0.70 0.14 0.14 0.14 0.14 0.14
Air Conditioner For Mcc Room 1 lot 0.88 0.29 0.29 0.29
Operation Station Installation For Mcc Room 1 lot 0.53 0.26 0.26
5 Instrument And Automatic Installation -
All Local Instrument Installation 1 lot 1.05 0.35 0.35 0.35
All Remote Instrument Installation 1 lot 1.05 0.35 0.35 0.35
All Instrument Wiring Installation 1 lot 1.05 0.26 0.26 0.26 0.26
All Air Source Tube Installation 1 lot 1.05 0.35 0.35 0.35
6 Engineering Quality Test -
Pipe Weld Joint Pressure Test 1 lot 0.70 0.18 0.18 0.18 0.18
Water Tank Weld Joint Water Filling Test 1 lot 0.70 0.18 0.18 0.18 0.18
All Motor Powre-On Test 1 lot 0.53 0.18 0.18 0.18
All Valve Switch Test 1 lot 0.53 0.18 0.18 0.18
All Instrument Power-On Test 1 lot 0.53 0.18 0.18 0.18
All Electric Power-On Test 1 lot 0.53 0.18 0.18 0.18
7 TOTAL 100 0.23 0.76 0.94 4.82 6.51 6.51 7.15 7.47 8.93 9.87 9.92 9.27 8.62 7.45 6.04 3.42 1.05 1.05
8 BOBOT RENCANA KUMULATIF (%) 0.23 0.99 1.93 6.75 13.25 19.76 26.90 34.38 43.30 53.17 63.09 72.36 80.99 88.44 94.48 97.90 98.95 100.00
9 BOBOT REALISASI (%) 0.23 0.99 1.93
10 SELISIH (%)