Sei sulla pagina 1di 15

Association Sonatrach – First Calgary

Petroleums
MLE Field (405)
Maintenance Department

 FLANGE MANAGEMENT
PRESENTATION

SH-FCP (Menzel Ledjmet East, Block


405B, Algerie1
1- Purpose
2- Scope (Domaine d’application)
3- Flange management guide lines
4- Flange management system
5- Role and responsibility

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 2
The objective is to ensure the minimum conditions to the management of flanges
and bolts during the isolation of equipment's and pipe lines.

The goal is to define the security measures during the execution phase. Theses
measures must comply with the requirements of the specifications (Process ,
Integrity , Maintenance and HSE )

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 3
The flange Management applies for all isolation work by blind flanges or spade
and all bolt tightening operations .

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 4
APG SCOPE OF WORK MARKED P&ID POSITIVE
ISOLATION PLAN
ISOLATION
MAINTENANCE SCOPE OF WORK

MOC SCOPE OF WORK

FLANGE REGISTER

PTW ISOLATION • P&ID NUMBER INDIVIDUAL FLANGE


• VESSEL NUMBER STEP
• FLANGE SIZE DATE, SIGNT/SUPV
• LINE NUMBER
• GASKET TYPE
JOINT CONTROL • TORQUE VALUE
INTEGRITY REGISTER • 4 STEPS
LEAK TESTING
VESSEL • DATE, SUPV NAME
PRESSURE VALUE
• FLANGE MGT SUPV SIGNT

VISIBLE BOARD
COLORED TAGS

VISIBLE VESSELS STATUS


OPENING, CLEANING,
INSPECTION

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 5
Tightening of flange bolts procedure

Sequence Criss-Cross Sequence Adjacent

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 6
Tightening torque

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 7
SH-FCP (Menzel Ledjmet East,
Block 405B, Algerie 8
SH-FCP (Menzel Ledjmet East,
Block 405B, Algerie 9
NB : The flange tag will be
attached to the flange in
place.

NB : gasket removed must


be attached to the flange by
drilling bolts in order to
check the same quality and
serial when we refit the
new gasket.

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 10
SH-FCP (Menzel Ledjmet East,
Block 405B, Algerie 11
SH-FCP (Menzel Ledjmet East,
Block 405B, Algerie 12
Document to follow all broken
Flanges from opening to leak testing

SH-FCP (Menzel Ledjmet East,


Block 405B, Algerie 13
SH-FCP (Menzel Ledjmet East,
Block 405B, Algerie 14

Potrebbero piacerti anche