1. The Separator cum Storage tank function is to remove the water particles from the
3. Collect the following inputs from API. Before start the drawings.
3D Model drawings
P & I Drawings.
Material Specification
4. Verify the following listed item with received inputs from API.
a) For Shell and dished end size (OD, Thk. and length) and details ref. ASME
b) For Steam Inlet / outlet Nozzles and down comer nozzle location, orientation,
size (OD, Thk. and length) and edge preparation details ref. ASME calculation
Sheet, circulation analysis letter, Startup system arrangement, PPA – Section Side
d) For Vortex Breaker location ref. Circulation analysis letter and orientation, size &
e) For internals (funnel) location ref. Circulation analysis letter and details as per
f) For support lug location, Orientation and size ref. individual sheet sent by API.
g) Vent nozzle it may be pipe or standard 1.5” socket weld end connection ref.
h) For Upper water level transmitter (Standard 1” socket weld) location, orientation
and qty. ref. ASME calculation sheet and circulation analysis letter.
j) For Lower water level transmitter location, orientation and size (OD, Thk. and
length) and details ref. in ASME Calculation Sheet and circulation analysis letter.
k) Inspection Nozzle with End plug Size (OD, Thk. and length) and details ref.
l) Inspection nozzle with end plug size(OD, Thk. and length) and edge preparation
m) For Nozzle edge preparation and tolerance ref. ASME calculation sheet.
n) Pressure, Temperature and Material specification ref. ASME calculation sheet &
5. Provide the multiple circumference shop weld, If shell length more than
7. Check the shell and dished end thickness MWT (or) AWT.
8. Locate the inspection nozzle below the steam outlet nozzle and its should be
accessible from the platform and orientation must be front of the boiler.
9. Steam Inlet & Outlet Nozzles are in standard 5-degree slope, respective to
10. Provide the Standard 1” (socket weld) earthing boss and location should be 5”
12. For Nozzle Edge Preparation detail & tolerances. Ref. ASME calculation sheet.
13. Provide Erection lug for Down Comer Nozzle as per API. Standard.
14. Provide Surface T.C Pad and location should be 6” from bottom of shell.
15. Provide Insulation Pad and pitch not more than 55” to 60”
17. Provide the necessary views, details and welding details as per reference drgs.
18. No manhole.