1) What is the minimum distance to be maintained between two welds in a pipe?

The thumb rule is that the minimum distance between adjacent butt weld is 1 D . if not, it is never closer than 1 – 1/2 “ . this is
Piping Stress Analys
supposedly to prevent the overlap of HAZs. minimum spacing of circumferential weld between centerlines shall not be less
Course
! is greater.
than 4 times the pipe wall thickness or 25 mm whichever

2) What are weldolet and socket? And where they are used?

Welolet and sockolet are basically self – reinforced fitting. Weldolet is used for butt weld branch connection where standard
tee is not available due to size restriction and the piping is of critical/high pressure service. sockolet is used for socket welding
branch connection , which require reinforcing pad

3)What do you mean by Jacketed piping ?

Piping which is recognized as providing the most uniform application of heat to the process , as well as maintaining the most
uniform processing temperatures where steam tracing is not capable of maintaining the temperature of fluid constant. Usually
used for molten sulphur, polymers service.
Subscribe to Our Newsletter
4)What is the basis of using of short radius & long radius elbow ?

Long radius are used for small pressure drop whereas short radius elbow are used high pressure drops. For catalyst flow Your email address
vary long radius are used

5)Normally where do we use the following ? Trending on Social Sites


A. Eccentric reducers.
B. Concentric reducers. Process Flow Diagr
(OR) System Flow
A. Eccentric reducers – pump suction to avoid cavitation, To maintain elevation ( BOP ) in rack.
Diagram
B. Concentric reducers – Pump discharge, vertical pipeline etc.

6)How the pipe fittings are classified based on end connections? What do you Mean
NPSH? How do you
No, air pockets may form if concentric reducer is used at pump suction, which results in cavitation and cause damage to
Calculate it?
pump. To avoid this problem, eccentric reducer with Flat Side Up (FSU) is used in pump suction

7)How the pipe fittings are classified based on end connection ? Question Related to
Pipe fittings are classified based on end connection as Mechanical Design
Fundamentals:- Par
A. socket weld fittings.
B. screwed end fittings
Stress / Flexibility
C. beveled end or butt weld fittings
Analysis
D. spigot socket fittings
E. buttress end fittings

https://www.oilandgasclub.com/process-piping-interview-questions/ 07/10/17, 2?13 PM


Page 1 of 4
8)From which side of pipe will you take a branch connection ?

When fluid is gas, air or steam and cryogenic service – topside when fluid is liquid – bottom side

9)What is the difference between pipe and tube ?

Pipe is identified by NB and thickness is defined by schedule whereas tube is identified by OD & its thickness as BWG (
Brimingham Wire Gauge or 1/100 inch ).

10)From which size onwards NB of pipe is equal to OD of pipe ?

From the size 14 “ and onwards NB = OD of pipe

11)What should be the radius of long radius elbow ? Suggested For You

1.5 D ( where ‘ D’ is the diameter of the pipe )


A P&ID Should Incl
12)How can flanges be classified based on pipe Attachment? and Should not Incl

Flanges can be classified based on pipe attachment as-slip-on. The slip on type flanges are attached by welding inside as
well as outside. These flanges are of forged construction
Socket weld – The socket weld flanges are welded on one side only. These are used for small bore line only . Piping Stress Types

Screwed – The screwed-on flanges are used on pipe lines where welling cannot be carried out
Lap joint – The lap joint flanges are used with stub ends. The stub ends are welded with pipe & flanges are kept loose over
the same
Piping Design Engi
Welding neck – The welding neck flanges are attached by butt welding to the pipe. These are used mainly for critical service
Interview Questions
where the weld joints need radiographic inspection . 6 (Drums)
Blind – The blind flanges are used to close the ends which need to be reopened
Reducing – The reducing flanges are used to connect between larger and smaller size without using a reducer, In case of
Question Related to
reducing flanges, the thickness of flange be that of the higher diameter. Weld Heat Treatme
Integral – Integral flanges are those, which are cast along with the piping component or equipment

About Oilandgasclub.com
Oilandgasclub.com is an international oil and gas (online & offline) conference technical training org from India.
Oilandgasclub.com 3000+ professionals trained 150,000 hours of classes delivered 500+ expert trainers
available and 3600+ respondents 30+ countries 80+ team. Blogs about technical tips at this blog. Contact or
more about customized technical training from this page

70+ courses 7 venues 5 categories

OILANDGASCLUB.COM HAS PUBLISHED 150+ ARTICLES IN THIS BLOG Subscribe Your email address Submit

Share:
News & Articles

Cathodic Protection
More From OilandGasClub Summit CPS-2016
Details

Piping Design Engin


Salary (INDIA)
Valves What is Caesar II? & History of Ultrasonics Piping Design Questions Related to
What is the Engineer Interview Pipe Fittings:- Part-1
Application o... Questions Part-12...

Oil and Gas Club C


Details
Tagged with: CAESAR TRAINING IN CHENNAI FUNDAMENTALS OF PIPING DESIGN HOW TO BECOME A PIPING DESIGNER

PDMS COURSE IN CHENNAI PDMS COURSE TRAINING INSTITUTE T NAGAR CHENNAI CHENNAI TAMIL NADU PDS COURSE IN NOIDA

PIPE DESIGN COURSE IN CHENNAI PIPELINE DESIGN COURSE PIPELINE DESIGN COURSE IN CHENNAI PIPING COURSE CHENNAI TAMIL NADU
Russia will be Bigge
PIPING COURSE IN CHENNAI PIPING DESIGN COURSE IN CHENNAI PIPING DESIGN COURSE IN CHENNAI WITH PLACEMENT Loser From Oil Pric
WARNA IEA
PIPING DESIGN COURSE IN HYDERABAD PIPING DESIGN COURSE IN MUMBAI PIPING DESIGN COURSE IN NOIDA

PIPING DESIGN ENGINEER INTERVIEW QUESTIONS PIPING ENGINEERING COURSE IN CHENNAI PIPING TRAINING COURSE IN CHENNAI

https://www.oilandgasclub.com/process-piping-interview-questions/ 07/10/17, 2?13 PM


Page 2 of 4
Promoted Articles

Piping Design Course SP3D Training Piping Engineering Course

 ⋆  ⋆  ⋆  ⋆  ⋆   ⋆  ⋆  ⋆  ⋆  ⋆   ⋆  ⋆  ⋆  ⋆  ⋆ 


20+ Sub Topic Certified Trainer Time Flexibility
700+ Interview Questions 700+ Interview Questions Certified Trainer
Industry Expert Training Job Assistance 5 Mock Test

Tekla Training PDMS Training CAESAR Training

 ⋆  ⋆  ⋆  ⋆  ⋆   ⋆  ⋆  ⋆  ⋆  ⋆   ⋆  ⋆  ⋆  ⋆  ⋆ 

70 Hours Instructor Led Training 3+ Live Projects 700+ Interview Questions


Mentoring Support 700+ Interview Questions Free E-learning materials
24/7 E-learning Access 24/7 E-learning Access 5 Mock Test

Related Articles

Abbreviations for About the CAESAR II Placing Dead Weight What is Oil Refinery ? What do Petroleum
Piping Drawings Documentation Support August 3, 2017 Engineers do?
9 days ago September 5, 2017 August 18, 2017 July 13, 2017

Most Important Flexibility Analysis Responsibilities of Role of the Pipe Field American Petroleum
Documents Produced May 22, 2017 Piping Construction Engineer in Safety Institute – (API)
by Piping Engineer Engineers April 25, 2017 April 12, 2017
June 13, 2017 May 6, 2017

2 Comments on "Process Piping Interview Questions"

Add Your Comment Here

Sort by: newest | oldest | most voted

https://www.oilandgasclub.com/process-piping-interview-questions/ 07/10/17, 2?13 PM


Page 3 of 4
Vivekananthan 1 year 2 months ago

I like its very basic questions but there asking too much deep, can add on what kind of external corrosion and internal
Guest corrosion in in-service piping

0 $ | #- Share

naveen 1 year 10 months ago

I like this page. please share critical piping design consideration with Q & Ans along merits and demerits so as we relate
Guest
ourselves easily and its very easy to understand…

4 $ | #- Share

Top Courses Work With Us For Business Company

❯ Structural Design ❯ IOSH Managing Safely ❯ SSPC Training Become an Instructor Corporate Training Mission and Vision
❯ Piping Design ❯ IOSH Working Safely ❯ MEP Training Blog as Guest Courses Offered In-house Solutions
❯ Instrumentation Design ❯ NEBOSH Training ❯ NDT Training Become an Affiliate Why Oilandgasclub.com

❯ Electrical Design ❯ NEBOSH International Diploma ❯ ASME

❯ Piping Engineering ❯ OSHA ❯ API

❯ Piping Stress Analysis ❯ Oil and Gas Safety ❯ CSWIP

❯ Piping Lead Engineering ❯ Offshore Safety ❯ QA/QC

❯ Primavera P6 ❯ Industrial Safety ❯ HTRI

❯ Primavera Risk Analysis ❯ Fire and Safety ❯ ASPEN

Top Courses Work With Us For Business Company


Follow Us! Subscribe to Our Newsletter Learn Online Register Webinars Student Login

Your email address Submit How to its Work Click Here for Webinars

About Oilandgasclub Contact Us Partner Us Career Job Listing Events Membership Blog News Policies In-house Solutions Build Your Po

Copyright © 2017 Acusstreak. All rights reserved. The certification names and logos are the trademarks of their respective owners.

Follow Us! Subscribe to Our Newsletter Learn Online Register Webinars Student Login

https://www.oilandgasclub.com/process-piping-interview-questions/ 07/10/17, 2?13 PM


Page 4 of 4

Potrebbero piacerti anche