CASETA DE BOMBEO - URBANIZACION RESIDENCIAL SAN CARLOS

¤ Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)


0 01.00.00 OBRAS PROVISIONALES
0 01.01.01 CASETA DE GUARDIANIA M2 10.00 86.40 864.00
0 01.01.02 ALMACEN PARA OBRA M2 20.00 120.80 2,416.00
0 01.01.03 GUARDIANIA PARA LA OBRA MES 2.00 998.75 1,997.50
0 01.01.04 POZA DE AGUA 2.75X2.75X1.10M UND 1.00 493.78 493.78
0 02.00.00 OBRAS PRELIMINARES
0 02.01.01 LIMPIEZA DE TERRENO NORMAL MANUAL M2 41.58 1.73 71.93
0 02.01.02 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO DE OBRA M2 41.58 1.47 61.12
0 02.01.03 TRAZOS Y REPLANTEOS FINALES DEL PROYECTO M2 41.58 3.70 153.85
0 03.00.00 MOVIMIENTO DE TIERRAS
0 03.01.01 EXCAVACIONES A MANO EN T.N. P/CIMIENTOS M3 12.80 17.29 221.31
0 03.01.02 RELLENO COMPACTADO C/MATERIAL PROPIO M3 0.94 17.45 16.40
0 03.01.03 REFINE, NIVELACION T.N. EN OBRAS CIVILES M2 38.38 1.87 71.77
0 03.01.04 ELIMIN.DESMONTE,CARG. Y VOLQ.10M3 TERRENO NORMAL (R=2KM) M3 14.24 8.13 115.77
0 04.00.00 OBRAS DE CONCRETO SIMPLE
0 04.01.01 CONCRETO 1:10+30%P.G. P/CIMIENTOS CORRIDOS M3 10.88 135.65 1,475.87
0 04.02.01 CONCRETO 1:8+25%P.M. P/SOBRECIMIENTOS M3 0.86 163.03 140.21
0 04.02.02 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS M2 8.46 20.60 174.28
0 04.03.01 CONCRETO F'C 140KG/CM2 P/CANALETA (CABLES ELECTRICOS) M3 0.19 243.50 46.27
0 04.03.02 ENCOFRADO Y DESENCOFRADO P/CANALETA (CABLES ELECTRICOS) M2 2.00 26.29 52.58
0 05.00.00 OBRAS DE CONCRETO ARMADO
0 05.01.01 CONCRETO F'C 210KG/CM2 P/COLUMNAS M3 0.78 318.12 248.13
0 05.01.02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS M2 8.88 33.65 298.81
0 05.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200KG/CM2 KG 119.75 2.33 279.02
0 05.02.01 CONCRETO F'C 210KG/CM2 P/VIGA PERIMETRAL M3 0.99 269.92 267.22
0 05.02.02 ENCOFRADO Y DESENCOFRADO P/VIGA PERIMETRAL M2 8.40 30.56 256.70
0 05.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200KG/CM2 KG 99.99 2.33 232.98
0 05.03.01 CAJA P/REBOSE-LIMPIA T.N. CASETA BOMBEO POZO INC. REJILLA Y TAPA UND 1.00 1,616.62 1,616.62
0 06.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
0 06.01.01 MUROS DE LADRILLO K.K. ARC.DE CABEZA MEZC.:1:4 1.5 CM M2 14.04 56.34 791.01
0 06.01.02 MUROS DE LADRILLO K.K. ARC.DE SOGA MEZC.:1:4 1.5 CM M2 13.65 32.77 447.31
0 07.00.00 REVOQUES Y ENLUCIDOS
0 07.01.01 TARRAJEO INTERIOR C/MORTERO 1:5X1.5 CM (INCL.COLUMNAS EMPOT.) M2 33.85 10.12 342.56
0 07.01.02 TARRAJEO EXTERIOR C/MORTERO 1:5X1.5 CM (INC.COLUMNAS EMPOT.) M2 38.75 11.59 449.11
0 07.01.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS ML 13.60 3.34 45.42
0 08.00.00 PISOS Y VEREDAS
0 08.01.01 FALSOPISO DE 4" CONCRETO F'C=100 KG/CM2 M2 11.58 23.07 267.15
0 08.01.02 PISO DE CONCRETO PULIDO COLOREADO BRUÑADO M2 11.58 19.77 228.94
0 08.02.01 BASE AFIRMADA PARA VEREDAS E=0.075M M2 21.80 7.89 172.00
0 08.02.02 VEREDA RIGIDA-CONCRETO F'C 140 KG/CM2 DE E=10 CM, PASTA 1:5 M2 21.80 33.97 740.55
0 09.00.00 CONTRAZOCALOS
0 09.01.01 CONTRAZOCALO DE CEMENTO PULIDO C/MORT. 1:5 DE 2CM. X 0.20 M. ML 31.60 3.23 102.07
0 10.00.00 CARPINTERIA METALICA
0 10.01.01 PUERTA METALICA LAC 1/16" C/MARCO 1.1/4"X1/8" Y REFUERZOS M2 2.64 128.87 340.22
0 10.02.01 VENTANA DE FIERRO C/PERFIL DE 1FIJA+REF. DE 1" M2 1.92 98.02 188.20
0 10.03.01 MALLA METALICA PROTECTORA C/ALAMBRE N°12 X COCADAS DE 1" M2 1.92 39.34 75.53
0 10.04.01 PISO P/CANALETA CON PLANCHA LAC 350X1100X3MM C/PERFILES M2 4.00 98.01 392.04
0 11.00.00 CERRAJERIA
0 11.01.01 CHAPA PARA EXT.C/LLAVES INT. Y EXT. 3 GOLPES UND 1.00 68.00 68.00
0 11.02.01 BISAGRA DE FIERRO PARA PUERTA (PROMEDIO) UND 6.00 4.88 29.28
0 12.00.00 PINTURA
0 12.01.01 PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIM) M2 30.85 5.16 159.19
0 12.01.02 PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O SIM) M2 35.43 5.08 179.98
0 12.01.03 PINTADO DE PUERTAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) M2 2.64 8.44 22.28
0 12.01.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) M2 1.92 5.12 9.83
0 12.01.05 PINTADO DE MALLAS METALICAS (2 MANOS ANTIC.+2 ESMALTE) M2 1.92 5.27 10.12
0 13.00.00 COBERTURAS
0 13.01.01 COBERTURA DE PLANCHA A.C. CANALON 7.40X0.90M M2 29.14 43.85 1,277.79
0 14.00.00 INSTALACIONES SANITARIAS
0 14.01.01 TUBERIA P.V.C. DESAGUE S.P. LIVIANA 50 MM +2%DESP. SUMINISTRO ML. 3.00 1.53 4.59
0 14.01.02 INSTALACION TUBERIA PVC DESAGUE S.P. SAL/SAP 50 MM ML 3.00 1.02 3.06
0 14.02.01 CODO PVC SP DE 50 MM PARA DESAGUE UND 1.00 3.11 3.11
0 14.02.02 INSTALACION DE ACCESORIOS PVC S.P. 50 MM UND 1.00 3.77 3.77
0 14.03.01 SUMINISTRO Y COLOCADO DE SUMIDERO DE BRONCE 2" (50 MM) UND 1.00 44.60 44.60
0 15.00.00 INSTALACION ELECTRICA
0 15.01.01 TABLERO ELECTRICO TIPO MURAL INC.INTER.ACCES.S/DISEÑO/INST. UND 1.00 331.10 331.10
0 15.02.01 SALIDA PARA ALUMBRADO DE PARED, INTERRUPTOR DOBLE (5/8") PTO 3.00 41.76 125.28
0 15.02.02 SALIDA TOMACORRIENTE SIMPLE (5/8") PTO 2.00 28.47 56.94
0 15.03.01 CAJA DE FO.GDO. 300X300X150 MM. INCL. TAPA UND 1.00 40.69 40.69
0 15.03.02 CAJA DE FO.GDO. 200X200X150 MM. INCL. TAPA UND 1.00 29.69 29.69
0 15.03.03 CAJA DE FO.GDO. 150X150X150 MM. INCL. TAPA UND 1.00 18.69 18.69
0 15.04.01 TUBERIA PVC SAP DE 75MM(3") ML 20.00 15.82 316.40
0 15.04.02 TUBERIA PVC SAP DE 50MM(2") ML 9.00 7.74 69.66
0 15.04.03 TUBERIA PVC SAP DE 25MM(1") ML 2.00 2.71 5.42
0 15.04.04 TUBERIA PVC SAP DE 19MM(3/4") ML 6.00 2.14 12.84
0 15.04.05 INSTALAC.DE TUBERIA DE PVC SAP ML 37.00 1.04 38.48
0 15.05.01 CABLE ELECTRICO THW 2.5 MM2 ML 70.00 0.60 42.00
0 15.05.02 CABLE ELECTRICO THW 4.0 MM2 ML 6.00 0.93 5.58
0 15.05.03 CABLE ELECTRICO THW 6.0 MM2 ML 12.00 1.18 14.16
0 15.05.04 CABLE ELECTRICO THW 25 MM2 ML 28.00 4.16 116.48
0 15.06.01 CABLE DESNUDO DE COBRE DE 25 MM2 ML 7.00 3.04 21.28
0 15.07.01 CABLE ELECTRICO NYY 1X35 MM2 ML 75.00 6.76 507.00
0 15.08.01 TENDIDO DE CABLES ELECTRICOS ML 198.00 0.29 57.42
0 15.09.01 FLUORESCENTE RECTO ISPE 2X40 W INCLUYENDO EQUIPO Y PANTALLA UND 2.00 113.14 226.28
0 15.09.02 BRAQUETE MODELO 150R JOSFEL + LAMPARA DE 50 W UND 1.00 68.30 68.30
0 15.10.01 POZO-CONEX.A TIERRA EN SISTEMA C/EQ.BOMBEO, ALUMB.Y TOMACTE. UND 2.00 370.26 740.52
0 15.11.01 CABEZAL PORTA ELECTRODOS INC.ELECTRODOS (PROMEDIO) UND 1.00 401.59 401.59
0 16.00.00 MEDIDOR
0 16.01.01 SISTEMA DE MEDICION EN BAJA TENSION A CARGO DE CONCESIONARIA, SEGUN PROPUESTA. UND 1.00 9,103.55 9,103.55
0 17.00.00 EQUIPAMIENTO
0 17.01.01 SUMINISTRO BOMBA TIPO TURBINA VERT.Q=14LT/S,ADT=64 M UND 1.00 22,396.50 22,396.50
0 17.01.02 INSTALAC. BOMBA TIPO TURBINA UND 1.00 711.61 711.61
0 17.02.01 SUMIN.TABL.ELECT.P/MOTOR 25HP,220V TOTALM.EQUIPADO S/ESPECIF UND 1.00 1,620.00 1,620.00
0 17.02.02 INSTALACION DE TABLERO ELECTRICO P/MOTOR 25HP 220V UND 1.00 153.57 153.57
0 18.00.00 ARBOL DE DESCARGA
0 18.01.01 TUBERIA ACERO SCH-40 6" (150MM) INC. 1% DESP. SUMIN. ML. 10.00 208.36 2,083.60
0 18.01.02 TUBERIA ACERO SCH-40 3" (75 MM) INC. 1% DESP. SUMIN. ML. 5.00 80.01 400.05
0 18.01.03 TUBERIA P.V.C. AGUA POTABLE A-10 UF 150 MM SUMINISTRO ML 12.20 28.28 345.02
0 18.01.04 TUBERIA F.GDO. PESADA C-40 1" INC.UNION+3% DESP. SUMIN. ML. 3.90 19.81 77.26
0 18.01.05 TUBERIA PVC ROSCADA DE 75 MM ML 31.00 17.12 530.72
0 18.01.06 INSTALACION TUBERIA ACERO SCH 40 BRIDADA 6"(150MM) ML 10.00 27.14 271.40
0 18.01.07 INSTALACION TUBERIA ACERO SCH 40 BRIDADA 3"(75MM) ML 5.00 13.55 67.75
0 18.01.08 INSTALACION TUBERIA PVC P/AGUA POT. 150 MM U.F. INC. PRUEBA ML 12.20 1.09 13.30
0 18.01.09 INSTALACION DE TUBERIA FO.GDO.PESADA C-40/STAND.ISO-I 1" ML 3.90 2.32 9.05
0 18.01.10 INSTAL.TUB.PVC P/AGUA POT. ROSCADO 75 MM ML 31.00 3.73 115.63
0 18.02.01 CODO FO.FDO. BRIDADO 150 MM X45° UND 2.00 385.02 770.04
0 18.02.02 CODO FO.FDO. BRIDADO 150 MM X 90° UND 1.00 396.02 396.02
0 18.02.03 CODO FO.FDO. BRIDADO 75 MM X90° UND 1.00 150.75 150.75
0 18.02.04 CODO FO. GDO. ROSCADO 25 MM X 90° UND 2.00 4.50 9.00
0 18.02.05 CODO FO. GDO. ROSCADO 12.5 MM X 90° UND 1.00 1.00 1.00
0 18.02.06 INSTALACION DE CODOS FO. FDO. BRIDADO 150 MM UND 3.00 35.45 106.35
0 18.02.07 INSTALACION DE CODOS FO. FDO. BRIDADO 100 MM X 90° UND 1.00 30.52 30.52
0 18.02.08 INSTALACION DE CODOS FO. FDO. BRIDADO 75 MM X 90° UND 1.00 24.72 24.72
0 18.02.09 INSTALACION DE CODO FO.GVDO. 25 MM X 90° UND 2.00 5.11 10.22
0 18.02.10 INSTALACION DE CODO FO.GVDO. 12.5 MM X 90° UND 1.00 3.84 3.84
0 18.03.01 TEE DE FO.FDO. BRIDADA DE 150 MM X 75 MM UND 1.00 415.95 415.95
0 18.03.02 TEE FO. GDO. 12.5 MM X 12.5 MM UND 1.00 2.16 2.16
0 18.03.03 INSTALACION DE TEE FO.FDO. BRIDADA DE 150 MM UND 1.00 44.50 44.50
0 18.03.04 INSTALACION DE TEES FO.GVDO. 12.5 MM UND 1.00 3.84 3.84
0 18.04.01 UNION DRESSER DE ACERO 150 MM UND 1.00 260.82 260.82
0 18.04.02 INSTALACION UNION DRESSER ACERO 150 MM UND 1.00 6.39 6.39
0 18.05.01 TRANSICION FO. FDO. CAMPANA-BRIDA DE 150 MM UND 1.00 274.00 274.00
0 18.05.02 INSTALACION DE TRANSICIONES FO.FDO. CAMPANA-BRIDA 150 MM UND 1.00 12.81 12.81
0 18.06.01 BRIDA ACERO PARA SOLDAR Y EMPERNAR DE 150 MM UND 14.00 100.15 1,402.10
0 18.06.02 BRIDA ACERO PARA SOLDAR Y EMPERNAR DE (75 MM) UND 5.00 78.69 393.45
0 18.06.03 INSTALACION BRIDAS AC.P/SOLDAR Y EMPERNAR 150 MM UND 14.00 45.55 637.70
0 18.06.04 INSTALACION BRIDAS AC.P/SOLDAR Y EMPERNAR 75 MM UND 5.00 25.38 126.90
0 18.07.01 VALVULA COMPUERTA DE F.FDO. BRIDADA 150 MM UND 1.00 507.50 507.50
0 18.07.02 VALVULA COMPUERTA DE F.FDO. BRIDADA 75 MM UND 1.00 362.73 362.73
0 18.07.03 VALVULA COMPUERTA DE F.FDO. BRIDADA 25 MM UND 1.00 247.97 247.97
0 18.07.04 INSTAL.VALVULAS COMPUERTA F.FDO.BRIDADA 150 MM UND 1.00 71.15 71.15
0 18.07.05 INSTAL.VALVULAS COMPUERTA F.FDO.BRIDADA 75 MM UND 1.00 31.50 31.50
0 18.07.06 INSTAL.VALVULAS COMPUERTA F.FDO.BRIDADA 25 MM UND 1.00 27.02 27.02
0 18.08.01 VALVULA CHECK F.FDO. BRIDADA 150 MM PZA 1.00 1,234.08 1,234.08
0 18.08.02 INSTAL.VALVULAS CHECK F.FDO. BRIDADA 150 MM PZA 1.00 67.53 67.53
0 18.09.01 VALVULA AIRE DE F.FDO. BRIDADA 25 MM UND 1.00 612.00 612.00
0 18.09.02 INSTAL.VALVULAS AIRE DE F.FDO.BRIDADA 25 MM PZA 1.00 25.74 25.74
0 18.10.01 VALVULA GLOBO BRONCE 12.5 MM 250 LB UND 2.00 20.01 40.02
0 19.10.02 INSTALACION DE VALVULAS GLOBO BRONCE 12.5 MM UND 2.00 7.69 15.38
0 19.11.01 REDUCCION PVC U.F. 150 MM X 100 MM UND 1.00 67.12 67.12
0 19.11.02 INSTALACION DE ACCESORIOS PVC U.F. 150 MM UND 1.00 17.37 17.37
0 19.12.01 MEDIDOR DE CAUDAL BB 150 MM TIPO AXIAL EN CARRETE UND 1.00 2,500.00 2,500.00
0 19.12.02 INSTALACION MEDIDOR DE CAUDAL TIPO TUBULAR 6" PZA 1.00 115.55 115.55
0 19.13.01 MANOMETRO TIPO BOURDON RANGO 0-300PSI UND 1.00 126.00 126.00
0 19.13.02 INSTALACION DE MANOMETROS 0-300PSI UND 1.00 73.17 73.17
0 19.14.01 DADO DE CONCRETO F'C=140 KG/CM2 P/ACC.TUBERIA 150 MM UND 2.00 28.73 57.46
0 19.15.01 DESMONTAJE ELECTROMECANICO E HIDRAULICO DE BOMBA GLB 1.00 86.46 86.46
0 19.15.02 DESMONTAJE DE ACCESORIOS 150MM FO.FDO. PZA 5.00 25.59 127.95
0 20.00.00 VARIOS
0 20.01.01 PRUEBA DE BOMBEO DEL POZO INC. TRANSPORTE, PRUEBA DE BOMBEO, EVACUACION DE AGUA POR PRU EST 1.00 3,600.00 3,600.00
COSTO DIRECTO 74,211.42