Sei sulla pagina 1di 2

QUALITY CONTROL LOADING SCHEDULE ITEMS

INSPECTION
ITEM ITEM
(STD) (SPECIAL) LOCATION QTY TYPE LENGTH
BED NO. DATE FORMWORK STEEL COMPONENT CONCRETE FINISH TIME POURED CONCRETE DOCKET Nº LIFTING TIME

- ED 14 ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG 720


21 - ED 4 PSA 10t EDGE LIFTER (#LME10)
26 - ED 1 PSA M20x96 PROP BRACING FERRULE (#P2096Z) 96
26 - FF 1 PSA M20x96 PROP BRACING FERRULE (#P2096Z) 96
PANEL TYPE AREA INSPECT VOLUME WEIGHT DENSITY WEIGHT (T) MESH INSPECT PERIMETER BARS INSPECT CONCRETE GRADE INSPECT MINIMUM CONCRETE F'c AT LIFTING INSPECT REINFORCEMENT COVER INSPECT 26 - NF 1 PSA M20x96 PROP BRACING FERRULE (#P2096Z) 96
CONCRETE - 300 thk 7.33 m² 2.20 m³ 2400 kg/m³ 5.3 AS SHOWN AS SHOWN 40 MPa 20 MPa 30 mm 24 ED 12 Ø50 x 850LG BLANK END 850
OVERALL 24 - FF 1 Ø50 x 850LG GROUT TUBE 850
VERTICAL AXIS 6215 24 - NF 1 Ø50 x 850LG GROUT TUBE 850
OUTLINE
245 180 2920 180 2690
LAP JOINT
LAP JOINT DETAIL 35 6145 35
12 VAR. 43 12 PSA M20x96 PROP BRACING FERRULE -ED
5 TOP RL 3786 2429
12

35

TABLE FACE

80 140 80

80 140 80
12

Elevation Right
VAR. 55

300
5
TABLE FACE

ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG

OVERALL
GT Ø50 x 850LG

ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG


OVERALL
VAR. 55 6215
50 OUTLINE
BOP RL
12
35

245 180 2920 180 2690


12

VAR. 38 12 LAP JOINT

PSA M20x96 PROP BRACING FERRULE -NF

PSA M20x96 PROP BRACING FERRULE -FF


35 6145 35
3D FF 3D NF
N24@100 U BAR
285 100 3000 100 2730
PSA M20x96 PROP BRACING FERRULE -ED
3786 2429
N24@100 U BAR

PSA M20x96 PROP BRACING FERRULE -FF


3218 2997
PSA M20x96 PROP BRACING FERRULE -NF
2915 3300
PSA 10t EDGE LIFTER
1518 3232 1465

GT Ø50 x 850LG

BOP RL 87120
PANEL LABEL
COG

RL 87155
RL 93335

LAP JOINT
LAP JOINT

3134 3081

OVERALL
OVERALL

LAP JOINT

OVERALL
700

COG
5 159

5 164

5 164
ED
5 159

ED
85

85
226

EDED NF
FF
85 244 253 268

85 244 253 268

Elevation Bottom
TOP RL 93300

471

ED

ED
Elevation Top

559
EDED
EDED

EDED

605
LEGEND
TABLE FACE

123 113 113

123 113 113

700
700
NF - NEAR FACE

TABLE FACE
FF - FAR FACE
1170

1200

1200
ED

1200
ED - EDGE
1115

1115
1036

367
1036

1031
EDED
EDED

1031
EDED
EDED
EF - EACH FACE
975

NF

FF

641
595
ED

500
500
PRECAST
362

EDED
EDED

EDED
EDED
30

SYDNEY, AU - 1 Norrie St, Yennora, NSW 2161


TOP RL 93300
PSA 10t EDGE LIFTER
OUTLINE

BRISBANE, AU - 156 Magnesium Dr Crestmead QLD 4132

BOP RL 87120
LAP JOINT

BE Ø50 x 850LG

N24@100 U BAR GT Ø50 x 850LG


ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG

Elevation Front
35 230 35 80 140 80 PERTH, AU - 312 Selby St, Osborne Park, WA 6017
MONTEVIDEO, UY - 902/2859 Vazques Ledesma, Montevideo, 11300 
BE Ø50 x 850LG DOLORES, UY - 1586 Asencio, Soriano, 75100
80 140 80

ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG


200 200 80 140 80
OVERALL

SSL 86900
SSL 93100

SSL 90000
ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG

80 140 80 300
OVERALL
300

OVERALL
1 ISSUED FOR PRODUCTION 30.09.20

Elevation Left
A ISSUED FOR APPROVAL 09.09.20
ISSUE AMENDMENTS DATE

PRECAST GEOMETRY LAYOUT

80 140 80
80 140 80

TOWER: LEVEL:

EAST L15

300
JOB NUMBER: PANEL: REV Nº:

TABLE FACE SY-336 EL15C108 1


FINISH (N/S) CHAMFER THK:
BE Ø50 x 850LG

ACTECH TB20 COUPLER + REIDBAR RBA20 x 720 mm LG SMOOTH 12x12 300


PROJECT NAME:
LAP JOINT Natura Apartments
35 6145 35 PROJECT ADRESS:

OVERALL 82 Waterloo Rd, Macquarie Park


6215 Checked by XLP Drawn by Author
SHEET:

© - COPYRIGHT OF DESIGNS SHOWN HEREIN IS RETAINED BY XL PRECAST, WRITTEN AUTHORITY IS REQUIRED FOR ANY REPRODUCTION - XLP-PRE-L15-EL15C108
BAR SHAPES

QUALITY CONTROL LOADING SCHEDULE SHAPE SHAPE IMAGE

INSPECTION
BED NO. DATE FORMWORK STEEL COMPONENT CONCRETE FINISH TIME POURED CONCRETE DOCKET Nº LIFTING TIME S L1

L3
L1
LH
L2

L1
REBAR SCHEDULE L
ITEM NUMBER MATERIAL BRAND SHAPE POSITION L1 L2 L3 L4 L5 LENGTH PIN DIA. UNIT MASS Kg/Ea Kg/All QTY L2
1 N20 - S 6080 6080 2.47 kg/m 15.02 kg 210.25 kg 14
L1
2 N10 - HT 240 1140 2760 60 0.62 kg/m 1.70 kg 5.11 kg 3
U L2
2 N10 - HT - 240 1140 2760 60 0.62 kg/m 1.70 kg 32.36 kg 19
3 N10 - HT 240 230 940 60 0.62 kg/m 0.58 kg 3.48 kg 6 L3
3 N10 - HT - 240 230 940 60 0.62 kg/m 0.58 kg 22.04 kg 38
L1
4 N10 - HH 70 240 380 60 0.62 kg/m 0.24 kg 5.18 kg 22
5 N24 U - 1870 230 2330 60 3.85 kg/m 8.97 kg 35.88 kg 4 HH
L2
314.30 kg

L2
H
L1

L3
1 N20-EF
1 N20-EF HT L1
3 N10 CLOSED TIE
L2
3 N10 @300 CLOSED TIE
L1
5 N24@100 U BAR
RC L2

1 N20-EF L3
3 N10 CLOSED TIE 1140
2 N10 @300 CLOSED TIE
2 N10 @300 CLOSED TIE L1

240
4 N10 @300 CLOSED TIE
4 N10@300 TIES
3 N10 @300 CLOSED TIE F L2
230 2 N10 @300 CLOSED TIE [22]
3 N10 @300 CLOSED TIE [44]
R1 R1
SECTION R1-R1
4 N10 @300 CLOSED TIE

2 N10 CLOSED TIE


6261
6330

5 N24@100 U BAR
R2 R2
2 N10 CLOSED TIE
5 N24@100 U BAR
3 N10 CLOSED TIE 3 N10 CLOSED TIE 1 N20-EF PRECAST
2 N10 CLOSED TIE
1140 SYDNEY, AU - 1 Norrie St, Yennora, NSW 2161
BRISBANE, AU - 156 Magnesium Dr Crestmead QLD 4132
PERTH, AU - 312 Selby St, Osborne Park, WA 6017

230
MONTEVIDEO, UY - 902/2859 Vazques Ledesma, Montevideo, 11300
DOLORES, UY - 1586 Asencio, Soriano, 75100

1870
4 N10@300 TIES 5 N24@100 U BAR

3 N10 CLOSED TIE


SECTION R2-R2

1 ISSUED FOR PRODUCTION 30.09.20


A ISSUED FOR APPROVAL 09.09.20
ISSUE AMENDMENTS DATE

PRECAST REINFORCEMENT LAYOUT


TOWER: LEVEL:

EAST L15
JOB NUMBER: PANEL: REV Nº:

SY-336 EL15C108-R 1
REINFORCEMENT LAYOUT LEFT REINFORCEMENT LAYOUT FINISH (N/S) CHAMFER THK:

SMOOTH 12x12 300


PROJECT NAME:

Natura Apartments
PROJECT ADRESS:

82 Waterloo Rd, Macquarie Park


Checked by XLP Drawn by Author
SHEET:

© - COPYRIGHT OF DESIGNS SHOWN HEREIN IS RETAINED BY XL PRECAST, WRITTEN AUTHORITY IS REQUIRED FOR ANY REPRODUCTION - XLP-PRE-L15-EL15C108