Sei sulla pagina 1di 27

DAFTAR HARGA BAHAN

HARGA SATUAN KODE


NO NAMA BAHAN
(Rp.) HARGA

1 Solar 25,000 Liter A1


2 Bensin 26,500 Liter A2
3 Minyak Pelumas / Oli 60,000.00 Liter A3
4 Aspal Ac. 60/70 23,985.00 Kg A4
5 Cat Marka 97,750.00 Kg A5
6 Thinner 69,850.00 Liter A6
7 Pasir (Import) 1,881,000.00 M3 A7
8 Kerikil / Batu Pecah (Import) 1,881,000.00 M 3
A8
9 Pasir Sirtu (Diameter > 0,075) 1,519,000.00 M 3
A9
10 Semen PC 264,990.00 M 3
A 10
11 Tanah Urugan 1,000,000.00 M 3
A 11
12 Besi Beton SNI 30,250.00 Kg A 12
13 Kawat Ikat Beton 125,840.00 Kg A 13
14 Paku Campuran 39,930.00 Kg A 14
15 Atap Seng Gelombang BJLS - 0.20 107,690.00 Lbr A 15
16 Triplek 3 mm 151,250.00 Lbr A 16
17 Tiang pancang kayu dia. 15 cm 220,000.00 Btg A 17
18 Gelagar kayu 5/10 cm 3,190,000.00 M3 A 18
19 Papan Kayu 3/20 cm 3,190,000.00 M3 A 19
20 Kayu Klas II Papan 3,304,400.00 M3 A 20
21 Kayu Klas II Balok 3,304,400.00 M3 A 21
22 Kayu Klas III Papan 2,750,000.00 M3 A 22
23 Kayu Klas III Balok 2,750,000.00 M3 A 23
24 Batu Bata 5,280.00 Bh A 24
25 Jendela Nako 605,000.00 Set A 25
26 Kaca Polos tbl 3 mm 545,710.00 M2 A 26
27 Kunci Tanam 223,850.00 Bh A 27
28 Geotextile Non Woven 23,750.00 M2 A 28
29 Minyak Bekisting 899.09 Liter A 29
30 Plywood Tebal 9 mm 117,370.00 Lbr A 30
31 Kayu Dolken 18,085 Batang A 31
32 Kerosene 17,000 Liter A 32
DAFTAR HARGA SATUAN ALAT

HARGA SATUAN KODE


NO JENIS PERALATAN
(Rp.) HARGA

1 Excavator 1,060,423.57 Jam B1


2 Motor Grader 1,254,214.98 Jam B2
3 Vibro Roller 681,982.49 Jam B3
4 Dump Truck 587,631.78 Jam B4
5 Water Tanker 659,150.22 Jam B5
8 Tandem Roller 515,960.26 Jam B8
9 Ponton 1,540,800.00 Jam B9
10 Tug Boat 664,970.00 Jam B 10
11 Vibro Hammer 1,210,000.00 Jam B 11
12 Tire Roller 626,325.32 Jam B 12
13 Asphalt Mixing Plant 12,060,711.48 Jam B 13
14 Asphalt Finisher 315,438.50 Jam B 14
15 Asphalt Sprayer 138,429.87 Jam B 15
16 Wheel Loader 906,322.31 Jam B 16
17 Generator Set 695,888.75 Jam B 17
18 Compressor 376,008.65 Jam B 18
19 Sprayer Cat 40,000.00 Jam B 19
20 Alat Ukur Theodlite (T-0) 125,000.00 Jam B 20
22 Alat Ukur Water Pass (WP) 100,000.00 Jam B 22
23 Mistar Ukur / Bak Ukur 10,000.00 Jam B 23
DAFTAR HARGA SATUAN UPAH

HARGA SATUAN KODE


NO URAIAN
(Rp.) HARGA

1 Pekerja 120,000.00 Hari 17,142.86 Jam E1


2 Tukang 200,000.00 Hari 28,571.43 Jam E2
3 Kepala Tukang 160,000.00 Hari 22,857.14 Jam E3
4 Mandor 180,000.00 Hari 25,714.29 Jam E4
5 Operator 154,000.00 Hari 22,000.00 Jam E5
6 Pembantu Operator 115,500.00 Hari 16,500.00 Jam E6
7 Sopir 132,000.00 Hari 18,857.14 Jam E7
8 Pembantu Sopir 115,500.00 Hari 16,500.00 Jam E8
9 Surveyor 132,000.00 Hari 18,857.14 Jam E9
10 Juru Gambar 132,000.00 Hari 18,857.14 Jam E 10
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 140.00 HP
3. Kapasitas Cp 0.90 M3
4. Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 1,661,000,000.00 Rupiah
5. Alat Yang Dipakai : a. Umur Sisa Ekonomis A' 5.00 Y Alat Baru
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 1,661,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 166,100,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 262,900.57 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 2,214.67 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 265,115.24 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 437,500.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 84,000.00 Rupiah

3. Workshop (0,0625 % - 0,0875 %) x B K 96,891.67 Rupiah


W'
3. Perawatan dan (12,5 % - 17,5 %) x B K 138,416.67 Rupiah
perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 795,308.33 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,060,423.57 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON
2. Tenaga Pw 115.00 HP
3. Kapasitas Cp 10.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 430,100,000.00 Rupiah
5. Alat Yang Dipakai : a. Umur Sisa Ekonomis A' 6.00 Y Alat Baru
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 430,100,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 43,010,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.22961 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 59,252.48 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 573.47 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 59,825.95 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 359,375.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 69,000.00 Rupiah

3. Workshop (0,0625 % - 0,0875 %) x B K 25,089.17 Rupiah


W'
3. Perawatan dan (12,5 % - 17,5 %) x B K 35,841.67 Rupiah
perbaikan = W'

4. Sopir = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Sopir = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 527,805.83 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 587,631.78 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,310,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 231,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 274,217.48 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,310.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 276,527.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 468,750.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 225,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 101,063 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 144,375.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 977,687.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,254,214.98 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER
2. Tenaga Pw 85.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,155,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 115,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 137,108.74 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,155.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 138,263.74 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 255,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 127,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 50,531 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 72,187.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 543,718.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 681,982.49 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L.
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 456,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 45,650,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 54,190.60 Rupiah
W

b. Asuransi, dll = 0.002 x B F 456.50 Rupiah


W

Biaya Pasti per Jam = (E+F) G 54,647.10 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 345,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 172,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 19,972 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 28,531.25 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 604,503.13 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 659,150.22 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 480,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 48,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 56,980.26 Rupiah
W

b. Asuransi, dll = 0.002 x B F 480.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 57,460.26 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 246,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 123,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 21,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 30,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 458,500.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 515,960.26 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 60,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 71,225.32 Rupiah
W

b. Asuransi, dll = 0.002 x B F 600.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 71,825.32 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 301,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 150,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 26,250 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 37,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 554,500.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 626,325.32 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT
2. Tenaga Pw 220.00 HP
3. Kapasitas Cp 50.00 T/Jam
4. Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 2,343,000,000.00 Rupiah Harga Baru
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 10.00 Tahun
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 2,343,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 234,300,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.16 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 228,787.48 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 3,124.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 231,911.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 825,000.00 Rupiah


Bahan Bakar Pemanasan Material = 12 x 0.7Cp x Ms H2 10,500,000.00 Rupiah Khusus AMP

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 198,000.00 Rupiah

3. Perawatan dan = (12,5 % - 17,5 %) x B K 234,300.00 Rupiah


perbaikan W'
4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 49,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 11,828,800.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 12,060,711.48 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER
2. Tenaga Pw 50.00 HP
3. Kapasitas Cp 5.00 Ton
4. Alat Baru a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 247,812,175.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 6.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 247,812,175.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 24,781,217.50 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 25,604.78 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 247.81 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 25,852.59 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 187,500.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 45,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 18,585.91 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 289,585.91 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 315,438.50 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER
2. Tenaga Pw 15.00 HP
3. Kapasitas Cp 800.00 Liter
4. Alat Baru a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 155,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 5.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 155,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 15,500,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 18,399.87 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 155.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 18,554.87 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 56,250.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 13,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 11,625.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 119,875.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 138,429.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2. Tenaga Pw 125.00 HP
3. Kapasitas Cp 1.50 M3
4. Alat Baru a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 825,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 5.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 825,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 82,500,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 97,934.81 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 825.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 98,759.81 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 546,875.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 150,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 72,187.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 807,562.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 906,322.31 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E.12
2. Tenaga Pw 175.00 HP
3. Kapasitas Cp 125.00 KVA
4. Alat Baru a. Umur Ekonomis A 2.50 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 13,750,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 2.50 Tahun Alat Baru
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 13,750,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,375,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47167 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 3,891.25 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 18.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 3,909.58 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 546,875.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 105,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,604.17 Rupiah


perbaikan = W'

4. Operator / = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 691,979.17 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 695,888.75 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Pekerja Terlatih U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pekerja Biasa U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E.05
2. Tenaga Pw 80.00 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 8.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250.00 Jam
c. Harga Alat B 120,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 8.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 1,250.00 Jam
c. Harga Alat (*) B' 120,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 12,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26061 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 22,516.65 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 192.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 22,708.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 250,000.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 48,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 16,800.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 353,300.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 376,008.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Pekerja Terlatih U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pekerja Biasa U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,310,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 231,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 274,217.48 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,310.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 276,527.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 468,750.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 225,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 101,063 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 144,375.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 977,687.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,254,214.98 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 35 TON
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,074,605,717 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 107,460,572 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 127,565.23 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,074.61 Rupiah


W

Biaya Pasti per Jam = (E+F) G 128,639.83 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 375,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 187,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 47,014 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 67,162.86 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 715,176.86 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 843,816.69 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L.
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 456,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 45,650,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 54,190.60 Rupiah
W

b. Asuransi, dll = 0.002 x B F 456.50 Rupiah


W

Biaya Pasti per Jam = (E+F) G 54,647.10 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 345,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 172,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 19,972 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 28,531.25 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 604,503.13 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 659,150.22 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 480,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 48,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 56,980.26 Rupiah
W

b. Asuransi, dll = 0.002 x B F 480.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 57,460.26 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 246,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 123,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 21,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 30,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 458,500.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 515,960.26 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 60,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 71,225.32 Rupiah
W

b. Asuransi, dll = 0.002 x B F 600.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 71,825.32 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 301,500.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 150,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 26,250 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 37,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 554,500.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 626,325.32 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT
2. Tenaga Pw 220.00 HP
3. Kapasitas Cp 50.00 T/Jam
4. Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 2,343,000,000.00 Rupiah Harga Baru
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 10.00 Tahun
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 2,343,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 234,300,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.16 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 228,787.48 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 3,124.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 231,911.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 825,000.00 Rupiah


Bahan Bakar Pemanasan Material = 12 x 0.7Cp x Ms H2 10,500,000.00 Rupiah Khusus AMP

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 198,000.00 Rupiah

3. Perawatan dan = (12,5 % - 17,5 %) x B K 234,300.00 Rupiah


perbaikan W'
4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 49,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 11,828,800.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 12,060,711.48 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER
2. Tenaga Pw 50.00 HP
3. Kapasitas Cp 5.00 Ton
4. Alat Baru a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 247,812,175.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 6.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 247,812,175.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 24,781,217.50 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 25,604.78 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 247.81 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 25,852.59 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 187,500.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 45,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 18,585.91 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 289,585.91 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 315,438.50 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER
2. Tenaga Pw 15.00 HP
3. Kapasitas Cp 800.00 Liter
4. Alat Baru a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 155,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 5.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 155,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 15,500,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 18,399.87 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 155.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 18,554.87 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 56,250.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 13,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 11,625.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 119,875.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 138,429.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2. Tenaga Pw 125.00 HP
3. Kapasitas Cp 1.50 M3
4. Alat Baru a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 825,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 5.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 2,000.00 Jam
c. Harga Alat (*) B' 825,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 82,500,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26380 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 97,934.81 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 825.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 98,759.81 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 546,875.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 150,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 72,187.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 807,562.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 906,322.31 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E.12
2. Tenaga Pw 175.00 HP
3. Kapasitas Cp 125.00 KVA
4. Alat Baru a. Umur Ekonomis A 2.50 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 13,750,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 2.50 Tahun Alat Baru
b. Sisa Jam Kerja W' 1,500.00 Jam
c. Harga Alat (*) B' 13,750,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,375,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47167 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 3,891.25 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 18.33 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 3,909.58 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 546,875.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 105,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,604.17 Rupiah


perbaikan = W'

4. Operator / = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 691,979.17 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 695,888.75 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Pekerja Terlatih U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pekerja Biasa U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E.05
2. Tenaga Pw 80.00 HP
3. Kapasitas Cp - -
4. Alat Baru a. Umur Ekonomis A 8.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,250.00 Jam
c. Harga Alat B 120,000,000.00 Rupiah
5. Alat Yang Dipakai a. Umur Sisa Ekonomis A' 8.00 Tahun Alat Baru
b. Sisa Jam Kerja W' 1,250.00 Jam
c. Harga Alat (*) B' 120,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 12,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26061 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 22,516.65 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 192.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 22,708.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 250,000.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 48,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 16,800.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 16,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 353,300.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 376,008.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Pekerja Terlatih U1 22,000.00 Rp./Jam
3. Upah Pembantu Operator / Pekerja Biasa U2 16,500.00 Rp./Jam
4. Bahan Bakar Bensin Mb 26,500.00 Liter
5. Bahan Bakar Solar Ms 25,000.00 Liter
6. Minyak Pelumas Mp 60,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

Potrebbero piacerti anche