Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TABLE OF CONTENTS
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 4A,4B,9 &10
The purpose of this document is to perform design and finalization of steel members for Pipe Rack .
consisting of Modules 6, 7, ,8 , 14 in permanent condition , in the transportation &
lifting conditions for the individual modules .
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 4A,4B,9 &10
· Model Description
Axes
‘ X ’ axis of the RISA 3D model is considered along transverse direction of the Pipe Rack,
‘ Z ’ axis along longitudinal direction and ‘ Y ’ axis in Upward direction.
Members
Loads are applied as per the detail calculation furnished below in this document.
· Performing Analysis
All column steel members of Structure are designed directly by the RISA 3D software
against various load combinations conforming to ASCE 7-16.
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 4A,4B,9 &10
Grating
Live Load
Pipe Load of 40 psf is apllied for the pipes below 8" dia
(The load calculation for pipe load on individual Beams is calculated in the Pipe Load Calc)
60% of the 40 psf load is applied for the pipes below 8" dia
60% of the individual pipe load is applied for the pipes above 8" dia
(The load calculation for pipe load on individual Beams is calculated in the Pipe Load calc)
Thermal load for Pipe is applied as 40% of the Pipe Operating Load for the Pipes above 8" dia
Thermal load for Pipe is applied as 10% of the Pipe Operating Load for the Pipes below 8" dia
RDSI
Design of Pipe rack -Module 4A,4B,9 &10
VPA DCU-844 OSBL PROJECT
MODULE 10
LVL : 129'-6"
20 20 8 3
1 2 3
@ Level-129'6''
Pipe Load (Operating) Pipe Load (Empty)
Load on the Beam (@ 1 grid)= 0.80 Kips/ft Load on the Beam (@ 1 grid)= 0.48 Kips/ft
Load on the Beam (@2 grid) = 0.80 Kips/ft Load on the Beam (@2 grid) = 0.48 Kips/ft
Load on the beam (@3 grid) = 0.56 Kips/ft Load on the beam (@3 grid) = 0.34 Kips/ft
Load on the Int Beam 3 = 0.22 Kips/ft Load on the Int Beam 3 = 0.13 Kips/ft
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-1,2 & 3
@ Grid-1,2 & 3
LVL : 124'-6"
9 11 11.75 8.25 8 3
1 2 3
@ Level-124'6''
Load on the Beam (@ 1 grid)= 0.58 Kips/ft Load on the Beam (@ 1 grid)= 0.35 Kips/ft
Load on the Int Beam 1 = 0.40 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Beam (@2 grid) = 0.46 Kips/ft Load on the Beam (@2 grid) = 0.27 Kips/ft
Load on the Int Beam 2 = 0.40 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the beam (@3 grid) = 0.33 Kips/ft Load on the beam (@3 grid) = 0.20 Kips/ft
Load on the Int Beam 3 = 0.22 Kips/ft Load on the Int Beam 3 = 0.13 Kips/ft
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-1,2 & 3
@ Grid-1,2 & 3
RDSI
Design of Pipe rack -Module 4A,4B,9 &10
VPA DCU-844 OSBL PROJECT
LVL : 119'-6"
1 2 3
@ Level-119'6''
Load on the Beam (@ 1 grid)= 0.58 Kips/ft Load on the Beam (@ 1 grid)= 0.35 Kips/ft
Load on the Int Beam 1 = 0.40 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Beam (@2 grid) = 0.46 Kips/ft Load on the Beam (@2 grid) = 0.27 Kips/ft
Load on the Int Beam 2 = 0.40 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the beam (@3 grid) = 0.33 Kips/ft Load on the beam (@3 grid) = 0.20 Kips/ft
Load on the Int Beam 3 = 0.22 Kips/ft Load on the Int Beam 3 = 0.13 Kips/ft
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-1,2 & 3
@ Grid-1,2 & 3
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+15)/2*20/1000 = 0.35 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = 0.6*(20+15)/2*20/1000 = 0.21 Kips/ft
RDSI
Design of Pipe rack -Module 4A,4B,9 &10
VPA DCU-844 OSBL PROJECT
Level-132'00"
Level-127'00"
Level-122'00"
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE 9
LVL : 129'-6"
3 9 20 20 20
4 5 6
@ Level-129'6''
Load on lnt beam@‗ 3 = 0.24 Kips/ft Load on lnt beam@‗ 3 = 0.14 Kips/ft
Load on the Beam(@ 4 grid) = 0.58 Kips/ft Load on the Beam(@ 4 grid) = 0.35 Kips/ft
Load on the Beam(@5 grid) = 0.80 Kips/ft Load on the Beam(@5 grid) = 0.48 Kips/ft
Load on the Beam(@ grid6) = 0.80 Kips/ft Load on the Beam(@ grid6) = 0.48 Kips/ft
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-4,5 & 6
@ Grid-4,5 & 6
LVL : 124'-6"
3 9 8.25 11.75 10 10 20
4 5 6
@ Level-124'6''
Load on lnt beam@‗ 3 = 0.24 Kips/ft Load on lnt beam@‗ 3 = 0.14 Kips/ft
Load on the Beam(@ 4 grid) = 0.35 Kips/ft Load on the Beam(@ 4 grid) = 0.21 Kips/ft
Load on the Int Beam 4= 0.40 Kips/ft Load on the Int Beam 4= 0.24 Kips/ft
Load on the Beam(@5 grid) = 0.44 Kips/ft Load on the Beam(@5 grid) = 0.26 Kips/ft
Load on the Int Beam 5 = 0.40 Kips/ft Load on the Int Beam 5 = 0.24 Kips/ft
Load on the Beam(@ grid6) = 0.60 Kips/ft Load on the Beam(@ grid6) = 0.36 Kips/ft
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-4,5 & 6
@ Grid-4,5 & 6
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
LVL : 119'-6"
3 9 8.25 11.75 10 10 20
4 5 6
@ Level-119'6''
Load on lnt beam@‗ 3 = 0.24 Kips/ft Load on lnt beam@‗ 3 = 0.14 Kips/ft
Load on the Beam(@ 4 grid) = 0.35 Kips/ft Load on the Beam(@ 4 grid) = 0.21 Kips/ft
Load on the Int Beam 4= 0.40 Kips/ft Load on the Int Beam 4= 0.24 Kips/ft
Load on the Beam(@5 grid) = 0.44 Kips/ft Load on the Beam(@5 grid) = 0.26 Kips/ft
Load on the Int Beam 5 = 0.40 Kips/ft Load on the Int Beam 5 = 0.24 Kips/ft
Load on the Beam(@ grid6) = 0.60 Kips/ft Load on the Beam(@ grid6) = 0.36 Kips/ft
Load on the Beam = 1.54 Kips Load on the Beam = 0.92 Kips
grid 4,5 & 6 grid 4,5 & 6
Weight of 10" Pipe = 40.5 + (34.2-21.7) = 53 lbs/ft Load on the Beam = 0.64 Kips
Load on the Beam = 1.06 Kips @ Grid-4,5 & 6
@ Grid-4,5 & 6
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+15)/2*20/1000 = 0.35 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = *0.6*(20+15)/2*20/1000 = 0.21 Kips/ft
Level-127'00"
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE -4A_SUPPORT
Operating Loads:
Dia. (Ft.) Water STD Total
(lbs/ft.) weight weight
(lbs/ft.) (kips/ft.)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE -4B_SUPPORT
Operating Loads:
Dia. (Ft.) Water STD Total
(lbs/ft.) weight weight
(lbs/ft.) (kips/ft.)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Equipment
Pipe Weight:
30% of Weight = 4.0 Kips 8.6
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
PIPE SUPPORT
Load on the end Beam 1 = 0.8 Kips/ft Load on the end Beam = 0.48 Kips/ft
Load on the End Beam 2 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the end Beam = 0.4 Kips/ft Load on the end Beam = 0.24 Kips/ft
Load on the Int Beam 1 = 0.465 Kips/ft Load on the Int Beam 1 = 0.279 Kips/ft
Load on the Int Beam 2 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the end Beam = 0.135 Kips/ft Load on the end Beam = 0.081 Kips/ft
Load on the end Beam = 0.4 Kips/ft Load on the end Beam = 0.24 Kips/ft
Load on the Int Beam 1 = 0.465 Kips/ft Load on the Int Beam 1 = 0.279 Kips/ft
Load on the Int Beam 2 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the end Beam = 0.135 Kips/ft Load on the Int Beam 2 = 0.081 Kips/ft
Load on the end Beam = 0.77 Kips Load on the end Beam = 0.462 Kips/ft
Load on the Int Beam 1 = 0.895125 Kips Load on the Int Beam 1 = 0.537075 Kips/ft
Load on the Int Beam 2 = 0.75075 Kips Load on the Int Beam 2 = 0.45045 Kips/ft
Load on the Int Beam 3 = 1.029875 Kips/ft Load on the Int Beam 2 = 0.617925 Kips/ft
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+14)/2*20/1000 = 0.34 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = *0.6*(20+14)/2*20/1000 = 0.204 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
PIPE SUPPORT
Load on the end Beam = 0.8 Kips/ft Load on the end Beam = 0.48 Kips/ft
Load on the Int Beam = 0.8 Kips/ft Load on the Int Beam 1 = 0.48 Kips/ft
Load on the each Supporting Beam = 3.354 Kips Load on the end Beam = 2.0124 Kips/ft
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+14)/2*20/1000 = 0.34 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = *0.6*(20+14)/2*20/1000 = 0.204 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Wind Load
Wind Load ASCE 7-16
qz = 0.00256*Kz*Kzt*Kd*Ke*V2
Ke = 1 Table 26.9.1
Kd = 0.85 Table 26.6.1
Kzt = 1 Fig 26.8.1 Sect 26.8.2
Exposure category : C
Open Building
z Kz qz G*qz Cf P(lb/ft^2)
0 0.85 42.73 36.32 72.65
15 0.85 42.73 36.32 72.65
20 0.9 45.25 38.46 76.92
25 0.94 47.26 40.17 2 80.34
30 0.98 49.27 41.88 83.76
40 1.04 52.29 44.44 88.88
50 1.09 54.80 46.58 93.16
X Direction
Solidity Ratio
Sf= 15 ft
B= 120 ft
PART A
Cdg = 0.63 Fig -5.1 Wind Loads for Petrochem.
& Other Indust. Facilities
Cf=Cdg/E = 2.52
Total Wind Load on Windward/Leeward Frame = 16.36 kips (For a single Braced Bay)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Z Direction
Solidity Ratio
Sf= 20 ft
B= 15 ft
N= 6 nos
Cdg = 1.2 Fig -5.1 Wind Loads for Petrochem & Other Indust. Facilities
Cf=Cdg/E 5.89
Wind Load on Each Frame = Total Wind load/No of Frames 3.89 Kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
X Direction
Solidity Ratio
Sf= 15 ft
B= 120 ft
Total Wind Load on Windward/Leeward Frame = 8.07 kips (For a single Braced Bay)
Z Direction
Solidity Ratio
Sf= 20 ft
B= 15 ft
N= 6 nos
Cdg = 1.7 Fig -5.1 Wind Loads for Petrochem & Other Indsut Facilities
Cf=Cdg/E 4.64
Wind Load on Each Frame = Total Wind load/No of Frames = 2.64 kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
X Direction
Wind Load due to the 12"(Max Dia 1.47 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 119'-6" level at each bent line )
Wind Load due to the 18"(Max Di Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
1.76 Kips
at lvl other than 124'-6"
(The Force is applied at the column Beam Junction at all other levels other than 124'-6" at each bent line )
Wind Load due to the 16"(Max Di Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
1.66 Kips
at lvl other than 129'-6"
(The Force is applied at the column Beam Junction at all other levels other than 129'-6" at each bent line )
Wind Load due to the 24"(Max Di Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
2.05 Kips
at lvl other than 135'-0"
(The Force is applied at the column Beam Junction at all other levels other than 135'-0" at each bent line )
Z Direction
Wind Load due to the 12"(Max Dia 1.32 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 119'-6" level at grid 1-B ,5-A & 6-A)
Wind Load due to the 16"(Max Dia 1.47 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 124'-6" level at grid 2-A )
Wind Load due to the 10"(Max Dia 1.25 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 129'-6" level at grid 1-A,5B & 6B )
Wind Load due to the 12"(Max Dia 1.32 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 129'-6" level at grid 1-B)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Wind Load due to the 24"(Max Dia 1.76 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 135'-0" level at grid 2-B)
Wind Load due to the 12"(Max Dia 1.32 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 135'-0" level at grid 1-A)
Wind Load due to the 16"(Max Dia 1.47 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at 135'-0" level at grid 2-A)
X Direction
Wind Load due to the 12"(Max Dia 3.41 Kips Cl 5.1.4 Wind Loads for Petrochem & Other Indsut Facilities
(The Force is applied at the column Beam Junction at top tier at each bent line )
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Seismic Load
Site Class : E
T L= 12 sec
Risk Category: III (Table 1.5-2_
IE= 1.25 (structure)
VEQs= CsW
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
TRANSPORT CONDITION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE 6
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the Int Beam 1 = 0.56 Kips/ft Load on the Int Beam 1 = 0.336 Kips/ft
Load on the Int Beam 2 = 0.8 Kips/ft Load on the Int Beam 2 = 0.48 Kips/ft
Load on the end Beam = 0.4 Kips/ft Load on the end Beam = 0.24 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the Int Beam 1 = 0.36 Kips/ft Load on the Int Beam 1 = 0.216 Kips/ft
Load on the Int Beam 2 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the Int Beam 1 = 0.36 Kips/ft Load on the Int Beam 1 = 0.216 Kips/ft
Load on the Int Beam 2 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the end Beam = 0.24 Kips/ft Load on the end Beam = 0.144 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE 6
Load on the end Beam = 0.44 Kips/ft Load on the end Beam = 0.264 Kips/ft
Load on the Int Beam 1 = 0.8 Kips/ft Load on the Int Beam 1 = 0.48 Kips/ft
Load on the Int Beam 2 = 0.56 Kips/ft Load on the Int Beam 2 = 0.336 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the end Beam = 0.24 Kips/ft Load on the end Beam = 0.144 Kips/ft
Load on the Int Beam 1 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Int Beam 2 = 0.365 Kips/ft Load on the Int Beam 2 = 0.219 Kips/ft
Load on the Int Beam 3 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the Int Beam 3 = 0.395 Kips/ft Load on the Int Beam 2 = 0.237 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
Load on the end Beam = 0.24 Kips/ft Load on the end Beam = 0.144 Kips/ft
Load on the Int Beam 1 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Int Beam 2 = 0.365 Kips/ft Load on the Int Beam 2 = 0.219 Kips/ft
Load on the Int Beam 3 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the Int Beam 3 = 0.395 Kips/ft Load on the Int Beam 2 = 0.237 Kips/ft
Load on the end Beam = 0.2 Kips/ft Load on the end Beam = 0.12 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULE 8
Load on the end Beam = 0.8 Kips/ft Load on the end Beam = 0.48 Kips/ft
Load on the Int Beam 1 = 0.8 Kips/ft Load on the Int Beam 1 = 0.48 Kips/ft
Load on the Int Beam 2 = 0.66 Kips/ft Load on the Int Beam 2 = 0.396 Kips/ft
Load on the end Beam = 0.54 Kips/ft Load on the end Beam = 0.324 Kips/ft
Load on the end Beam = 0.6 Kips/ft Load on the end Beam = 0.36 Kips/ft
Load on the Int Beam 1 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Int Beam 1 = 0.38 Kips/ft Load on the Int Beam 1 = 0.228 Kips/ft
Load on the Int Beam 1 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Int Beam 1 = 0.48 Kips/ft Load on the Int Beam 1 = 0.288 Kips/ft
Load on the end Beam = 0.4 Kips/ft Load on the end Beam = 0.24 Kips/ft
Load on the end Beam = 0.7005 Kips Load on the end Beam = 0.4203 Kips/ft
Load on the Int Beam 1 = 0.467 Kips Load on the Int Beam 1 = 0.2802 Kips/ft
Load on the Int Beam 2 = 0.44365 Kips Load on the Int Beam 2 = 0.26619 Kips/ft
Load on the Int Beam 3 = 0.467 Kips/ft Load on the Int Beam 2 = 0.2802 Kips/ft
Load on the Int Beam 4 = 0.6071 Kips/ft Load on the Int Beam 2 = 0.36426 Kips/ft
Load on the end Beam = 0.467 Kips Load on the end Beam = 0.2802 Kips/ft
Load on the end Beam = 0.6 Kips/ft Load on the end Beam = 0.36 Kips/ft
Load on the Int Beam 1 = 0.4 Kips/ft Load on the Int Beam 1 = 0.24 Kips/ft
Load on the Int Beam 2 = 0.38 Kips/ft Load on the Int Beam 2 = 0.228 Kips/ft
Load on the Int Beam 3 = 0.4 Kips/ft Load on the Int Beam 2 = 0.24 Kips/ft
Load on the Int Beam 4 = 0.48 Kips/ft Load on the Int Beam 2 = 0.288 Kips/ft
Load on the end Beam = 0.4 Kips/ft Load on the end Beam = 0.24 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
Load on the end Beam = 1.155 Kips Load on the end Beam = 0.693 Kips/ft
Load on the Int Beam 1 = 0.77 Kips Load on the Int Beam 1 = 0.462 Kips/ft
Load on the Int Beam 2 = 0.7315 Kips Load on the Int Beam 2 = 0.4389 Kips/ft
Load on the Int Beam 3 = 0.77 Kips/ft Load on the Int Beam 2 = 0.462 Kips/ft
Load on the Int Beam 4 = 0.924 Kips/ft Load on the Int Beam 2 = 0.5544 Kips/ft
Load on the end Beam = 0.77 Kips Load on the end Beam = 0.462 Kips/ft
Load on the end Beam = 0.7005 Kips Load on the end Beam = 0.4203 Kips/ft
Load on the Int Beam 1 = 0.467 Kips Load on the Int Beam 1 = 0.2802 Kips/ft
Load on the Int Beam 2 = 0.44365 Kips Load on the Int Beam 2 = 0.26619 Kips/ft
Load on the Int Beam 3 = 0.467 Kips/ft Load on the Int Beam 2 = 0.2802 Kips/ft
Load on the Int Beam 4 = 0.5604 Kips/ft Load on the Int Beam 2 = 0.33624 Kips/ft
Load on the end Beam = 0.467 Kips Load on the end Beam = 0.2802 Kips/ft
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+14)/2*20/1000 = 0.34 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = *0.6*(20+14)/2*20/1000 = 0.204 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
PIPE SUPPORT
Load on the end Beam = 0.8 Kips/ft Load on the end Beam = 0.48 Kips/ft
Load on the Int Beam = 0.8 Kips/ft Load on the Int Beam 1 = 0.48 Kips/ft
Load on the each Supporting Beam = 3.354 Kips Load on the end Beam = 2.0124 Kips/ft
Operating load on the Longitudinal Beams on all Tiers for Pipe Turn = (20+14)/2*20/1000 = 0.34 Kips/ft
Empty load on the Longitudinal Beams on all Tiers for Pipe Turn = *0.6*(20+14)/2*20/1000 = 0.204 Kips/ft
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
13.5
X
50.41
Z
15
Longitudinal Direction
Kz = 0.9
Kd= 0.85
V= 100 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Transverse Direction
Kz = 0.9
Kd= 0.85
V= 35 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Cf = 1.8
The Load is applied in the 6 Nodes , So the load on each Node = 1.19 Kips
Cf = 1.8
The Load is applied in the 9 Nodes , So the load on each Node = 0.33 Kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
13.5
X
49
Z
15
Longitudinal Direction
Kz = 0.9
Kd= 0.85
V= 100 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Transverse Direction
Kz = 0.9
Kd= 0.85
V= 35 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Cf = 1.8
The Load is applied in the 6 Nodes , So the load on each Node = 1.19 Kips
Cf = 1.8
The Load is applied in the 9 Nodes , So the load on each Node = 0.32 Kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
13.5
X
53
Z
15
Longitudinal Direction
Kz = 0.9
Kd= 0.85
V= 100 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Transverse Direction
Kz = 0.9
Kd= 0.85
V= 35 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Cf = 1.8
The Load is applied in the 6 Nodes , So the load on each Node = 1.19 Kips
Cf = 1.8
The Load is applied in the 9 Nodes , So the load on each Node = 0.34 Kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
11
X
60
Z
18
Longitudinal Direction
Kz = 0.9
Kd= 0.85
V= 100 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Transverse Direction
Kz = 0.9
Kd= 0.85
V= 35 mph
qz= 0.00256*Kz*Kzt*Kd*Ke*V2
Cf = 1.8
The Load is applied in the 4 Nodes , So the load on each Node = 1.74 Kips
Cf = 1.8
The Load is applied in the 4 Nodes , So the load on each Node = 0.36 Kips
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
SKETCHES
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
17
16
15
14
13
12
11
10
7
MODEL PERMANENT CONDITION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
7
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
THERMAL LOAD
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULAR ANALYSIS
(TRANSPORTATION CONDITION)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MODULAR ANALYSIS
(LIFTING CONDITION)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RESULTS
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
(PERMANENT CONDITION)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
10
UNITY CHECK
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
14
13
12
11
UNITY CHECK
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
17
16
13
15
14
UNITY CHECK
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MAX Y DEFLECTION(VERTICAL)
MAX Z DEFLECTION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
(TRANSPORTATION CONDITION)
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -6
MAX Z DEFLECTION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -7
MAX Z DEFLECTION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -7
MAX Z DEFLECTION
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -7
MAX Z DEFLECTION
RDSI
DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
(LIFTING CONDITION)
RDSI
DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -6
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -7
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -8
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
RDSI
VPA DCU-844 OSBL PROJECT Design of Pipe rack -Module 6 to 8 &14
MOD -14
RDSI