Setting Out Building

BSR 100 – Building Construction 1

1
Subtopic

6.0: Introduction
6.1: Objective of Setting Out
6.2: Equipments & it’s function
6.3: Line co-ordinates, level & datum, TBM
6.4: Setting Out Works
6.5: Methods to Determine the Accuracy of Building
Angle
6.6: Precautions

2
3
6.0 Introduction

 Marking works to be done to allow a


building constructed according to
specifications of the plan.
 The position of the building will be shown
on site plan.
Therefore, the process of setting out is to
realize the dimensions of the site plan and
drawings of buildings to the actual site.

4
The position of the building
will be shown on site plan.

5 Mardhati binti Abdul Rahim


6.1 Objective of Setting Out

1) As an initial guideline to locate the position of


proposed building, i.e. direction, building line
(wall).
2) To make sure building was constructed in actual
setting, i.e. distance from road, drainage &
adjoining premises.
* distance from building line to pedestrian
walkway should be at least 8 meters.
3) To obtain accurate dimensions of the building, i.e.
square.

6
Setting out of foundations and building
7 Mardhati binti Abdul Rahim
walls up to floor level.
6.2 Equipments & it’s Function
No Equipment Function

1 Builders square / set To determine the exact angle of the


square building.

2 3-4-5 triangle To determine the exact angle of the


building.
3 Profiles board / batter To protect the demarcation line of the
boards building.
4 Telescope To determine the level & vertical.

5 Measurement tape To measure the distance.

6 Peg To mark the point where the building


line meet.
7 Plumb bob To determine the location of peg point.

8 Spirit level To determine the level.


8 Mardhati binti Abdul Rahim Thursday, March 06, 2014
9 Nails & string To mark the building line.
6.3 Line co-ordinates, level &
datum, TBM

In land surveying,
 What is line co-ordinates?
 What is level & datum?
 What is temporary bench mark?

9
6.4 Setting Out Works
 Determine the baseline building based on building
dimension as shown in the plan, i.e. long & width.
 Locate profiles board / batter board at the building
angles with dimension at least 4 ft from the
building line.
 Pull string between profiles board / batter board to
mark the building line.
 Put builders square to control the building angle &
use plumb bob to get the angle point of building.
 Locate peg at building angle.

10
11 Mardhati binti Abdul Rahim Thursday, March 06, 2014
Diagonal
Theorem Measure
Pythagoras
Method

Diameter /
Radius
Method

12 6.5Methods to Determine the


Accuracy of Building Angle
6.6 Precautions

Effects of wind on the string.


Protection of the building line
particularly during foundation
excavation works.
Setting out process for steel framed
structure need higher accuracy.

13