PROJECT MANAGEMENT

LECTURE
on

CPM: COST MODEL


SATEESH KUMAR PISINI
[ CEng, MASCE, MISSMGE, MIGS, MIEI, MFIEG ]

PRINCIPAL LECTURER & PROGRAM LEADER


DEPARTMENT OF CIVIL ENGINEERING
FIJI NATIONAL UNIVERSITY

1
2
The Optimum Duration will be one which gives the Most Economic
Cost for completing the Project.

3
PROJECT COST

4
5
6
7
8
9
10
Outage Loss

When there is a loss of profits due to inability to


meet the demand or some penalty due to delay, a
corresponding cost increase (known as outage
loss), must be added to the cost of overheads.

11
12
13
14
15
16
17
18
19
SLOPE OF DIRECT COST CURVE

20
21
Total Project Cost and Optimum Duration

22
23
24
25
26
27
28
29
30
31
 THE END 