GENERAL NOTES:
E4 FOR STRUCTURAL SPECIFICATIONS REFER TO DRAWINGS S01.01, S01.02 AND S01.03.
E3 REFER TO TYPICAL EXTERNAL PAD FOOTING DETAIL ON S10.01 FOR EXTERNAL PAD
E2 FOOTING DETAILS
E1
REFER TO S10.01 FOR PAD FOOTING REINFORCEMENT SPECIFICATIONS

PAD FOOTINGS TO BE FOUNDED IN MINIMUM 100 kPa ALLOWABLE BEARING


T.O.F R.L. 88.80 m T.O.F R.L. 88.60 m T.O.F R.L. 88.50 m CAPACITY MATERIAL. ALLOWABLE BEARING PRESSURE TO BE CONFIRMED ON SITE
BY GEOTECHNICAL ENGINEER.

SC PF1

SC PF1

SC PF1
O

O
3/

3/

3/
ALL FOOTINGS TO BE POURED IN 32 MPa CONCRETE

PAD FOOTINGS CENTRAL UNDER COLUMNS UNLESS NOTED OTHERWISE


LEGEND:
T.O.F R.L. 88.80 m
ON HOLD PENDING
200 DENOTES CONCRETE THICKNESS

SC PF1
T.O.F R.L. 88.80 m CONFIRMATION OF CSF

O
3/
HATCH DENOTES HALL
FOUNDATIONS. REFER TO DWG S03.51 DESIGN

SC PF1
O

O
FOR FOUNDATION PLAN

3/

1/
DENOTES REINFORCED CONCRETE COLUMN OVER

CC
O
T.O.F R.L. 89.10 m

1/
DENOTES STEEL COLUMN OVER

SC
SC PF1
O
T.O.F R.L. 89.00 m

3/
BW1
DENOTES LOAD BEARING MASONRY WALL OVER AND UNDER

SC PF1
O
3/
-40 DENOTES SETDOWN VALUE FOR WET AREAS
T.O.F R.L. 89.00 m
A3
A1 A2 A4 A5 B1 DJ DENOTES DOWEL JOINT. REFER TO DRAWING S11.01 FOR
DETAILS

SC PF1
O
3/
SJ DENOTES DOWEL JOINT. REFER TO DRAWING S11.01 FOR
DETAILS
T.O.F R.L. 88.25 m
PAD FOOTING SCHEDULE
CC F1
O

O
CC F1
CC F1

CC F1
O
CC F1
P

CC F1
O
1/

1/
O
O

P
1/
P

P
1/
P

1/
P
1/
REINFORCEMENT
BOTTOM TOP
AA MARK SIZE B1 B2 T1 T2 SIDE
RW1/O PF1 1800 x 1800 x 300D 10N16-200 10N16-200 - - -
T.O.F R.L. 89.10 m T.O.F R.L. 89.10 m
T.O.F R.L. 89.10 m PF2 2600 x 1000 x 600D 6N16-200 13N16-200 6N16-200 13N16-200 -
T.O.F R.L. 89.10 m T.O.F R.L. 89.10 m PF3 2200 x 2200 x 450D 11N16-200 11N16-200 - - -
HATCH DENOTES BLOCK B FOUNDATIONS
REFER TO DWG S03.00 FOR FOUNDATION PF4 1500 x 1500 x 300D 7N16-200 7N16-200 - - -
O
CC 7
2/

PF5 2200 x 2200 x 600D 11N16-200 11N16-200 - - -


PF

CC PF7

CC F7
O

O
PLAN

2/

CC 7
2/
O

O
O
CC F5

CC F5

PF
2/

2/

U
1/

PF6 2200 x 2200 x 300D 11N16-200 11N16-200 - - -


P

1/
SP
W1.01/O PF7 2500 x 2500 x 600D 13N16-200 13N16-200 - - -
RW1/O
BA PF8 3000 x 3000 x 600D 15N16-200 15N16-200 - - -
AB

U
PF9 2800 x 2200 x 600D 15N16-200 12N16-200 - - -

1/
SP
PF10 2800 x 2800 x 450D 14N16-200 14N16-200 - - -
PF11 3200 x 1800 x 300D 10N16-200 17N16-200 10N16-200 17N16-200 -

SP
PROVIDE FULL DEPTH COGS TO BTM

1/
PF12 1000 x 1000 x 400D N16-200 N16-200 - - -

U
REINFORCEMENT AT EDGE OF STAIR BASE OR LAP

U
PF13 600 x 600 x 400D - SL82 MESH - - -

1/
800 INTO PAD FOOTING WHERE APPLICABLE

SP
T.O.F R.L. 89.30 m
N16-200

PF C1/O
T.O.F R.L. 88.20 m
BTM

PILE LOAD SCHEDULE


CC F9
O
2/

C
P

3
O
CC F5

O
CC F9
O
CC F5
2/

2/

CC 5
P

2/

CC 5
O
P

O
P

PF

PF
2/
ULS GRAVITY

CC PF1
2/

O
1/
REFER TO DRAWING S14.01 FOR PRECAST DETAILS MARK SWL (kN) (kN) COMMENT(S)
1
VERIFIER: POH

SP

SP1 350.00 kN 525.00 kN


1
SP

AC DRILL AND EPOXY R16-200 DOWELS, 400


800
CW1/O

800 LONG CENTRALLY TO THE CIVIL RETAINING


600 / O
RW1 WALL FOOTING INTO MODULE FOOTING CONCRETE COLUMN SCHEDULE
N16-200

800 BB MARK SIZE COMMENT(S)


SP

1
SP
BTM

800

CC 5
O
1

CC1 350 DIA 5N20 VERTICAL + R10-200 TIES

PF
2/
N16-200 CC2 200 x 800 8N20 VERTICAL + R10-200 TIES
CW1/O

BTM 750
TYP N16-200 WALL SCHEDULE
O
CC 8
CC F5

PF

TOP 1/
O
P

CC 5
O
2/

PF

MARK THICKNESS COMMENT(S)


2/

800 CW1/O
SP

1
SP

BLOCK RETAINING WALL


1
JOB MANAGER: JL

RW1/O
RW1 190 REFER TO CIVIL DOCUMENTATION FOR
AD RETAINING WALL SETOUT AND
BTM
N16-200

N16-200

750 DETAILS
TOP

CONCRETE
CC PF9

/O
O

CW1 200 N16-200 EF VERTICAL + N12-200 EF


2
1/

CC

HORIZONTAL
CW2 200 N16-150 EF VERTICAL + N12-200 EF
HORIZONTAL
PRECAST
CC 5
O
CC F5

PCP1 200 40 MPa, N16-150 VERTICAL EF +


PF
2/
O
CC F5

2/
CC F5

CC F5
O

O
CC F5
2/
2/

2/

2/
P

N12-200 HORIZONTAL EF + N24-150


P

DOWELS
DESIGNED: MK

AE PCP2 200 40 MPa, N16-200 VERTICAL EF +


N12-200 HORIZONTAL EF + N24-200
DOWELS
PROPRIETARY
FW1 200 DINCEL WALL. N16-333 CTS VERTICAL
+ N16-300 HORIZONTAL
2/07/2020 8:37:27 PM

FOUNDATION PLAN - BLOCK A

Project Status
DRAWN: MH

AMMENDMENTS STRUC, CIVIL PROJECT NORTH


ALL SETOUT TO ARCHITECT'S DRAWINGS. NORTHROP ENGINEERS PERUMAL PEDAVOLI ARCHITECTS

D
REV
JL
BY DATE
20.12.19
DESCRIPTION
ISSUED FOR DETAILED DESIGN
DIMENSIONS TO BE VERIFIED WITH ARCHITECT AND (02) 9241 4188 T: 02 9291 0000
WEB: www.pp-a.com.au
CATHERINE FIELD PS SCALE 1 : 100 @ A1
BUILDER BEFORE COMMENCING SHOP DRAWINGS OR DRAWN CHECKED VERIFIED DATE
E JL 24.01.20 REVISED FOR DETAILED DESIGN MECH, ELEC Nominated Architect:
SITE WORK. NORTHROP ACCEPTS NO RESPONSIBILITY STEENSEN VARMING Vince Pedavoli NSW reg No.5045 NEW HIGH QUALITY CLASSROOMS MH JL POH 02.07.20

NORTH
F JL 20.03.20 REVISED FOR DETAIL DESIGN
FOR THE USABILITY, COMPLETENESS OR SCALE OF (02) 9967 2200
G JL 12.05.20 ISSUED FOR REINFORCEMENT SCHEDULING
DRAWINGS TRANSFERRED ELECTRONICALLY. HYD DRAWING NAME DRAWING NUMBER REVISION
H JL 04.06.20 REVISED FOR REINFORCEMENT SCHEDULING Sydney WOOLACOTTS
DRAWINGS NOT TO BE USED FOR CONSTRUCTION
J JL 17.06.20 REVISED FOR REINFORCEMENT SCHEDULING
Level 11, 345 George Street, Sydney, N.S.W. 2000 (02) 8241 9900 FOUNDATION PLAN - BLOCK A PROJECT CODE SCH. REF. DISC. TYPE SERIES#

1
K JL 23.06.20 REVISED FOR COORDINATION UNLESS VERIFICATION SIGNATURE HAS BEEN ADDED
Ph (02) 9241 4188 Email: sydney@northrop.com.au FIRE LANDSCAPING
L
1
JL
JL
25.06.20
02.07.20
ISSUED FOR CROWN CERTIFICATE
ISSUED FOR CONSTRUCTION
THE COPYRIGHT OF THIS DRAWING REMAINS WITH
NORTHROP CONSULTING ENGINEERS PTY LTD
ABN 81 094 433 100 MCD FIRE ENGINEERING
(04) 2392 2745
TAYLOR BRAMMER LANDS. ARCH.
(02) 9387 8855
NHQC2 - CF - ST - DWG-01_S03.11

Potrebbero piacerti anche