INSPECTION SHEET FOR EX d / Ex e / Ex n Installation

Type of inspection: ** ............................................................Degree of Control: *** ....


Type of equipment / plant: .............................................................................................
Place where is installed / Ex zone: ..................................................................................
Date of inspection: ................................................ .. .....................................................
* Specify the type of Ex installation;
** It will be completed, as the case may be: the initial phase, on commissioning, the periodic phase of the survey;
*** It will be completed as required: Detailed, Visual, Rigid
CHECKING Result
X/O
0 1
A. EQUIPMENT
1. The equipment meets requirements regarding the location EPL / Zone
2. The equipment group is correct
3. The temperature class of the equipment is correct
4. The identification of the circuitry of the equipment is correct
5. Circuit identification is available
6. Capsulation, glass parts and glass-gas seals on metal and / or components are appropriate
7. There are no unauthorized changes
8. There are no visible unauthorized changes
9. The screws, cable entries (direct and indirect) and the closing elements are
of the correct type and are complete and tight
 physical inspection;
 visual inspection.
10. The surfaces of the flanges (joint) are clean and non-degraded and the linings, if any, are
satisfactory
11. The dimensions of the anti-fouling between the tiles are within the maximum
permissible values
12. The nominal characteristics, the type and position of the lamps are correct
13. The electrical connections are tight
14. The condition of the carcass gaskets is satisfactory
15. Capsule and sealing devices are not damaged
16. Restricted breathing capsule is satisfactory
17. Engine fans have sufficient clearance to the housing and / or defenders
18. Breathing and drainage devices are satisfactory
B. INSTALAŢII
1. The type of cable is appropriate
2. There is no obvious damage to the cable
3. Sealing columns, tubes, pipes and / or pipes is satisfactory

1/2
INSPECTION SHEET FOR EX d / Ex e / Ex n Installation

Type of inspection: ** ........................................................... Degree of Control: *** ...


Type of equipment / plant: .............................................................................................
Place where is installed / Ex zone: .................................................................................
Date of inspection: ............................................... ... ....................................................
* Specify the type of Ex installation;
** It will be completed, as the case may be: the initial phase, on commissioning, the periodic phase of the
survey;
*** It will be completed as required: Detailed, Visual, Rigid
CHECKING Result
X/O
0 1
A. EQUIPMENT
1. The equipment meets requirements regarding the location EPL / Zone
2. The equipment group is correct
3. The temperature class of the equipment is correct
4. The identification of the circuitry of the equipment is correct
5. Circuit identification is available
6. Capsulation, glass parts and glass-gas seals on metal and / or components are appropriate
7. There are no unauthorized changes
8. There are no visible unauthorized changes
9. The screws, cable entries (direct and indirect) and the closing elements are
of the correct type and are complete and tight
 physical inspection;
 visual inspection.
10. The surfaces of the flanges (joint) are clean and non-degraded and the linings, if any, are
satisfactory
11. The dimensions of the anti-fouling between the tiles are within the maximum
permissible values
12. The nominal characteristics, the type and position of the lamps are correct
13. The electrical connections are tight
14. The condition of the carcass gaskets is satisfactory
15. Capsule and sealing devices are not damaged
16. Restricted breathing capsule is satisfactory
17. Engine fans have sufficient clearance to the housing and / or defenders
18. Breathing and drainage devices are satisfactory
B. INSTALAŢII
1. The type of cable is appropriate
2. There is no obvious damage to the cable
3. Sealing columns, tubes, pipes and / or pipes is satisfactory