(MV switchgear, Aux. Transformers dry type, LV switchgear, DC/UPS sytem, Control cubicles & Batteries, VSD)
freigegeben/ Released
Non-public
0.5m
0.5m
fusebox fusebox
control panel for
0.8m 0.8m HVAC Venitlation
1.2m
lighting up to 1m
Circulation 1.5 m
C Trafo
15 m
Eye wash
2.5m
station with
potable 00BFT50
water supply
1.6MVA 2m
Container G1 Container G2
12BRC10
1.2m
1.2m
1.2m
View Window
11BTL10 11BRC10
1.2m
HMI
HMI
SERVICE
12BRT10
11BRT10
0.65m 0.65m
TROLLEY
EBOP ESOP
1.2m
ST10 ST10
1.2m
5.5 m
12BTL20
0.8m
0.8m
5.5m
4.8m
Battery 00BTB10
0.6m
0.6m
11BTT&
12BTT&
11BUG
12BUG
4.8m
2.15m
88BBT
0.7m
1.9 m
VFD
1.9 m
0.7m
88BB
VFD
4.3m
00BVB10
2m
ELOP/
Battery 12BTA10
ESOP
GT12
0.65m
ELOP/
ESOP
0.65m
GT11
2.7m
6.5m
1.95m 00BVC10
TCP GT 11
12BVC10
TCP GT12
11BVC10
– 11BBA
2m
1.95m
4.3m
1.2 m
MV SWGR – 00BBB10
– 00BBA10
CONTINUE ON PAGE 3
LV – 11BHC12
2m
00BRB
12BHC11
MV SWGR
12BTL10
0.8m
11BTL20
0.8m
00BRA
GAMP
GAMP
0.85m 0.8m
0.8m
LV 00BFA50 CCW
MV SWGR
1.4m
5.5 m
5.5 m
00BRU10
0.85m
5.6m
ECS
ECS
5.6m
00BRT10
5.3m
Battery 11BTA10
1.4m
00BTM20 00BTM10
0.8m 0.8m
Battery 00BTA10
2.6m
2.6m
5.3m
LV – 11BMC10
00BVA10
2.15 m
LV – 11BHC11
GPP
GPP
LV - 12BMC10
LV - 12BHC12
SERVICE
1.2 m TROLLEY
9.85 m
0.8 m
1.4 m
10.5m
00BTL10 00BTL20
11BNC10
12BNC10
0.8 m 0.8m
roof through ladder
1.95 m
casing
1.95 m
freigegeben/ Released
0.95 m 0.95 m
Air flow
direction
Eye wash 0.8m
station with
potable
Expansion
1.2m
0.5m
0.5m
fusebox fusebox
0.5m Container M3 Container H12 Container I1 Container H1
1.8m Container H11
0.8m 0.8m
3.2 m 3.2 m 3.2 m 3.2 m 3.2 m
B 3.2 m 3.2 m
3.5m 0.4 m
Container I2
Battery fusebox
Arc expansion channel
Wallmounted IP65
H/W/D 0.8/0.6/0.3 m
prefered side. 4m
Access and operation
clearance to other
from outside room structure at +4.5m 26.2m
Non-public
D Stairs
c c c c
1.35m
1.35m
1.35m
Trafo
1.2m
Trafo Trafo Trafo
00BFU50 00BFT10 00BFV10 00BFU10
2.5m
AVR Panel
Wall mounted
750x500 mm
400 kVA
6.7 m
8.7 m
9.8 m
00BLT10
control
1.65m
0.8m
8.7 m
Trafo
Fire
0.8m
4.2m
0.8m
1m
CONTINUE ON PAGE 2
LV 00BFB50 CCW
4.8 m
400 kVA
1.6m
WSC SIL
00BNT10
Trafo
1.65m
00BFC10 – Non redundant loads
00BFA10 – Redundant loads
00BMC10 – Essential loads
TCP - ST
1.2 m
1m
2.4m
3.55 m
00BFB10 – Redundant loads
WSC
0.6m
BUS 00BLC10
480/220 VAC
2.6 m
1.6 m
1.6m
HRSG12 SIL
HRSG11 SIL
1.6m
BOP-RIO2
GPP
Stairs
2.4 m
2.4 m
2.15 m
2.4 m
Edge
BUS 00BNC10
0.8m
BOP-RIO1
HRSG 12
480/220 VAC
HRSG 11
freigegeben/ Released
TROLLEY
SERVICE
GAMP
0.8m
0.8m 0.8 m
0.8m
Circulation 1.2m 0.8m
C
Container H2 Container H3 Container H4 Container H5 Container M1 Container M2
Non-public
Platform
Stairs
D
3.4m 8.2m 3.4m c
c
2.0m
1.0m
2.0m 0.6x0.2m
HP IP Feedwater Pump
DC Starter Drive -11BPA11
Wall box
3/1.5/1.5 MVA
3.2m
3/1.5/1.5 MVA
View Window
11BPA11
11BPA12
View Window
Terminal point
3.9 m
for water cooling Container F21
3.2m
Stairs
Stairs
1.2m
1.2m
1.0m
HP IP Feedwater Pump Terminal point
Drive -11BPA12 for water cooling
Fire
0.8m
11BHD10 - Secondary
0.6
11BMD10- Secondary Board
control
3.2m
Board Non-Essential Essential Transformer
5.9 m 4m Wall mounted 0.8m control panel for
600x300 mm
HVAC Venitlation
Platform
D Container H21 lighting up to 1m
C
1.5m
1.45m 11BND10 11BLD10 1.95 m 1.45m
2.65 m Trafo 1.2 m 2.4m
0.9m
Trafo
0.9m
SERVICE
11BLU10 SP & L SP & L Non- 11BNU10 BMS1 HRSG1
Platform 2m TROLLEY
250 kVA Essential Essential 250 kVA
15 m
Non-public
Platform
Stairs
D
3.4m 8.2m 3.4m
c c
2.0m
1.0m
2.0m HP IP Feedwater Pump
0.6x0.2m
DC Starter
Drive -12BPA11
Wall box
3/1.5/1.5 MVA
3.2m
3/1.5/1.5 MVA
View Window
12BPA11
12BPA12
View Window
Terminal point
3.9 m
for water cooling Container F22
3.2m
Stairs
Stairs
1.2m
1.2m
1.0m
HP IP Feedwater Pump Terminal point
Drive -12BPA12 for water cooling
Fire
0.8m
12BHD10 - Secondary
0.6
12BMD10- Secondary Board
control
3.2m
Board Non-Essential Essential Transformer
5.9 m 4m Wall mounted 0.8m control panel for
600x300 mm
HVAC Venitlation
Platform
D Container H22 lighting up to 1m
C
1.5m
1.45m 12BND10 12BLD10 1.95 m 1.45m
2.65 m Trafo 1.2 m 2.4m
0.9m
Trafo
0.9m
SERVICE
12BLU10 SP & L SP & L Non- 12BNU10 HRSG2
Platform 2m TROLLEY
250 kVA Essential Essential 250 kVA
BMS2
15 m
Non-public
Removable wall on Single access Single access Single access Single access
all transformers and door with view door with view door with view door with view
maintenance door Window Window Window Window
with window
Removable walls
In all transformers
Container H31 at ground level
Container H32 at +2.0m level c 3.75 m c c c
0.725m
2.3m 2.3m 2.3m 2.3m
Platforms located above 400 mm
Aux Trafo Aux Trafo Aux Trafo
1.32m
Aux Trafo
1.32m
1.32m
From the bottom of the module
2.5 m
1.32m
00BFT30 00BFT40 00BFU30 00BFU40
3.15MVA 3.15MVA 3.15MVA
Stairs
3.15MVA
Stairs
Container H31 0.6m
0.6
00BFA30 ACC FANS 00BFB30 ACC FANS SERVICE
6.9m 5.1 m TROLLEY
3.2 m
control panel for
Platform
2.5x2 m HVAC Venitlation
c
D Container H32 lighting up to 1m
ACC RIO
ACC room
Cable entry from bottom
freigegeben/ Released
Non-public
15m
00BLA60 LV SWGR-00BFA60
0.8m
Trafo
00BLT60
LV SIDE
1.95m 7.5m
1.45m
00BFT60
2MVA
Trafo
View Window
Single access
3.2 m
door and
2m
c
Container H41 removable wall
D
Stairs
0.8m Trafo
Fire 00BNT60 1.95m 1.2m
2m
Corridor
PRS control 1.45m 00BND60
Transformer
1.95m
0.8m
Wall mounted Trafo
BOP RIO3
View Window
600x300 mm 00BLU60
1.6m 00BLB60
00BFU60
3.2 m
1.45m
2MVA
Trafo
Container H42 Single access
C
c
removable wall
2m
1.9m
0.8m
Platform Platform 7.5m 1.2m
1m
0.6 Gas
1.5m 2m extinguishing 00BFB60
ROP E-Room
Cable entry from bottom
freigegeben/ Released
Non-public
Note D:
HVAC main E-room and battery room: principle
double maintenance door,
min 2x1m large, 2.3m high
Personal access door with panic
bar, min 0.8m large, 2m high Secondary E-room(s): Roof top or split units or equivalent
Access with handrails in seller scope in case of required roof access for maintenance
freigegeben/ Released
Non-public
Stairs
C Platform
A A Stairs D A
C
0.5m
0.5m
fusebox fusebox
control panel for
0.8m 0.8m HVAC Venitlation Circulation 1.5 m
C Trafo
1.35m
Eye wash lighting up to 1m
bottle and 00BFT50
collector
tray
1.8m
View Window
SERVICE
TROLLEY
5.5 m
5.5m
Battery 00BTB10
Battery 12BTA10
TROLLEY
SERVICE
MV SWGR – 11BBA
CONTINUE ON PAGE 3
5.5 m
5.5 m
Battery 11BTA10
Battery 00BTA10
freigegeben/ Released
0.95 m 0.95 m
Air flow
direction Eye wash
bottle and
collector
tray
0.8m 0.8m Circulation 1.2 m
C
0.5m
0.5m
fusebox fusebox
Container M3 Container H12 Container I1 Container H1
Container G1 Container G2 Container H11
B B
Container I3 7m Container I2
Non-public
A A A A D Stairs
control
0.8m
1.35m
1.35m
1.35m
Fire
1.35m
Trafo Trafo Trafo Trafo
00BFU50 00BFT10 00BFV10 00BFU10
2.5m
3.0m
400 kVA
00BLT10
CONTINUE ON PAGE 11
1.4m
Trafo
1m
400 kVA
00BNT10
Trafo
1.4m
1m
Stairs
freigegeben/ Released
TROLLEY
SERVICE
0.8 m
0.8 m
Circulation 1.2m
C
Container H2 Container H3 Container H4 Container H5 Container M1 Container M2
Design basis IEC 60364 Part 7-729: Low-voltage electrical installations –Requirements for special installations or locations –Operating or maintenance gangways
IEC 61936-1 Power installations exceeding 1 kV a.c. Common rules Non-public
Stairs
Stairs
Platform
D C
Rop E-room
ACC E-room
Stairs
Corridor
0.54
C
freigegeben/ Released
Stairs
Stairs
Platform
D C
Platform
Design basis IEC 60364 Part 7-729: Low-voltage electrical installations –Requirements for special installations or locations –Operating or maintenance gangways
IEC 61936-1 Power installations exceeding 1 kV a.c. Common rules Non-public
Main E-room
Container H11
Container H12
Container H1
Container G2
Container H2
Container G1
Container M3
Container H4
Container H3
Container I2
Container M2
Container I1
Container H5
Container M1
00UBB10R521
Non-public
Room designation:
• Secondary E-room power island GT11: 11UBB10R201
• Secondary E-room power island GT12: 12UBB10R201
• ACC E-room: 00UBB10R410
• RoP E-Room: 00UBB10R610
11UBB10R201 12UBB10R201
ROP E-Room
ACC E-Room
00UBB10R610
Container H31
Container H42
Container H32 00UBB10R612
00UBB10R410
Non-public
12BHC11 LV Switchgear Main E-room H12 4300 800 2400 1 1.4 1 3.225
12BMC10 LV Switchgear Main E-room H12 5600 800 2400 1 3.1 0.8 4.2
88BT-12 VFD for GT11 Main E-room H12 610 610 1 0.2 1 1
12BTT10&12BUG10 DC-DC CONVERTER & DCDB Main E-room H12 600 800 2205 1 0.075 1 0.25
12BRT10 Inverter 1p 120Vac 60 Hz+Bypass Main E-room H12 1205 810 2205 1 0.96 0.8 18.703 0.9 17.57 11.5 29.07
12BTL10 Charger Main E-room H12 810 810 2205 1 7.29 0.5 0.9
12BTL20 Charger Main E-room H12 810 810 2205 1 7.29 0.5 0.9
12BRC10 Subdistribution board 120Vac 1p Main E-room H11 1200 800 2155 1 0.9 0.9 0.72
Emergency lube oil pump /
ELOP/ESOP for GT12 Main E-room H12 650 620 2150 1 8 0.5
Emergency seal oil pump starters 1.5 Non-public
Main E-room
The distance indicated in the below scketch is between pillar centers
3.1m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.2m 3.1m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
3.75m
freigegeben/ Released
3.65m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.55m
3.65m
3.55m
I2 G1 G2 H11 H1
M3 H12 I1 H2 H3 H4 H5 M1 M2
Non-public
Containers placed and welded on steel plates at top of Concrete pillar location. Steel plate LxD 500 x 500mm
concrete pillars
RoP E-room
3.7m
Platform
3.1m
Stairs
3.55m 3.75m 3.75m 3.55m
3.55m 3.75m 3.75m 3.55m
Platform
Stairs
1.2m
Platform
3.0m
Stairs
Stairs
1.2m
2.8m
ACC E-room
3.55m 3.75m Platform
3.75m 3.55m
Non-public
Air out Air out Air out Air out Air out
mounted on mounted on mounted on mounted on mounted on
vertical wall, vertical wall, vertical wall, vertical wall, vertical wall,
top part top part top part top part top part
Forced ventilation, Forced ventilation, Forced ventilation, Forced ventilation, Forced ventilation,
pushed air, pushed air, pushed air, pushed air, pushed air,
ventilation ventilation ventilation ventilation ventilation
mounted below or mounted below or mounted below or mounted below or mounted below or
HVAC C Air return side of the side of the side of the side of the side of the
container container container container container
To
atmosphere
or to I2
N+1 redundancy
HVAC B
freigegeben/ Released
HVAC A
Non-public
Air out
mounted on
Air out Air out
vertical wall,
mounted on mounted on
top part
vertical wall, vertical wall,
top part top part
Forced
ventilation,
Forced Roof top units or split Forced
pushed air,
ventilation, ventilation,
pushed air, unit – N+1 redundancy pushed air, ventilation
ventilation mounted below
ventilation
mounted below the container
mounted below
the container the container
Forced
ventilation,
pushed air,
Roof top units or split unit – N+1 redundancy ventilation
mounted below
the container
ACC E-room
Non-public
Rain water
interface point: Rain water Rain water
at +0.1m interface point: interface point:
at +0.1m at +0.1m
Non-public
Rain water
interface point:
at +0.1m
Rain water
interface point:
at +0.1m
ACC E-room
freigegeben/ Released
ROP E-room
Rain water
interface point:
at +0.1m Rain water
interface point:
at +0.1m
Rain water collection down to +0.1m
level in E-container seller scope
Non-public
Lighting supplied through the HVAC and lighting distribution panel. Power socket
Essential lighting: no
OPTION: 50lux, minimum each 3rd lamp.
Emergency lighting: using 90min integrated battery back-up to mark escape way with 2 lux minimum and in compliance with local law at installation place.
Power outlet: single phase as per “Electrical equipment for system package, technical requirements”