Sei sulla pagina 1di 4

PRESUPUESTO COMPARATIVO

PRESUPUESTO MODIFICADO POR ADICIONALES DE OBRA POR MAYORES METRADOS, PARTIDAS NUEVAS Y DEDUCTIVOS DEL PROYECTO: "CREACION DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE BOLOGNESI DEL CC.PP. URBANO DE LIVITACA - DITRTITO DE LIVITACA - CHUMBIVILCAS - CUSCO"

PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO POR MAYOR PRESUPUESTO MODIFICADO
PRESUPUESTO PROGRAMADO PRESUPUESTO POR BAJO RENDIMIENTO PRESUPUESTO POR DEDUCTIVOS
ITEM DESCRIPCION DE PARTIDA UND 01 02 03 METRADO SOLICITADO N° 04
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/.
1 COMPONENTE 01: INFRAESTRUCTURA VEHICULAR 630,913.24 690,238.95 699,342.76 699,342.76 - 55,256.41 - 754,599.12
1.1 OBRAS PROVISIONALES 3,008.01 3,008.01 3,008.01 3,008.01 3,008.01
1.1.1 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 M und 1.00 888.81 888.81 1.00 888.81 1.00 888.81 1.00 888.81 1.00 888.81
1.1.2 OFICINA, ALMACEN Y GUARDIANIA DE OBRA mes 3.00 250.00 750.00 3.00 750.00 3.00 750.00 3.00 750.00 3.00 750.00
1.1.3 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION und 40.00 34.23 1,369.20 40.00 1,369.20 40.00 1,369.20 40.00 1,369.20 40.00 1,369.20
1.2 TRABAJOS PRELIMINARES 15,052.98 15,052.98 - 15,052.98 - 15,052.98 - 15,052.98
1.2.1 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS gbl 0.50 9,375.04 4,687.52 0.50 4,687.52 0.50 4,687.52 0.50 4,687.52 0.50 4,687.52
1.2.2 TRANSPORTE DE MATERIALES gbl 0.50 2,364.22 1,182.11 0.50 1,182.11 0.50 1,182.11 0.50 1,182.11 0.50 1,182.11
1.2.3 TRAZO, NIVEL Y REPLANTEO GENERAL DEL PROYECTO m² 3,143.05 1.21 3,803.09 3,143.05 3,803.09 3,143.05 3,803.09 3,143.05 3,803.09 3,143.05 3,803.09
1.2.4 LIMPIEZA GENERAL m² 3,143.05 1.33 4,180.26 3,143.05 4,180.26 3,143.05 4,180.26 3,143.05 4,180.26 3,143.05 4,180.26
1.2.5 REUBICACION DE POSTE Y LUZ (PAGO A EMPRESA POR REUBICACION POR SERVICIOS) und 2.00 600.00 1,200.00 2.00 1,200.00 2.00 1,200.00 2.00 1,200.00 2.00 1,200.00
1.3 SEGURIDAD Y SALUD 3,103.60 3,103.60 - 6,103.60 - 6,103.60 - - 6,103.60

1.3.1 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO und 1.00 103.60 103.60 1.00 103.60 1.00 103.60 1.00 103.60 1.00 103.60

1.3.2 EQUIPOS DE PROTECCION INDIVIDUAL gbl 1.00 2,500.00 2,500.00 1.00 2,500.00 2.00 5,000.00 2.00 5,000.00 - 2.00 5,000.00
1.3.3 EQUIPOS DE PROTECCION COLECTIVA gbl 1.00 500.00 500.00 1.00 500.00 2.00 1,000.00 2.00 1,000.00 - 2.00 1,000.00
1.4 MOVIMIENTO DE TIERRAS 127,479.29 163,816.83 - 163,816.85 - 163,816.85 - - 163,816.83
1.4.1 SUB RASANTE 127,479.29 163,816.83 - 163,816.85 - 163,816.85 - - 163,816.83
1.4.1.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 2,167.62 1.21 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82
1.4.1.2 CORTE DE MATERIAL COMPACTO m³ 1,436.33 12.57 18,054.67 1,436.33 18,054.67 1,436.33 18,054.67 1,436.33 18,054.67 1,436.33 18,054.67
1.4.1.3 EXTENDIDO , BATIDO Y ESCARIFICADO DE MATERIAL DE SUB RASANTE m² 281.79 6.36 1,792.18 281.79 1,792.18 281.79 1,792.18 281.79 1,792.18 281.79 1,792.18
1.4.1.4 PERFILADO, RIEGO Y COMPACTADO DE SUB RASANTE m² 2,167.62 8.46 18,338.07 2,167.62 18,338.07 2,167.62 18,338.07 2,167.62 18,338.07 2,167.62 18,338.07
1.4.1.5 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 1,867.23 44.85 83,745.27 1,867.23 83,745.27 1,867.23 83,745.27 1,867.23 83,745.27 1,867.23 83,745.27
1.4.1.6 LIMPIEZA DE TERRENO MANUAL m² 2,167.62 1.35 2,926.29 2,167.62 2,926.29 2,167.62 2,926.29 2,167.62 2,926.29 2,167.62 2,926.29
1.4.1.7 Material para mejoramiento de sub-razante (OVER) m³ - - - 910.40 24,935.86 910.40 24,935.86 910.40 24,935.86 - 910.40 24,935.86
1.4.1.8 Extendido de material OVER, mejoramiento de sub-razante m² - - - 2,167.62 7,326.56 2,167.62 7,326.56 2,167.62 7,326.56 - 2,167.62 7,326.56
1.4.1.9 Compactado sub-razante mejorada con OVER m² - - - 2,167.62 4,075.13 2,167.62 4,075.13 2,167.62 4,075.13 - 2,167.62 4,075.13
1.5 PAVIMENTO RIGIDO 356,031.61 306,432.33 - 307,231.46 - 307,231.46 - 37,047.28 - - 344,278.74
1.5.1 BASE Y SUB BASE GRANULAR 102,783.25 37,895.59 - 37,895.59 - 37,895.59 - - - 37,895.59
1.5.1.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 2,167.62 1.21 2,622.82 - - - -
1.5.1.2 EXTRACCION Y PREPARADO DE MATERIAL DE BASE Y SUB BASE m³ 845.38 17.52 14,811.06 - - - -
1.5.1.3 CARGUIO, TRANSPORTE DE MATERIAL DE BASE Y SUB BASE m³ 845.38 24.14 20,407.47 - - - -
1.5.1.4 EXTENDIDO, BATIDO Y PERFILADO DE MATERIAL BASE Y SUB BASE m² 4,335.24 6.36 27,572.13 - - - -
1.5.1.5 RIEGO Y COMPACTADO DE BASE Y SUB BASE m² 4,335.24 5.44 23,583.71 - - - -
1.5.1.6 MEJORAMIENTO DE SUB BASE m² 2,167.62 6.36 13,786.06 - - - -
1.5.1.7 Material de Sub Base zarandeado puesto en obra m³ - - - 563.58 19,167.36 563.58 19,167.36 563.58 19,167.36 - 563.58 19,167.36
1.5.1.8 Extendido de material Sub Base m² - - - 2,167.62 6,134.36 2,167.62 6,134.36 2,167.62 6,134.36 - 2,167.62 6,134.36
1.5.1.9 Perfilado y Compactado de Sub Base m² - - 2,167.62 8,778.86 2,167.62 8,778.86 2,167.62 8,778.86 - 2,167.62 8,778.86
1.5.1.10 Riego de Sub Base m² - - - 2,167.62 3,815.01 2,167.62 3,815.01 2,167.62 3,815.01 - 2,167.62 3,815.01
1.5.2 LOSA DE RODADURA 253,248.36 268,536.74 - 269,335.87 - 269,335.87 - 37,047.28 - - 306,383.15
1.5.2.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 2,167.62 1.21 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82 2,167.62 2,622.82
1.5.2.2 ENCONFRADO Y DESENCOFRADO PARA JUNTA LONGITUDINAL m² 72.25 5.53 399.54 72.25 399.54 216.76 1,198.68 216.76 1,198.68 - 5,330.13 5,330.13 216.76 6,528.81
1.5.2.3 ENCONFRADO Y DESENCOFRADO EN PAVIMENTO RIGIDO TRANSVERSAL m 80.67 9.53 768.79 80.67 768.79 80.67 768.79 80.67 768.79 80.67 768.79
1.5.2.4 CANASTILLAS PARA JUNTAS TRANSVERSALES Y DILATACION-DOVELAS kg 660.67 2.90 1,915.94 660.67 1,915.94 660.67 1,915.94 660.67 1,915.94 4,545.41 4,545.41 660.67 6,461.35
1.5.2.5 JUNTA LONGITUDINAL DE ARTICULACION Ø 1/2" ACERO CORRUGADO kg 360.82 4.35 1,569.57 360.82 1,569.57 360.82 1,569.57 360.82 1,569.57 360.82 1,569.57
1.5.2.6 JUNTA TRANSVERSAL DE CONTRACCION Ø 3/4" ACERO LISO kg 1,467.47 8.05 11,813.13 1,467.47 11,813.13 1,467.47 11,813.13 1,467.47 11,813.13 1,467.47 11,813.13
1.5.2.7 ACERO GRADO 60 Ø 1/4" , EN MALLA DE TEMPERATURA kg 3,687.84 6.41 23,639.05 3,687.84 23,639.05 3,687.84 23,639.05 3,687.84 23,639.05 3,835.36 3,835.36 3,687.84 27,474.41
1.5.2.8 JUNTA DE DILATACION Ø 1" ACERO LISO kg 1,761.46 7.24 12,752.97 1,761.46 12,752.97 1,761.46 12,752.97 1,761.46 12,752.97 1,761.46 12,752.97
1.5.2.9 CONCRETO FC=210 KG/CM2 m³ 433.52 436.55 189,253.16 433.52 189,253.16 433.52 189,253.16 433.52 189,253.16 23,336.38 23,336.38 433.52 212,589.54
1.5.2.10 CURADO DE CONCRETO EN LOSA DE PAVIMENTO m² 2,167.62 0.53 1,148.84 - - - - -
1.5.2.11 SELLADO DE JUNTA DE CONTRACCION m 492.00 7.22 3,552.24 - - - - -
1.5.2.12 SELLADO DE JUNTAS DE DILATACION m 252.00 7.10 1,789.20 - - - - -
1.5.2.13 SELLADO DE JUNTAS LONGITUDINALES m 361.27 5.60 2,023.11 - - - - -
1.5.2.14 Curado de concreto en clima frio losa de rodadura m² - - - 2,167.62 6,546.21 2,167.62 6,546.21 2,167.62 6,546.21 - 2,167.62 6,546.21
1.5.2.15 Corte de juntas de contracción m - - - 492.00 3,803.16 492.00 3,803.16 492.00 3,803.16 - 492.00 3,803.16
1.5.2.16 Sellado de juntas de contraccion m - - - 492.00 5,800.68 492.00 5,800.68 492.00 5,800.68 - 492.00 5,800.68
1.5.2.17 Sellado de juntas de dilatación m - - - 246.00 3,392.34 246.00 3,392.34 246.00 3,392.34 - 246.00 3,392.34
1.5.2.18 Sellado de juntas longitudinales m - - - 361.27 4,259.37 361.27 4,259.37 361.27 4,259.37 - 361.27 4,259.37
1.6 ENCIMADO DE BUZON 5,063.80 6,599.29 6,599.29 6,599.29 - 6,599.29
1.6.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 8.85 1.21 10.71 12.39 14.99 12.39 14.99 12.39 14.99 12.39 14.99
1.6.2 ENCOFRADO Y DESENCOFRADO DE BUZONES m² 15.54 49.42 767.99 18.22 900.43 18.22 900.43 18.22 900.43 18.22 900.43
1.6.3 ACERO DE REFUERZO FY=4,200KG/CM2 kg 124.55 6.31 785.91 124.55 785.91 124.55 785.91 124.55 785.91 124.55 785.91
1.6.4 TAPA DE F°F° PARA BUZON DE DE=0.60M und 5.00 449.28 2,246.40 7.00 3,144.96 7.00 3,144.96 7.00 3,144.96 7.00 3,144.96
1.6.5 CONCRETO FC=210 KG/CM2, EN LOSA DE BUZON m³ 2.73 458.90 1,252.80 3.82 1,753.00 3.82 1,753.00 3.82 1,753.00 3.82 1,753.00
1.7 INFRAESTRUCTURA DE EVACUACION DE AGUAS FLUVIALES 58,655.83 82,483.65 83,348.30 83,348.30 - 7,843.77 - - 91,192.06
1.7.1 SUMIDERO TRANSVERSAL 18,391.70 18,391.70 19,256.36 19,256.36 - 441.56 - 19,697.92
1.7.1.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 18.00 1.21 21.78 18.00 21.78 18.00 21.78 18.00 21.78 18.00 21.78
1.7.1.2 EXCAVACION DE ZANJAS EN SUMIDERO m³ 14.40 21.62 311.33 14.40 311.33 14.40 311.33 14.40 311.33 14.40 311.33
1.7.1.3 PERFILADO Y COMPACTADO PARA FONDO DE SUMIDERO m² 18.00 6.45 116.10 18.00 116.10 18.00 116.10 18.00 116.10 18.00 116.10
1.7.1.4 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 18.72 23.39 437.86 18.72 437.86 18.72 437.86 18.72 437.86 18.72 437.86
1.7.1.5 ENCOFRADO Y DESENCOFRADO DE SUMIDERO m² 32.16 26.12 840.02 32.16 840.02 32.16 840.02 32.16 840.02 441.56 441.56 32.16 1,281.58
1.7.1.6 CONCRETO MEZCLA C:H 1:12, EN SOLADO e=10CM m² 18.00 37.52 675.36 18.00 675.36 18.00 675.36 18.00 675.36 18.00 675.36
1.7.1.7 ACERO DE REFUERZO FY=4,200KG/CM2 kg 314.24 6.31 1,982.85 314.24 1,982.85 451.27 2,847.51 451.27 2,847.51 - 451.27 2,847.51
1.7.1.8 CONCRETO FC=210KG/CM2 m³ 6.62 436.55 2,889.96 6.62 2,889.96 6.62 2,889.96 6.62 2,889.96 6.62 2,889.96
1.7.1.9 TARRAJEO CON IMPERMEABILIZANTE C:A + ADITIVO m² 54.66 38.19 2,087.47 54.66 2,087.47 54.66 2,087.47 54.66 2,087.47 54.66 2,087.47
PRESUPUESTO COMPARATIVO
PRESUPUESTO MODIFICADO POR ADICIONALES DE OBRA POR MAYORES METRADOS, PARTIDAS NUEVAS Y DEDUCTIVOS DEL PROYECTO: "CREACION DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE BOLOGNESI DEL CC.PP. URBANO DE LIVITACA - DITRTITO DE LIVITACA - CHUMBIVILCAS - CUSCO"

PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO POR MAYOR PRESUPUESTO MODIFICADO
PRESUPUESTO PROGRAMADO PRESUPUESTO POR BAJO RENDIMIENTO PRESUPUESTO POR DEDUCTIVOS
ITEM DESCRIPCION DE PARTIDA UND 01 02 03 METRADO SOLICITADO N° 04
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/.
1.7.1.10 CURADO DE CONCRETO EN SUMIDEROS m² 54.66 0.53 28.97 54.66 28.97 54.66 28.97 54.66 28.97 54.66 28.97
1.7.1.11 SUMIDERO PREPARADO Y COLOCADO CON PLATINA DE 2"X1/2" und 3.00 3,000.00 9,000.00 3.00 9,000.00 3.00 9,000.00 3.00 9,000.00 3.00 9,000.00
1.7.2 INSTALACION DE TUBERIA PARA EVACUACION DE AGUAS FLUVIALES 40,264.13 53,767.68 53,767.67 53,767.67 - 7,402.21 - - 61,169.88
1.7.2.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 209.60 1.21 253.62 209.60 253.62 209.60 253.62 209.60 253.62 209.60 253.62
1.7.2.2 EXCAVACION DE ZANJAS PARA AGUAS FLUVIALES m³ 202.62 21.62 4,380.64 244.62 5,288.68 244.62 5,288.68 244.62 5,288.68 - 7,402.21 7,402.21 244.62 12,690.89
1.7.2.3 PERFILADO Y COMPACTADO CON PLANCHA VIBRATORIO m² 202.62 5.26 1,065.78 202.62 1,065.78 202.62 1,065.78 202.62 1,065.78 202.62 1,065.78
1.7.2.4 CAMA DE ARENA PARA APOYO DE TUBERIA m 253.27 10.89 2,758.11 253.27 2,758.11 253.27 2,758.11 253.27 2,758.11 253.27 2,758.11
1.7.2.5 INSTALACION DE TUBERIA PVC NTP 4435 D=315MM S-25 m 253.27 109.57 27,750.79 253.27 27,750.79 253.27 27,750.79 253.27 27,750.79 253.27 27,750.79
1.7.2.6 RELLENO Y COMPACTADO CON MATERIAL PROPIO m³ 57.75 22.04 1,272.81 7.88 173.68 7.88 173.68 7.88 173.68 - 7.88 173.68
1.7.2.7 ZARANDEO DE MATERIAL PROPIO PARA RELLENO m³ 104.87 21.04 2,206.46 12.60 265.10 12.60 265.10 12.60 265.10 - 12.60 265.10
1.7.2.8 ELIMINACION DE MATERIAL EXCEDENTE DE AGUA PLUVIAL m³ 19.07 30.20 575.91 282.47 8,530.59 282.47 8,530.59 282.47 8,530.59 - 282.47 8,530.59
1.7.2.9 Relleno con material granular m³ - - - 140.89 7,681.32 140.89 7,681.32 140.89 7,681.32 - 140.89 7,681.32
1.7.3 BUZONES DE INSPECCION SISTEMA DE DRENAJE 3,562.92 - 3,562.92 - 3,562.92 - - 3,562.92
1.7.3.1 Trazo, niveles y replanteo durante el proceso m² - - - 3.20 1.70 3.20 1.70 3.20 1.70 - 3.20 1.70
1.7.3.2 Excavacion manual en terreno compacto m³ - - - 6.88 74.30 6.88 74.30 6.88 74.30 - 6.88 74.30
1.7.3.3 Perfilado de Excavaciones m² - - - 13.24 17.21 13.24 17.21 13.24 17.21 - 13.24 17.21
1.7.3.4 Eliminacion desmonte D=50 m manual m³ - - - 8.94 115.95 8.94 115.95 8.94 115.95 - 8.94 115.95
1.7.3.5 Eliminacion desmonte hasta 14 km de distancia m³ - - - 8.94 126.68 8.94 126.68 8.94 126.68 - 8.94 126.68
1.7.3.6 Solado E=0.10 cm; Mezcla 1:12 m² - - - 3.20 111.49 3.20 111.49 3.20 111.49 - 3.20 111.49
1.7.3.7 Concreto F´C=210 kg/cm2 m³ - - - 2.94 1,283.46 2.94 1,283.46 2.94 1,283.46 - 2.94 1,283.46
1.7.3.8 Enconfrado y Desencofrado en paredes de buzon m² - - - 14.51 84.30 14.51 84.30 14.51 84.30 - 14.51 84.30
1.7.3.9 Acero F'Y=4200 kg/cm2 kg - - - 44.29 287.44 44.29 287.44 44.29 287.44 - 44.29 287.44
1.7.3.10 Tarrajeo Interior de buzon con impermeabilizante C:A + ADITIVO m² - - - 14.51 554.14 14.51 554.14 14.51 554.14 - 14.51 554.14
1.7.3.11 Tapa F°F° para buzon D=0.60 m und - - - 2.00 898.56 2.00 898.56 2.00 898.56 - 2.00 898.56
1.7.3.12 Curado de estructura de concreto m² - - - 14.51 7.69 14.51 7.69 14.51 7.69 - 14.51 7.69
1.7.4 CAJAS DE REGISTRO 6,761.34 6,761.34 6,761.34 - - 6,761.34
1.7.4.1 Trazo, niveles y replanteo durante el proceso m² - - - 4.00 2.12 4.00 2.12 4.00 2.12 - 4.00 2.12
1.7.4.2 Excavacion manual en terreno compacto m³ - - - 6.00 64.80 6.00 64.80 6.00 64.80 - 6.00 64.80
1.7.4.3 Perfilado de Excavaciones m² - - - 20.00 26.00 20.00 26.00 20.00 26.00 - 20.00 26.00
1.7.4.4 Eliminacion desmonte D=50 m manual m³ - - - 7.80 101.17 7.80 101.17 7.80 101.17 - 7.80 101.17
1.7.4.5 Eliminacion desmonte hasta 14 km de distancia m³ - - - 7.80 110.53 7.80 110.53 7.80 110.53 - 7.80 110.53
1.7.4.6 Solado E=0.10 cm; Mezcla 1:12 m² - - - 4.00 139.36 4.00 139.36 4.00 139.36 - 4.00 139.36
1.7.4.7 Concreto F´C=210 kg/cm2 m³ - - - 4.20 1,833.51 4.20 1,833.51 4.20 1,833.51 - 4.20 1,833.51
1.7.4.8 Enconfrado y Desencofrado en paredes de buzon m² - - - 24.00 139.44 24.00 139.44 24.00 139.44 - 24.00 139.44
1.7.4.9 Acero F'Y=4200 kg/cm2 kg - - - 249.31 1,618.02 249.31 1,618.02 249.31 1,618.02 - 249.31 1,618.02
1.7.4.10 Tarrajeo Interior de buzon con impermeabilizante C:A + ADITIVO m² - - - 24.00 916.56 24.00 916.56 24.00 916.56 - 24.00 916.56
1.7.4.11 Tapa F°F° para buzon D=0.60 m und - - - 4.00 1,797.12 4.00 1,797.12 4.00 1,797.12 - 4.00 1,797.12
1.7.4.12 Curado de estructura de concreto m² - - - 24.00 12.72 24.00 12.72 24.00 12.72 - 24.00 12.72
1.8 REPOSICION DE REDES MATRICES DE AGUA Y DESAGUE 26,821.80 55,860.40 - 55,860.39 - 55,860.39 - 10,365.36 - - 66,225.74
1.8.1 REPOSICION DE SISTEMA DE AGUA POTABLE 23,864.55 30,166.05 - 30,166.04 - 30,166.04 7,417.08 - - 37,583.12
1.8.1.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 223.24 1.21 270.12 223.24 270.12 223.24 270.12 223.24 270.12 223.24 270.12
1.8.1.2 EXCAVACION DE ZANJAS PARA AGUA POTABLE m³ 221.95 21.62 4,798.56 221.95 4,798.56 221.95 4,798.56 221.95 4,798.56 6,716.21 6,716.21 221.95 11,514.77
1.8.1.3 PERFILADO Y COMPACTADO CON PLANCHA VIBRATORIO m² 223.24 5.26 1,174.24 223.24 1,174.24 223.24 1,174.24 223.24 1,174.24 223.24 1,174.24
1.8.1.4 RELLENO Y COMPACTADO CON MATERIAL PROPIO m³ 132.65 21.77 2,887.79 132.65 2,887.79 132.65 2,887.79 132.65 2,887.79 132.65 2,887.79
1.8.1.5 CAMA DE ARENA PARA APOYO DE TUBERIA m 372.07 10.89 4,051.84 372.07 4,051.84 372.07 4,051.84 372.07 4,051.84 372.07 4,051.84
1.8.1.6 SUMINISTRO Y COLOCACION DE TUBERIA PVC UF USO 4422, D=63MM m 361.27 9.87 3,565.73 361.27 3,565.73 361.27 3,565.73 361.27 3,565.73 700.87 700.87 361.27 4,266.60
1.8.1.7 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA ZANJA TAPADA m 361.27 4.13 1,492.05 361.27 1,492.05 361.27 1,492.05 361.27 1,492.05 361.27 1,492.05
1.8.1.8 ZARANDEO DE MATERIAL PROPIO PARA RELLENO m³ 66.97 21.04 1,409.05 66.97 1,409.05 66.97 1,409.05 66.97 1,409.05 66.97 1,409.05
1.8.1.9 RECONEXION DOMICILIARIA DE AGUA und 6.00 218.15 1,308.90 - - -
1.8.1.10 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 172.07 16.89 2,906.26 172.07 2,906.26 172.07 2,906.26 172.07 2,906.26 172.07 2,906.26
1.8.1.11 Instalaciones Domiciliarias de Agua Ø 1/2" und - - - 34.00 5,816.04 34.00 5,816.04 34.00 5,816.04 - 34.00 5,816.04
1.8.1.12 Instalación Valvula Compuerta Hierro ductil Ø 63 mm und - - - 4.00 1,794.36 4.00 1,794.36 4.00 1,794.36 - 4.00 1,794.36
1.8.2 REPOSICION DE SISTEMA DE DESAGUE 2,957.25 25,694.35 - 25,694.35 - 25,694.35 - 2,948.28 - 28,642.63
1.8.2.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 20.88 1.21 25.26 95.12 115.10 95.12 115.10 95.12 115.10 - 95.12 115.10
1.8.2.2 EXCAVACION DE ZANJAS PARA DESAGUE m³ 16.70 21.62 361.05 90.94 1,966.12 90.94 1,966.12 90.94 1,966.12 - 2,948.28 2,948.28 90.94 4,914.40
1.8.2.3 PERFILADO Y COMPACTADO CON PLANCHA VIBRATORIO m³ 20.88 5.26 109.83 95.12 500.33 95.12 500.33 95.12 500.33 - 95.12 500.33
1.8.2.4 SUMINISTRO Y COLOCACION DE TUBERIA PVC-U UF PARA DESAGUE NTP 4435, D=160MM S-20 m 26.10 80.11 2,090.87 26.10 2,090.87 26.10 2,090.87 26.10 2,090.87 26.10 2,090.87
1.8.2.5 ZARANDEO DE MATERIAL PROPIO DE RELLENO m³ 14.62 21.04 307.60 14.62 307.60 14.62 307.60 14.62 307.60 14.62 307.60
1.8.2.6 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 2.71 23.11 62.63 2.71 62.63 2.71 62.63 2.71 62.63 2.71 62.63
1.8.2.7 Suministro y Colocacion de Tuberia PVC - U UF para Desagüe NTP 4435, D= 200 mm m - - - 91.00 3,242.33 91.00 3,242.33 91.00 3,242.33 - 91.00 3,242.33
1.8.2.8 Instalaciones Domiciliarias Desagüe Ø 160 mm und - - - 29.00 10,752.04 29.00 10,752.04 29.00 10,752.04 - 29.00 10,752.04
1.8.2.9 Relleno y Compactado con material propio m³ - - - 159.00 6,657.33 159.00 6,657.33 159.00 6,657.33 - 159.00 6,657.33
1.9 SEÑALIZACION 2,548.91 20,734.45 - 20,734.45 - 20,734.45 - - - - 20,734.45
1.9.1 DEMARCACION DE PAVIMENTO m² 54.19 3.61 195.63 - - - -
1.9.2 DEMARCACION DE CRUCE DE VIA und 8.00 34.85 278.80 8.00 278.80 8.00 278.80 8.00 278.80 8.00 278.80
PRESUPUESTO COMPARATIVO
PRESUPUESTO MODIFICADO POR ADICIONALES DE OBRA POR MAYORES METRADOS, PARTIDAS NUEVAS Y DEDUCTIVOS DEL PROYECTO: "CREACION DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE BOLOGNESI DEL CC.PP. URBANO DE LIVITACA - DITRTITO DE LIVITACA - CHUMBIVILCAS - CUSCO"

PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO POR MAYOR PRESUPUESTO MODIFICADO
PRESUPUESTO PROGRAMADO PRESUPUESTO POR BAJO RENDIMIENTO PRESUPUESTO POR DEDUCTIVOS
ITEM DESCRIPCION DE PARTIDA UND 01 02 03 METRADO SOLICITADO N° 04
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/.
1.9.3 DEMARCACION DE SARDINELES m 361.27 4.24 1,531.78 722.54 3,063.57 722.54 3,063.57 722.54 3,063.57 722.54 3,063.57
1.9.4 TACHAS REFLECTIVAS und 30.00 18.09 542.70 315.00 5,698.35 315.00 5,698.35 315.00 5,698.35 315.00 5,698.35
1.9.5 Letrero Informativo de calles und - - - 5.00 1,485.55 5.00 1,485.55 5.00 1,485.55 - 5.00 1,485.55
1.9.6 Señales de prohibición und - - - 3.00 951.33 3.00 951.33 3.00 951.33 - 3.00 951.33
1.9.7 Señales preventivas und - - - 3.00 951.33 3.00 951.33 3.00 951.33 - 3.00 951.33
1.9.8 Demarcacion sobre el pavimento m - - - 136.00 8,305.52 136.00 8,305.52 136.00 8,305.52 - 136.00 8,305.52
1.1 PRUEBAS DE CONTROL DE CALIDAD 2,376.80 2,376.80 - 6,816.80 - 6,816.80 - - - 6,816.80
1.10.1 DISEÑO DE MEZCLA DE CONCRETO gbl 2.00 287.00 574.00 2.00 574.00 2.00 574.00 2.00 574.00 - 2.00 574.00
1.10.2 PRUEBA DE RESISTENCIA DE CONCRETO und 42.00 30.00 1,260.00 42.00 1,260.00 72.00 2,160.00 72.00 2,160.00 - 72.00 2,160.00
1.10.3 PRUEBA DE DENSIDAD und 16.00 28.30 452.80 16.00 452.80 16.00 452.80 16.00 452.80 16.00 452.80
1.10.4 ENSAYO DE PROCTOR MODIFICADO und 1.00 90.00 90.00 1.00 90.00 1.00 90.00 1.00 90.00 1.00 90.00
1.10.5 Estudio de mecanica de suelos con fines de diseño de muro de contencion und - - - 1.00 3,540.00 1.00 3,540.00 - 1.00 3,540.00
1.11 MITIGACION DE IMPACTO AMBIENTAL 30,770.61 30,770.61 30,770.62 30,770.62 - 30,770.61
1.11.1 INSTALACION DE MODULOS DE SS.HH und 3.00 871.39 2,614.17 3.00 2,614.17 3.00 2,614.17 3.00 2,614.17 3.00 2,614.17
1.11.2 RIEGO PERMANENTE DE OBRA m² 13,005.72 0.90 11,705.15 13,005.72 11,705.15 13,005.72 11,705.15 13,005.72 11,705.15 13,005.72 11,705.15
1.11.3 LIMPIEZA FINAL DE OBRA m² 3,143.05 0.52 1,634.39 3,143.05 1,634.39 3,143.05 1,634.39 3,143.05 1,634.39 3,143.05 1,634.39
1.11.4 MONITOREO AMBIENTAL mes 3.00 850.00 2,550.00 3.00 2,550.00 3.00 2,550.00 3.00 2,550.00 3.00 2,550.00
1.11.5 REPOSICION DE AREAS DESTINADAS AL CAMPAMENTO m² 600.00 2.06 1,236.00 600.00 1,236.00 600.00 1,236.00 600.00 1,236.00 600.00 1,236.00
1.11.6 TRATAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m² 600.00 3.22 1,932.00 600.00 1,932.00 600.00 1,932.00 600.00 1,932.00 600.00 1,932.00
1.11.7 REPOSICION DE COBERTURA VEGETAL EN DEPOSITOS DE MATERIAL EXCEDENTE m² 600.00 8.89 5,334.00 600.00 5,334.00 600.00 5,334.00 600.00 5,334.00 600.00 5,334.00
1.11.8 CONTENEDORES PARA RESIDUOS RECICLABLES und 10.00 90.00 900.00 10.00 900.00 10.00 900.00 10.00 900.00 10.00 900.00
1.11.9 ALMACENAJE PARA COMBUSTIBLE gbl 1.00 1,364.91 1,364.91 1.00 1,364.91 1.00 1,364.91 1.00 1,364.91 1.00 1,364.91
1.11.10 DESMONTAJE DE INSTALACIONES PROVISIONALES gbl 1.00 1,500.00 1,500.00 1.00 1,500.00 1.00 1,500.00 1.00 1,500.00 1.00 1,500.00
2 COMPONENTE 02: INFRAESTRUCTURA PEATONAL 131,424.90 159,425.03 293,370.04 293,370.04 - 55,218.35 - 348,588.40
2.1 SARDINELES 38,628.94 38,628.94 38,628.94 38,628.94 4,765.51 - 43,394.44
2.1.1 TRAZO, NIVEL Y REPLANTEO EN SARDINELES m 699.64 0.71 496.74 699.64 496.74 699.64 496.74 699.64 496.74 699.64 496.74
2.1.2 EXCAVACION DE ZANJA PARA SARDINELES m³ 47.23 25.94 1,225.15 47.23 1,225.15 47.23 1,225.15 47.23 1,225.15 47.23 1,225.15
2.1.3 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 61.39 23.11 1,418.72 61.39 1,418.72 61.39 1,418.72 61.39 1,418.72 61.39 1,418.72
2.1.4 ENCOFRADO Y DESENCOFRADO DE SARDINELES DE CONCRETO m² 559.71 26.12 14,619.63 559.71 14,619.63 559.71 14,619.63 559.71 14,619.63 559.71 14,619.63
2.1.5 CONCRETO FC=175 KG/CM2 PARA SARDINELES m³ 47.23 431.70 20,389.19 47.23 20,389.19 47.23 20,389.19 47.23 20,389.19 4,765.51 4,765.51 47.23 25,154.70
2.1.6 CURADO DE CONCRETO EN SARDINELES m 699.64 0.28 195.90 699.64 195.90 699.64 195.90 699.64 195.90 699.64 195.90
2.1.7 SELLADO DE JUNTAS EN SARDINELES m 35.10 8.08 283.61 35.10 283.61 35.10 283.61 35.10 283.61 35.10 283.61
2.2 VEREDAS 92,795.96 106,894.40 117,174.78 117,174.78 - 33,285.16 - 150,459.94
2.2.1 TRAZO, NIVEL Y REPLANTEO EN VEREDAS m² 833.77 1.02 850.45 833.77 850.45 833.77 850.45 833.77 850.45 833.77 850.45
2.2.2 CORTE DE TERRENO MANUAL HASTA 0.15 m DE ESPESOR m³ 125.07 25.94 3,244.32 233.07 6,045.84 233.07 6,045.84 233.07 6,045.84 - 2,016.05 2,016.05 233.07 8,061.89
2.2.3 PERFILADO Y COMPACTADO m² 833.77 5.26 4,385.63 833.77 4,385.63 833.77 4,385.63 833.77 4,385.63 833.77 4,385.63
2.2.4 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m³ 162.59 16.92 2,751.02 302.99 5,126.59 302.99 5,126.59 302.99 5,126.59 - 302.99 5,126.59
2.2.5 EMPEDRADO DE E=6" m² 833.77 20.38 16,992.23 833.77 16,992.23 833.77 16,992.23 833.77 16,992.23 11,956.26 11,956.26 833.77 28,948.49
2.2.6 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 277.92 32.47 9,024.06 277.92 9,024.06 277.92 9,024.06 277.92 9,024.06 3,696.34 3,696.34 277.92 12,720.40
2.2.7 CONCRETO FC=175/CM2 VEREDAS E=7.5CM NO INCL. SARDINELES m² 833.77 46.49 38,761.97 833.77 38,761.97 833.77 38,761.97 833.77 38,761.97 15,616.51 15,616.51 833.77 54,378.48
2.2.8 SELLADO DE JUNTAS EN VEREDAS m 282.00 3.99 1,125.18 282.00 1,125.18 282.00 1,125.18 282.00 1,125.18 282.00 1,125.18
2.2.9 BRUÑADO DE VEREDAS m 1,258.81 1.89 2,379.15 1,258.81 2,379.15 1,258.81 2,379.15 1,258.81 2,379.15 1,258.81 2,379.15
2.2.10 FROTACHADO DE VEREDAS m² 833.77 15.40 12,840.06 833.77 12,840.06 833.77 12,840.06 833.77 12,840.06 833.77 12,840.06
2.2.11 CURADO DE CONCRETO EN VEREDAS m² 833.77 0.53 441.90 833.77 441.90 833.77 441.90 833.77 441.90 833.77 441.90
2.2.12 Mejoramiento con material clasificado veredas m² - - - 833.77 8,921.34 833.77 8,921.34 833.77 8,921.34 - 833.77 8,921.34
2.2.13 Mejoramiento con material clasificado veredas 2da capa m2 - - - - - 833.77 10,280.38 833.77 10,280.38 - 833.77 10,280.38
2.3 MURO DE CONCRETO CICLOPEO 13,901.69 - 120,312.88 - 120,312.88 17,167.68 - 137,480.57
2.3.1 Trazo,niveles y replanteo durante el proceso m² - - - 40.00 21.20 162.40 86.07 162.40 86.07 - 162.40 86.07
2.3.2 Excavación Manual m³ - - - 35.22 761.46 402.42 8,700.32 402.42 8,700.32 - 402.42 8,700.32
2.3.3 Nivelacion y compactado manual m² - - - 58.70 507.17 181.10 1,564.70 181.10 1,564.70 - 181.10 1,564.70
2.3.4 Encofrado y Desencofrado m² - - - 121.56 1,993.58 866.72 14,214.21 866.72 14,214.21 6,387.72 6,387.72 866.72 20,601.93
2.3.5 Concreto ciclopeo F'c=175 kg/cm + 50% PG m³ - - - 30.00 9,773.40 197.28 64,269.88 197.28 64,269.88 8,295.62 8,295.62 197.28 72,565.50
2.3.6 Relleno y compactado con material seleccionado m³ - - - 12.00 644.52 185.26 9,950.31 185.26 9,950.31 2,484.34 2,484.34 185.26 12,434.65
2.3.7 Colocacion de tuberia PVC SAP de 2" m - - - 7.00 87.15 165.69 2,062.84 165.69 2,062.84 - 165.69 2,062.84
2.3.8 Juntas de Contraccion con teknoport E=1" m² - - - 5.36 48.78 15.65 142.42 15.65 142.42 - 15.65 142.42
2.3.9 Curado de Concreto m² - - - 121.56 64.43 581.92 308.42 581.92 308.42 - 581.92 308.42
2.3.10 Eliminacion desmonte hasta 14 km de distancia m3 - - - 477.36 6,764.19 477.36 6,764.19 - 477.36 6,764.19
2.3.11 Relleno con material granular tam max 2" m3 - - - 66.64 9,229.64 66.64 9,229.64 - 66.64 9,229.64
2.3.12 Suministro y colocado de tuberia perforada de 160 mm m - - - 68.00 3,019.88 68.00 3,019.88 - 68.00 3,019.88
2.4 BARANDA METALICA 17,253.44 17,253.44 - - 17,253.45
2.4.1 Trazo, niveles y replanteo durante el proceso m2 - - - 28.80 15.26 28.80 15.26 - 28.80 15.26
2.4.2 Barandas Metalicas (Según Diseño) m - - - 96.00 14,400.00 96.00 14,400.00 - 96.00 14,400.00
2.4.3 Concreto f'c=175 kg/cm2 m3 - - - 2.30 918.18 2.30 918.18 - 2.30 918.18
2.4.4 Pintado de Barandas Metalicas m - - - 96.00 1,920.00 96.00 1,920.00 - 96.00 1,920.00
PRESUPUESTO COMPARATIVO
PRESUPUESTO MODIFICADO POR ADICIONALES DE OBRA POR MAYORES METRADOS, PARTIDAS NUEVAS Y DEDUCTIVOS DEL PROYECTO: "CREACION DEL SERVICIO DE TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA CALLE BOLOGNESI DEL CC.PP. URBANO DE LIVITACA - DITRTITO DE LIVITACA - CHUMBIVILCAS - CUSCO"

PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO MODIFICADO APROBADO N° PRESUPUESTO POR MAYOR PRESUPUESTO MODIFICADO
PRESUPUESTO PROGRAMADO PRESUPUESTO POR BAJO RENDIMIENTO PRESUPUESTO POR DEDUCTIVOS
ITEM DESCRIPCION DE PARTIDA UND 01 02 03 METRADO SOLICITADO N° 04
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado Parcial S/.
3 COMPONENTE O3:AREAS VERDES Y VARIOS 18,362.70 18,362.70 40,862.70 58,658.70 - - 58,658.70
3.1 AREAS VERDES 13,198.46 13,198.46 13,198.46 13,198.46 - 13,198.46
3.1.1 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m² 422.83 1.21 511.62 422.83 511.62 422.83 511.62 422.83 511.62 422.83 511.62
3.1.2 PERFILADO DE AREAS VERDES m² 422.83 6.49 2,744.17 422.83 2,744.17 422.83 2,744.17 422.83 2,744.17 422.83 2,744.17
3.1.3 SUMINISTRO Y COLOCADO DE CHAMPAS m² 422.83 22.18 9,378.37 422.83 9,378.37 422.83 9,378.37 422.83 9,378.37 422.83 9,378.37
3.1.4 SUMINISTRO Y COLOCADO DE PLANTAS ORNAMENTALES und 66.00 8.55 564.30 66.00 564.30 66.00 564.30 66.00 564.30 66.00 564.30
3.2 VARIOS 5,164.24 5,164.24 - 27,664.24 - 45,460.24 - - 45,460.24
3.2.1 SUMINISTRO Y COLOCADO DE BASURERO BASCULANTE und 5.00 387.27 1,936.35 5.00 1,936.35 5.00 1,936.35 5.00 1,936.35 5.00 1,936.35
3.2.2 SUMINISTRO Y COLOCADO DE SEÑALES DE TRANSITO und 13.00 179.91 2,338.83 13.00 2,338.83 13.00 2,338.83 13.00 2,338.83 13.00 2,338.83
3.2.3 PLACA RECORDATORIA und 1.00 889.06 889.06 1.00 889.06 1.00 889.06 1.00 889.06 1.00 889.06
3.2.4 Elaboracion de Plan de Monitoreo Arqueologico und - - - 1.00 13,000.00 1.00 13,000.00 - 1.00 13,000.00
3.2.5 Elaboracion de Exoediente para la Ejecucion de un PONTON KM 00+000 und - - - 1.00 9,500.00 1.00 9,500.00 - 1.00 9,500.00
3.2.6 VIGILANCIA, PREVENCION Y CONTROL DE COVID - 19 EN EL TRABAJO 17,796.00 - 17,796.00
3.2.6.1 Equipos de protección colectiva contra el COVID - 19 glb 1.00 11,684.00 1.00 11,684.00
3.2.6.2 Equipos de protección personal contra el COVID - 19 glb 1.00 6,112.00 1.00 6,112.00

COSTO DIRECTO S/ 780,700.85 S/ 868,026.68 S/ 1,033,575.50 S/ 1,051,371.50 S/ - S/ 110,474.76 S/ - S/ 1,161,846.22

DESCRIPCION % S/. % S/. % C.I. % C.I. % ADICIONAL C.I. % C.I.


GASTOS GENERALES 9.95% S/. 77,644.30 13.45% S/. 116,724.30 16.29% S/. 168,420.80 17.12% S/. 179,961.80 6.65% 62,481.47 20.87% S/. 242,443.27
COSTO
GASTOS DE INSPECCION 4.10% S/. 32,003.26 5.18% S/. 45,003.26 7.31% S/. 75,598.26 7.23% S/. 75,982.26 2.07% 19,500.00 8.22% S/. 95,482.26
INDIRECTO
GASTOS DE EXPEDIENTE TECNICO 4.74% S/. 37,000.00 4.26% S/. 37,000.00 3.58% S/. 37,000.00 3.52% S/. 37,000.00 - 3.18% S/. 37,000.00
GASTOS DE LIQUIDACION 1.61% S/. 12,590.57 1.45% S/. 12,590.57 1.22% S/. 12,590.57 1.20% S/. 12,590.57 - 1.08% S/. 12,590.57

COSTO TOTAL S/. 939,938.99 S/. 1,079,344.82 S/. 1,327,185.13 S/. 1,356,906.13 S/. 1,549,362.32
INCREMENTO DEL EXPEDIENTE MODIFICADO CON REFERENCIA AL EXPEDIENTE TECNICO S/. 470,017.49
INCREMENTO DEL EXPEDIENTE MODIFICADO CON REFERENCIA AL EXPEDIENTE TECNICO % 50.01%