Sei sulla pagina 1di 4

CLIENT:

GOVERNMENT OF ODISHA NATIONAL HIGHWAYS

AUTHORITY ENGINEER:

CONTRACTOR: RAJLAXMI CONSTRUCTIONS LIMITED

PROOF CONSULTANT: D.K. CONSULTANTS

PROJECT TITLE:

Widening to Double lane with Paved Shoulder from Km. 0.000 to Km. 41.055
(Chandili to Boriguma) of NH-63.

TITLE OF CALCULATIONS: DESIGN OF DRAIN

Rev.: R0
DOCUMENT/FILE NO: NH-63/DES/CAL/DRAIN-01 No. of Sheets: 3
Date:21/07/2017

FOR APPROVAL
OF AUTHORITY
ENGINEER
FOR APPROVAL OF FOR APPROVAL OF PROOF
DESIGN DIRECTOR CONSULTANT
DESIGN OF DRAIN
DESIGN OF UTILITY CHAMBER FOR 0.30m HEIGHT ABOVE GL

1.0 Dimesnions of Chamber wall

Total height of Chamber wall = 0.600 m (Considering the 0.8m height)


Height of Chamber wall above GL = 0.300 m
Height of Chamber wall below GL = 0.300 m
Proj. of Chamber wall above top of retained soil = 0.000 m

Stem Top thickness = 0.100 m


Stem Bottom thickness = 0.100 m

Base length = 1.100 m


Depth of root of heel cantilever = 0.100 m

2.0 Soil Parameters c (For Coulumbs theory)

o
Angle of Internal Friction of Backfill Soil   30.00
Cohesion c = 0.00 t/m^2

o
Angle of Wall friction   20.00
o
Batter of Stem wall with horizontal   90.00
o
Inclination of Backfill with horizontal   0.00

Equiv. Ht. of backfill for Live load surcharge heq = 1.200 m (On heel side)
Equiv. Ht. of backfill for Live load surcharge htoe = 0.000 m (Toe side)
Coeff. of Friction between soil & concrete   0.500 tan 

Height of water above founding level  0.300 m

Allowable Bearing Capacity   100.00 KN/m^2

3.0 Material Properties:


Grade Permissible Stress (MPa)
Concrete = M20 6.67
Steel = Fe500 240.00

Unit weight of Concrete (Dry) c (dry) = 25.00 KN/m^3


Unit weight of Concrete (Submerged) c (sub) = 25.00 KN/m^3
Unit Weight of Soil (Dry) s (dry) = 20.00 KN/m^3
Unit Weight of Water w = 10.00 KN/m^3

Design Costants:
m = 10 ; k = 0.217 ; j = 0.928 ; Q Normal = 0.672
Q Seismic = 1.008
Clear Cover to reinforcement of Footing & Earth Faces of Stem = 50 mm
Clear Cover to reinforcement on other faces of Stem = 50 mm

Widening to Double lane with Paved Shoulder from Km. 0.000 to Km. 41.055 (Chandili to Boriguma) of NH-63
Page # 1 - 1 of 3.
DESIGN OF DRAIN
4.0 Design of Components:

4.1 Design of Stem:

1.2 At base:

Net height of fill on the heel = = 0.50 m

Moment due to Surcharge = (Ka x  x he) x H x (H/2) = 0.84 KNm


Moment due to Soil = 0.5 x (Ka x  x H) x H x (0.42xH) = 0.15 KNm

Total Moment = 0.84 + 0.15 = 0.99 KNm

Effective depth required d req = (M / (Q x b))^0.5 = 39 mm


Effective depth provided d prov = 100 - 50 - 4 = 46 mm
> 39 OK
Main (Vertical) Reinforcement:
Area of steel required Ast = M / (st x j x d) = 97 mm^2
Minimum area of steel req Ast = 0.12 x b x d = 120 mm^2

Provide 8mm + 0mm  bars @ 200mm c/c on earth face. Ast = 252 mm^2 > 120
Provide 10mm + 0mm  bars @ 200mm c/c on other face. Ast = 393 mm^2 > 60

Distribution (Horizontal) Reinforcement:


Area of steel req. on each face Ast = 0.06 x b x d = 60 mm^2
Provide 8mm + 0mm  bars @ 200mm c/c on each face. Ast = 252 mm^2 > 60

4.1 Design of base slab:

As no vertical load is coming on the median wall, considering the same effect as base of wall at the face of bottome slab.

Hence same section and reinforcement will be provided at bottom slab.

Widening to Double lane with Paved Shoulder from Km. 0.000 to Km. 41.055 (Chandili to Boriguma) of NH-63
Page # 2 - 2 of 3.
DESIGN OF DRAIN

DESIGN OF DECK SLAB
1.1  DATA INPUT
SR NO DESCRIPTION UNIT VALUE m = 10
1 Out to out distance m 1.50 k = 0.294
2 Thickness of deck slab m 0.125 j = 0.902
Q = 1.330
Density of concrete t/m3 2.5
Grage of concrete MPa 30
Permissible stress in steel(σst) Mpa 240 (IRC‐21:2000,cl 303.2)
Permissible stress in concrete( σcbc) Mpa 10.00 (IRC‐21:2000,cl 303.1)
0.125
All dimensions are in m.

1.2  LOAD CALCULATIONS

1) Dead load calculation

Self wt. of deck slab = 0.31 t/m2 =   0.125*2.4


Total load = 0.3125 t/m2
2) Live load calculation

Load intensity = 0.50 t/m2


Total load = 0.5000 t/m2

1.3  DESIGN OF SLAB
Final Design  moment from Staad Analysis :

Span moments = 0.23 t.m

d reqd at Span = SQRT((0.228515625*10000000)/(1.33*1000))
= 101.45 mm <   125    Hence O.K.

Ast reqd at Span = ((0.228515625*10000000)/(240*0.902*75))
= 140.75 mm2

1.4  SUMMARY
Moments  Ast reqd  Area of  Ast prov 
Sr. No. Type Dia acing (In m
(In t.m) (In mm2) steel (In mm2)
1 Mid span slab
a)Span moments 0.23 140.75 12 150 753.98 753.98 O.K.

Widening to Double lane with Paved Shoulder from Km. 0.000 to Km. 41.055 (Chandili to Boriguma) of NH-63 - 3 of 3.