Sei sulla pagina 1di 2

Format No.

Checklist for Piping GA drawing APIL-NCR-PPP-CHKL-012

June 2008

Contract / Project Name


Contract / Project No.
Boiler Type
Drawing Nos.

Sl. Checkpoints Status (Tick Remarks


No. if Confirmed)
1 Is title block as per Work Instruction BKE 7301
EMC01/ 6.3?
2 Is revision block Work Instruction BKE 7301
EMC01/ 6.5?
3 Is key plan complete and relevant area hatched?
4 Are details of continuation drawings shown?
5 Is it in line with the Work Instruction BKE 7301
EMC01/ 6.1?
6 Is Drawing name in accordance with Work
Instruction BKE 7301 EMC01/ 6.3.1?
7 Is drawing scale agreed with customer/project
team, implemented?
8 Is drawing size A0/A02?
9 Is view shown, correspond to general
arrangement, plant layout drawings?
10 If drawing generated from 3D-Model,are
dimensional details sufficient?
11 Are legends (area, equipment kks, etc) elaborated
in right hand side of drawing?
12 Are floor level ,room numbering details shown ?
13 Is drawing paper space utilised as much as
possible with sufficient legibility and clarity?
14 Is drawing purpose (tender, erection, etc) met?
15 Is plant north shown and oriented properly?
16 Are reference files detached except border file
before putting in PDME?
17 Has Vector Hidden Line (VHL) been run?
18 Are pipe centerlines type dashdot?
19 Are any PARCH sections used, complete
20 Is Pipe KKS labeling viz. Number, centerline
elevation, insulation thickness complete
21 Is pipe support, component labeling sufficient?
22 Is valve labeling sufficient?
23 Are main building axes shown and dimensioned?
24 Is equipment/component dimensioning relative
to building axes shown?
25 Are pipe terminal points dimensions w.r.to
grid/building axis shown?
26 Is equipment lay down area viz. Tube bundle
removal, pump components etc shown?
27 Is pipe insulation shown in selected areas?

Checked by Approved by Date: Sh. 1 of 2


Signature : Signature :

Name : Name :
Format No. :

Checklist for Piping GA drawing APIL-NCR-PPP-CHKL-012

June 2008

28 Are all disciplines viz. Cable trays, equipment


(including tanks, vessels, heat exchangers,
pumps, cranes etc),civil structures, platforms,
HVAC ducts identified?
29 Are platform gratings shown and elevation
marked?
30 Are ground /floor elevations indicated in
sections?
31 Are sectional views identified and correspond to
sectional views in UE drawings?
32 Are notes (viz. building level, ground level, etc)
complete and sufficient ?
33 Are drafting contents like dimension text, grid
lines, grid number, grid circle, area legends, etc.
are as per the Work Instruction BKE 7301
EMC01?
34 Upstream/down stream distances of
valves/components etc.
35 Language specific issues (eg. in Deutsch,
Spanish etc.)

Checked by Approved by Date: Sh. 2 of 2


Signature : Signature :

Name : Name :

Potrebbero piacerti anche