Project Charter
2
1.4 Scope Statement:
The Kasana dam project will include the design layout of the dam, civil works, Electrical
works, Mechanical works and delivery of the finished structure to CAA Pakistan. All personnel,
mechanical, hardware, and software resources will be managed by the project team. All project
work will be independent. All project funding will be managed by the project manager up to and
including the allocated amounts in this document. Any additional funding requires approval from
the project sponsor. This project will conclude when the final report of water supply to the
Airport in terms of MGPD is submitted after the monsoon season of 2018.
3
1.7.1 Project Success Criteria:
The project will be considered successful if the Kasana dam is able to provide 2 MGPD
after 2 years of completion and 6 MGPD after 5 years.
This project must meet the following list of requirements in order to achieve success.
The construction works should be completed within the operational year of Airport
Solution must be implemented without disruption to Airport operations
1.8 Constraints:
The following constraints pertain to the Kasana Dam project:
All material must meet current building criteria
All the labor must use PPE (personal protective equipment) while working on site
All hardware and software must be purchased in accordance with the allocated budget
and timeline
1.9 Assumptions:
The following are a list of assumptions. Upon agreement and signature of this document,
all parties acknowledge that these assumptions are true and correct:
This project has the full support of the project sponsor, stakeholders, and all departments
The purpose of this project will be communicated throughout the company
The HR manager will provide additional resources if necessary
Land acquisition for the Dam will be done by CAA
4
RISK MANAGEMENT PLAN
2.1 Introduction:
The purpose of this risk management plan is to act as a guideline whenever there is a risk
in the project. This plan will tell us how to mitigate or enhance the effect of the risk. Who will be
responsible and accountable if a specific risk occurs and who will be the owner of that risk. The
whole process of risk management from identification, evaluation, improvement, mitigation,
monitoring and controlling of any risk will be done under the light of this risk management plan.
This plan establishes a framework in which the project team will identify risks and
develop strategies to mitigate or avoid those risks. However, before risks can be identified and
managed, there are preliminary project elements which must be completed. These elements are
outlined in the risk management approach.
5
Risk managers will provide status updates on their assigned risks in the bi-weekly project team
meetings, but only when the meetings include their risk’s planned timeframe. Upon the
completion of the project, during the closing process, the project manager will analyze each risk
as well as the risk management process. Based on this analysis, the project manager will identify
any improvements that can be made to the risk management process for future projects. These
improvements will be captured as part of the lessons learned knowledge base.
Expert Interviews:
Multiple sessions of expert interviews will be scheduled for the risk identification related
to this project. The interviews will disclose many risks which might go unnoticed in risk
identification meetings.
6
chart, the recorder will capture the finished product and the project manager will move the
process on to the next step: risk mitigation/avoidance planning.
SERIOUSNESS
Very Low Low Medium High Very
High
Very R001
High
PROBA High
BILITY Medium R002,
OF
OCCUR R003
RENCE Low R004
Very
Low
Legend:
High Any risk which has a high probability of occurrence or has a potential to have
a high effect on the project is categorized in this box
Medium Any risk which has a 50-50 % of probability or has a medium effect on the
project is categorized in this box.
Low Any risk which has a very low probability of occurrence or a low effect on the
project is categorized in this box.
7
which fall in the current time period will be discussed. Risk monitoring will be a continuous
process throughout the life of this project. As risks approach on the project schedule the project
manager will ensure that the appropriate risk manager provides the necessary status updates
which include the risk status, identification of trigger conditions and the documentation of the
results of the risk response.
8
the status of their assigned risk at the bi-weekly project team meeting for their risk’s planned
timeframe. The Risk Register will be maintained as an appendix to this Risk Management Plan.