TI:409:656: REV : 00

TURBINE I & C
TEST & SETTING INSTRUCTIONS
DATE:30/08/2013
PROJECT: SINGARENI THERMAL POWER PROJECT
2x600MW
A4 - 11 PAGE 04 OF 12
CUBICLE : CJJ08

Description Engg. Test Commi- Mainte-


Dept. Dept. ssioning nance

2.0 TESTING OF LSR

Make connections as shown in


Scheme

Switch ON +24V supply to L.S.R


Set the PT input to 110V line to line
Set the CT input currents to 5A
(for LSR type 7UP2050/7UP2151)
by keeping S1 ON & S2 OFF

Measure voltage at pin Z12 of 5.0V


7TL46 w.r.t B2 ± 0.5V
(For 7UP21 measure at socket 7
on module 6DT5001)
(The voltage at above point is
also a function of p.f)

Connect a time interval counter


to measure the impulse at contactor
terminals.(See scheme for terminal
details)
Connect the 5A load in two parallel paths
controlled individually by the switches
S1 and S2.

Now, keeping S1 and S2 both on, adjust the


current so that voltage at Z12 of 7TL46 is
5.0 VDC.
keeping S1 off and S2 ON, adjust rheostat of
2nd set such that Z12 of TL46 is 1.0 VDC.
Repeat this, till with S1 & S2 both ON
Z12/7TL46 shows 5.0 VDC and with S1 OFF
Z12/7TL46 is 1.0VDC.
Keep both S1 &S2 ON.

Note: While adjusting the CT currents, care


is to be taken that each line current is
kept equal to each other.
The deviation in line currents
shall not exceed 10%
TI:409:656 REV : 00
TURBINE I & C
TEST & SETTING INSTRUCTIONS
DATE:30/08/2013
PROJECT: SINGARENI THERMAL POWER PROJECT
2x600MW
A4 - 11 PAGE 05 OF 12
CUBICLE : CJJ08

Description Engg. Test Commi- Mainte-


Dept. Dept. ssioning nance

2.1 SETTINGS ON L.S.R

GENERAL NOTE: Settings of LSR may


be modified to suit PROJECT require ment
for optimum operation at site.

i) Set the frequency on module 7TP1011 48.00Hz

ii) Set residual load PW/PN on module


7TL46 to 30%
Test pin on 5% OUT
10% OUT
20% IN

iii) Set power jump ∆ PW/PN on module


7TP16 to 50%
Test pin on 5% OUT
10% OUT
20% OUT
40% IN

2.2 Set interrogation time Tk (2 ∆ P)


On module 7TW41 to 2 seconds
0.25 OUT
0.50 OUT
1.00 OUT
2.00 IN
4.00 IN
8.00 IN

Make switch S1 OFF to simulate


the load throw off of 80% & notice the
LSR operation.
Measure voltage at Z12 of 7TL46 1.00 V
Impulse time measured with time 1.2 sec
interval meter ±0.07
sec
Note: Adjust pot R8 in module 7TW41
if the above timing is not observed.
TI:409:656: REV : 00
TURBINE I & C
TEST & SETTING INSTRUCTIONS
DATE:30/08/2013
PROJECT: SINGARENI THERMAL POWER
PROJECT
A4 - 11 PAGE 06 OF 12
2x600MW
CUBICLE : CJJ08

Description Engg. Test Commi- Mainte-


Dept. Dept. ssioning nance

2.3 Keep the switch S2 in OFF S1 in ON.


Measure voltage at pin Z12 of 5.00 V
7TL46(Adjust CT current as reqd.)
Operate switch S1 to OFF position ,which
is equal to 100% load throw off.
Measure voltage at pin Z12 of 7TL46 0.00 V
Impulse time measured with time 2.00sec
interval meter. ±0.12
(Load throw off 100%) sec

2.4 Set residual load PW/PN on module


7TL46 to 15%
(All test pins are IN)

Adjust the current setting rheostats such a


way that with both S1 & S2 ON, volt at
Z12/7TL46 is 5.0VDC and with S1 OFF
volt at Z12/7tl46 is 1.0 V.

Create a load throw of 80% ie. switch


OFF S1 from when both S1 & S2 ON.

Observe now that no impulse is issued


as the new residual load is (20%) higher
than minimum residual load set(15%)

2.5 Set frequency on module 7TP1011 51.00Hz


(7TD16)
Ensure that line frequency which
is feeding PT's is below this value
(Otherwise setting to be done to
line frequency +0.5 Hz)
tpx=19608
(1280-out,80-out,40-out,20-out, 10-out)
TURBINE I & C TI:409:656: REV : 00
TEST & SETTING INSTRUCTIONS
PROJECT: SINGARENI THERMAL POWER DATE:30/08/2013
PROJECT
A4 - 11 2x600MW PAGE 07 OF 12

CUBICLE : CJJ08

Description Engg. Test Commi- Mainte-


Dept. Dept. ssioning nance

2.6 Set residual load PW/PN on module


7TL46 to 30% with test pins
5% OUT
10% OUT
Check voltage at Z12 of 7TL46 with 5.00 V
switches S1&S2 in ON position.
Operate switch S1 to OFF position
and check voltage at Z12 of 7TL46 1.00 V

Observe that no impulse is issued


as frequency value is lower than
the set threshold frequency.

Set the frequency on 7TP1011(7TD16)


to 48.00 Hz.
tpx=20833,(2560-out,80-out,10-out)
2.7 Set residual load PW/PN to 50%
on 7TL46 with test pins on
5% OUT
10% OUT
20% OUT
Set power jump ∆ PW/PN to 70%
on 7TP16 with test pins on
5% OUT
10% OUT
40% OUT
Now adjust rheostats to get 5.0V on
Z12 /7TL46 with S1 & S2 ON.

When S1 OFF adjust for 3.0V at


Z12/7TL46. Make a load throw of
60% by switching OFF S1 when
S1 & S2 both ON.

Observe there is no impulse as the


power jump is less than the set
value ∆ PW/PN (70%).