SUMMARY
A. GENERAL REQUIREMENTS 1.00 lot
B. RETROFITTING WORKS 1.00 lot
B. CIVIL WORKS
1 Earthworks 0.41 cu.m
2 Chipping works 0.05 cu.m
3 Drilling works 56.00 sets
4 Restoration works 1.00 lot
5 Carpentry works 1.00 lot
₱2,046,559.67 ₱2,455,871.61
₱553,650.00 ₱664,380.00
₱1,492,909.67 ₱1,791,491.61
COST PER LN.M
CIVIL WORKS
Earthworks 0.45 0.45
Chipping 0.45 0.45
0.55 0.30
0.55 0.30
0.55 0.30
Drilling
Restoration
THICKNESS HEIGHT DIAMETERSPACING PERIMETER AREA
0.025 0.20
7.00
0.025
0.02 0.17
0.025 0.17
7.80
0.025
0.02 0.17
3.30
0.025
1
0.025
0.025
0.025
0.025
0.17 0.02
VOLUME WEIGHT # CUT BARS QTY Total