SITE PLAN SUNPATH INFERANCES

 SINCE MANIPAL
FACES HOT AND HUMID
CLIMATE,DEEP OVERHANGS
ARE SUGGESTED ON THE
EASTERN AND WESTERN
FACARDS TO AVOIDE
OVERHEATING.
 BUILDING IS SUGGESTED
TO BE ORIENTED TOWARDS NORTH
DIRECTION.
 PROPER LANDSCAPING,GREEN WALLS
WESTERN SUN AND BUFFER ZONES CAN HELP IN
CONTROLING THE HIGH INTENSITY OF
THE WESTERN SUN.
WINDROSE DIAGRAM  THE DIMENSIONS OF THE FENESTRATION
HAS TO BE DETERMINED THROUGH THE
 THE PROMINENT STERIOGRAPHIC SUNPATH DIAGRAM
WIND FLOW IN AND THE ALTITUDE OF THE SUN DURING
MANIPAL IS ALONG SUMMER AND WINTER SOLSTICE.
THE SOUTH WEST  OPEN VERANDHAS ON ALL SIDES PERMIT
SIDE. AN EVEN LARGE
 WIND OVERHANGS SO THAT THE
SPEED:19km\h(MAX) WALLS ARE ALMOST
ALWAYS IN DEEP SHADE.
 SINCE HUMIDITY IS
RELATIVELY HIGH AND
THE AIR IS SATURATED
WITH MOISTURE,CROSS
VENTILATION IS THE
BEST WAY TO MAINTAIN
OPTIMUM COMFORT LEVEL
PRECIPITATION AND AVERAGE IN BUILT SPACES.
HUMIDITY LEVEL TEMPRATURE  VERTICAL LOUVERS CAN BE
IMPLIMENTED ON THE SOUTH WEST
VEGETATION: TREES OF 3 – 5M ON EAST SIDE OF  MANIPAL WITNESSES AN FAÇADES TO CREATE VENTURE EFFECT
THE SITE(BOUNDARY) ANNUAL PRECIPITATION AND CAN ALSO FUNCTION AS A SHADING
RANGING FROM 500-560 DEVICE.
DRAINAGE: CAN BE CONNECTED TO THE MAIN CM A YEAR  THE ROOF WILL
 MANIPAL EXPERIENCES HAVE TO BE SLOPING
SEWER LINE ON THE EAST SIDE ROAD (9M WIDE MAX PRECIPITATION IN WITH SUFFICIENT
ROAD) THE MONTH OF JULY(240 OVERHANGS TO COMBAT
SOIL TYPE:LATERITE  ON AN AVERAGE JULY IS THE MOST CM) . THE HEAVY RAINS THAT
HUMID MONTH AND JANUARY IS THE  MAX TEMPRATURE:36 LASHES THE DISTRICT.
COMPRESSIVE STRENGTH-9.0N\MM.SQ LEAST HUMID MONTH. DGREES(APRIL)
WATER ABSORBTION RATE=14.95%  THE AVERAGE ANNUAL PERCENTAGE OF  MIN TEMPRATURE:21
HUMIDITY IS :77% DEGREES(JANUARY)
TOPOGRAPHY:FLAT
SUBMITTED BY:AARON DSOUZA
SITE ANALYSIS REG.NO:193701304 SHEET NO:1
SEMESTER :III, SECTION:A
VERTICAL LOUVERS ON
THE SOUTH WEST AND
WEST FACADE TO BYLAWS
CREATE VENTURE
EFFECT.

BUFFER ZONE

RAINWATER DRAIN FOR


THE COURTYARD

-VE AIR SHALLOW FOUNDATION CAN BE


WEST SUITABLE FOR LATERITE SOIL.

AIR
CROSS VENTILATION
SOUTH

VENTILATOR’S

SITE AREA: :5989.348SQ.M


SETBACKS:15% FOR THE FRONT AND RARE SIDE .
14% FOR THE SIDES.
OVERHANGS BUILDABLE AREA AFTER GIVING SETBACKS:3136sq.m
SHADING THE FAR AS PER THE BYLAWS:2.5
INSTALLATION OF WALL. TOTAL PERMISABLE BUILT UP AREA:1600sq.m.
SOLAR PANELS AT
THE WEST
VARANDA

SUBMITTED BY:AARON DSOUZA


SITE ANALYSIS REG.NO:193701304 SHEET NO: 2
SEMESTER :III, SECTION:A
ACCESSIBILITY TRAFFIC INFERANCE
 SINCE THERE IS A CONSTANT
VEHICULAR MOVEMENT
HAPPENING ON THE
C2 1
2 PROPOSED EASTERN ROAD, LOT OF
C1 SITE VEHICUR NOISE IS CREATED ,HENCE
3
3 MOVEME
-NTS
CLASSROOMS AND OTHER
PROPOSED
SITE
10 ACTIVITY SPACES FOR THE
1 6
5 KIDS ARE SUGGESTED TO BE
7
2
4 PLACED ON THE
6
SOUTHWEST OR THE
7 8
WESTERN SIDE OF THE PLOT
5
,ENSURING ADEQUATE
4
ACOUSTIC MEASURES FOR
EACH CLASSROOM.
 SIGNAGES REGARDING THE
SPEED LIMIT AND SPEED
C1
M.VISVESVARAYA ROAD(9M)-EAST
RADIUS:530m
ROAD CONNECTING MANIPAL-HEBRI ROAD AND BREAKERS MUST BE
M VISVESVARAYA ROAD- SOUTH-WEST 1.BEST SELLERS APPARELS PVT. LTD.
2.MANIPAL SCHOOL OF COMMUNICATION
PROVIDED CLOSE TO THE
6M WIDE SHORTCUT ROAD CONNECTING
THE ABOVE TWO ROADS-SOUTH 3.MANIPAL INSTITUTE OF TECHNOLOGY ENTERANCE GATE.
4.NEW TIWARI CHAT PROPOSED PEDESTRIAN
5.SYNDICATE BANK - HEAD OFFICE  PEDESTRIAN CAN ALSO BE
6.KARNATAKA BANK SITE
8.(MESCOM) ELECTRICITY BILL PAYMENT OUTLET. PROVIDED AT THE EASTERN
C2 RADIUS:1000m 9.BASEL MISSION CHURCH.
10.DR.TMA PAI POLYTECHNIQUE
PHERIPHERY OF THE
1.KASTURBA MEDICAL COLLEGE
2.ST.JOSEPHS MALABAR CHURCH
PROPOSED SITE WHICH CAN
3.MANIPAL MUSEUM OF ANATOMY AND PATHOLOGY WORK AS A STUDENT
4.VENUGOPAL TEMPLE
5.SRI.NARASIMHA TEMPLE PICKUP POINT.
6.VARA VISHNU NARASIMHA TEMPLE
7.BHAJAN KUTIR
SUBMITTED BY:AARON DSOUZA
SITE ANALYSIS REG.NO:193701304 SHEET NO:3
SEMESTER :III, SECTION:A
NEIGHBOURING BEST SELLERS
STRUCTURES AND ITS APPARELS
PVT. LTD.
EFFECTS
BEST SELLERS
APPARELS PVT. LTD.

PROPOSED
KAMATH BOOK CENTER
SITE

6M ROAD
TIWARI CHAAT
(FAST FOOD JOINT)

 NOISE CTEATED BY THE TEXTILE FACTORY CAN BE BLOCKED BY THE


INCREASING VEGETATION ON THE WESTERN PERIPHERY OF THE SITE.
SMALL NAGA MANDIR  THEY CAN ALSO HELP IN ABSORBING THE WESTERN SUN GLARES.

SUBMITTED BY:AARON DSOUZA


SITE ANALYSIS REG.NO:193701304 SHEET NO: 4
SEMESTER :III, SECTION:A
WATER SUPPLY TO THE SITE
WATER SOURCE:SWARNA
RIVER(UDUPI

BEST SELLERS
APPARELS WTP-1(1971)
PVT. LTD. KUDCEMP(WTP) at
Baje

CLEAR WATER PUMPING PUYMPING STATION-2(WTP-


STATIONS-1(FOR WTP-1) 2)HORIZONTAL SPLIT
HORIZONTAL SPLIT CASE PUMP SET

CLEAR WATER TRANSMISSION CLEAR WATER TRANSMISSION


MAINS.(WTP-1) MAINS(WTP-2)

The clear water was pumped from the clear


water sump at the water
treatment plant to a 3.0 LL ground level surface SERVICE RESERVOIRS.(10 ZONES )
reservoir (GLSR) at Manipal through a CI rising
main with a diameter of 450 mm for 600 m and
through a pipe with diameter of 200 mm CI for
60 m.

MANIPAL (ZONE-2)TWIN
MANIPAL(ZONE-2)OHT-EATER NAGAR
GLSR-EASHWER NAGAR

PROPOSED SITE

SUBMITTED BY:AARON DSOUZA


SITE ANALYSIS REG.NO:193701304 SHEET NO:5
SEMESTER :III, SECTION:A
PROJECT DESCRIPTION
PROJECT :KINDERGARTEN
SITE LOCATION:OPPOSITE TO M.VISVESVARAYA ROAD,EASHWER
MANIPAL,KARNATAKA.
SITE AREA:5989.348SQ.MT
TOPOGRAPGY:FLAT
SOIL TYPE:LATERITE.

THE SITE IS A VACENT LAND WITH FEW VEGETATION AT ITS PERIPHERY.


THE SITE CAN BE ACCESSED THROUGH M.VISVESVARAYA ROAD AT THE
EASTERN SIDE(9M) AND THE 6 M SOUTH ROAD.
THERE IS A VACANT LAND AT THE NORTH SIDE AND A TWO FLOORED
TEXTILE FACTORY ON THE WESTERN SIDE.

ASSUMPTIONS
• SCHOOL WORKING HOURS BETWEEN 9AM-12PM(AS PER THE CASE STUDY)
• TOTAL STRENGTH 50-60.
• USERS OF THE SPACE

STUDENTS TEACHERS
PARENTS SPACES CONSIDERED FOR THE PROJECT
PROJECT OBJECTIVES
• PROVIDING INTERCONNECTING INDOOR AND OUTDOOR SPACES. AS NATURE PROVIDES CONTINOUS • COURTYARD.
OPPORTUNITIES FOR DISCOVERY,CREATIVITY,PROBLEM SOLVING EDUGATION. • MULTYPURPOUSE
• CLASS ROOM. HALL.
• ENSURING PROPER VENTILATION AND ACOUSTIC MEASURES . • ACTIVITY SPACE.
• IMPLIMENTING HARDSCAPE AND SOFTSCAPE FEATURES TO CREATE A JOYFUL ENVIRONMENT • REST ROOM.
• ACADEMIC OFFICE. • DINING AREA.
ROUND THE BUILDING AND TO ENHANCE AESTHETICAL APPEAL OF THE BUILDING. • STAFF ROOM.
• INCREASING THE ENERGY EFFECIENCY OF THE BUILDING THROUGH THE INSTALLATION OF SOLAR PANELS. • STORE ROOM.
• PICTURE BOOK LIBRARY . • TOILETS
• PROVIDING ADIQUATE SANITATION FACILITY FOR THE KIDS ,FACILITY.
• UNDERSTANDING THE NEEDS AND NECESSITY OF KIDS , FACULTIES AND OTHER USERS OF THE SPACE.
• ENSURING PROPER NETWORKING OF ROADS AND PEDESTRIANS FOR EASY CONNECTIVITY OF SPACES.

SUBMITTED BY:AARON DSOUZA


DESIGN BRIEF REG.NO:193701304 SHEET NO: 6
SEMESTER :III, SECTION:A
 THE INTEGRATION OF A COURTYARD INTO A
COURTYARD PLANNING BUILDING FORM OFFERS A MICROCLIMATIC
BUFFER ZONE BETWEEN THE OUTDOOR AND
INDOOR ENVIRONMENTS OF THE BUILDING.

 FROM THE THERMAL COMFORT


VIEWPOINT, A COURTYARD BUILDING PRESENTS A
GREATER FLEXIBILITY IN PROMOTING LARGER AREAS
OF INTERNAL ZONES, WHICH CAN BENEFIT FROM
NATURAL VENTILATION AND DAYLIGHT.

 PASSIVE STRATEGIES FOR INDOOR THERMAL COMFORT CAN BE EASILY


USED IN THE BUILDINGS WITH COURTYARDS. AS AN OPEN SPACE
WITHIN A BUILDING, A COURTYARD IS A DESIGN ELEMENT IN MOST OF
THE VERNACULAR BUILDINGS.

SUBMITTED BY:AARON DSOUZA


CONCEPT SHEET REG.NO:193701304 SHEET NO: 7
SEMESTER :III, SECTION:A
SUBMITTED BY:AARON DSOUZA
ZONING REG.NO:193701304 SHEET NO:8
SEMESTER :III, SECTION:A
SUBMITTED BY:AARON DSOUZA
ZONING REG.NO:193701304 SHEET NO: 9
SEMESTER :III, SECTION:A
SPACES STANDARDS ANALYSIS
ENTERANC AREA CONNECTING THE VARANDA 1.5-2M WIDEENTERANCE 30-36SQ.M TO ACCOMMODATE 15 PEOPLE WITH FREE MOVEMENT
SPACE
COURTYARD\PLAY AREA OUTDOOR PLAY AREA- OUTDOOR AREA PER STUDENT=3sq.m
3sq.m PER STUDENTS INDOOR AREA PER STUDENT=6sq.m
INDOOR PLAY AREA- AREA CONSIDERED FOR THE COURTYARD=450-525sq.m
6sq.m.
VENTILATED AREA,SURFACE SHOULD BE SHOCK
ABSORBING.(TIMBE
FLOORING IS SUGGESTED)

CLASS ROOM STANDARD AREA PER STUDENT=2sq.m 60-70sq.m (INCLUDING THE FURNITURES)
AREA=65sq.m ( CLASSROOM )

ACTIVITY AREA STANDARD AREA PER STUDENT=2.5(ACTIVITY AREA) 70-75 sq.m

TOILET AREA REQUIRED PER STUDENT=1-1.5 sq.m NO OF STUDENTS PER CLASS ROOM=20
AREA CONSIDERED=25-30sq.m
GIRLS BOYS

STAFF ROOM 50sq.m TOTA NO OF FACULTIES (ASSUMPTIONS)=10


AREA CONSIDERED FOR STAFF ROOM=50-60sq.m

DINING AREA AREA =65sq.m Total no of students=50


FOR 20 PUPILS Area considered=770-80 sq.m
PANTRY:15sq.m

SUBMITTED BY:AARON DSOUZA


AREA PROGRAMING REG.NO:193701304 SHEET NO: 10
SEMESTER :III, SECTION:A
SPACES STANDARDS ANALYSIS
ADMINISTRATIVE OFFICE AREA PER PERSON=5sq.m
AREA CONSIDERED 40-50sq.m.(INCLUDING FURNITURE'S AND
QUEUE APACE)

FOR STAFF OF 5-7:60sq.m

MULTIPURPOSE HALL STANDARD AREA PER STUDENT AREA PER STUDENT=2sq.m


=2sq.m TOTAL NO OF STUDENTS=50
AREA CONSIDERED=150-160sq.m

LIBRARY AREA REQUIRED PER STUDENT=2SQ.M


AREA CONSIDERED=150-160SQ.M
PARKING CAR PARKING FOR 5 CARS CARS =300SQ.M FOR 20 VEHICLES.
=52.5sq.m MOTOR CYCLES=20SQ.M
CYCLE=9SQ.M
BIKE PARKING FOR 10 BIKES=13sq.m. SCHOOL BUS(1)=50sq.m

REST ROOM/FIRST AIR ROOM EACH CHILD REQUIRES 1.1sq.m AREA REQUIRED PER EACH STUDENT=1.1sq.m
TOTAL STUDENTS=50sq.m
AREA CONSIDERED=70-80sq.m

SUBMITTED BY:AARON DSOUZA


AREA PROGRAMING REG.NO:193701304 SHEET NO:11
SEMESTER :III, SECTION:A