Page 63
CITA BIM Gathering 2015, November 12th -13th 2015
based virtual environment [4]. It has been observed traditional techniques [11], are heavily reliant on
that nowadays there are some efforts to integrate multi-disciplinary knowledge and experience, and
KM and BIM for risk management. only play limited roles in real workplaces [2]. A
This paper firstly explores the feasibility and significant problem is that the communication of risk
potential to integrate KM and BIM for managing information tends to be poor, incomplete and
risks by reviewing the current challenges in general inconsistent and capturing fragmented information
risk management methods, and development of KM and knowledge from various experts correctly for
and BIM for risk management. Then a new approach solving risk problems in time is challenging [12].
for combining BIM and Knowledge Based Risk Numerous studies [2, 13, 14] have pointed out
Management System (BKRMS) to support project that knowledge and experience management are
lifecycle risk management is presented. Both fragmented and insufficient in traditional risk
conceptual models and technical solutions for management. An important key to success for
developing this system are discussed. Finally managing risks is to find out correct information
practical implications of implementing BKRMS and from experienced personnel within a limited time. In
recommendations for future research are highlighted. addition, the person in charge must make sure the ‘in
mind’ information is the correct solution to the
II DEVELOPMENT OF RISK MANAGEMENT potential risks, and can be understood clearly by
others. However, all AEC projects start with
a) Challenges in general risk management planning and design followed by the construction
stage lasting for months or years, and eventually the
Risks are widely present during the lifecycle of a project will come into the operation phase that may
project and failure to manage them may lead to some last for decades before demolition. The whole
unacceptable or even catastrophic results such as process is dynamic and new problems and
cost and time overrun, injuries or death, and challenges appear every day. This may result in
structural damage or collapse. Risk management some risks cannot be identified and treated properly
includes a series of processes applying logical and in time. For instance, construction progress meetings
systematic approaches for mitigating against risks are crucial in the construction stage and provide an
and facilitating improved communication [5]. opportunity for architect, engineer, client, contractor,
Although there are many differences among and other project participants to discuss and
different standards and specifications of risk communicate any problems or risks that may
management, e.g. PMI [6] and ISO [5], they describe influence the project goals. Senior experts are
that a general risk management process should at regularly invited to attend these meetings and
least contain the following sub-processes: risk discuss any potential risks related to the project with
communication and consultation, risk identification, the construction team. The construction team hopes
risk analysis, risk evaluation, risk treatment, and risk to obtain valuable experts’ knowledge and
monitor and review. The logical sequence of the experience through such meetings to manage
general risk management process is shown in Fig. 1. potential risks. However, the challenges are: 1) the
experts’ ‘in mind’ thoughts are sometimes difficult to
capture within a limited time; 2) the captured
information might not be correct; 3) the information
Project In Use
Planning Design Construction Demolition
Phase M aintenance can be poorly communicated in the meeting and not
Identification well understood properly by others; and 4) the
Communication
& Consultation
Monitor &
Analysis
Analysis
Process Evaluation and execution if information provided by experts are
Treatment
regarded to be incorrect or unreasonable. In addition,
the process of any AEC project is dynamic and new
experience and lessons come out nearly every day.
Consequently, successful risk management requires
Fig. 1: General process of risk management
a quick evaluation of the right information through a
However, the actual work is complex and in ‘brainstorm’ session.
most cases cannot be simply represented by the ideal
process. People need to make a quick decision b) Knowledge management for risk
within a limited time on what the specific work is management
needed for managing a risk and the different sub-
processes that may be applied in parallel [7]. Some
Knowledge management (KM) is a process of
techniques have been developed to help to identify,
capturing, developing, sharing and effectively using
analyse, and treat risks, such as checklists [8],
multi-disciplinary knowledge and experience [15].
decision trees [9] and neural networks (NN) [10].
In the AEC industry, valuable knowledge and
However, these methods are still static and
Page 64
CITA BIM Gathering 2015, November 12th -13th 2015
experience gained from previous projects and proposed a new approach to capturing, extracting,
academic studies could contribute significantly to and storing data and knowledge in building
managing risks for future projects. Effective information models. To strengthen its practical
management of such an enormous database of application and facilitate the communication and
human knowledge and experience, and the flexible reuse of construction knowledge, Ho, et al. [21]
and accurate extraction of data become a developed a BIM based Knowledge Sharing
precondition for success of risk management. It is Management (BIMKSM) system to enable managers
crucially important to manage, use and communicate and engineers share and manage construction
this data effectively during the life cycle of a project. knowledge and experience in the BIM environment
In this process, KM can facilitate risk information and obtain feedback provided by jobsite engineers
stored in a proper structure, communicated and for future reference. To mitigate against construction
reused effectively. Some existing studies have personnel safety risks at design stage, Qi, et al. [22]
recognized this idea and adopted KM for managing developed a dictionary and a constraint model to
project risks. For example, the concept of KM was store construction worker suggestions and the
applied into development of a risk management formalised suggestions respectively. Then rule
framework by Tah and Carr [16] for describing checking software can be implemented to check
projects using a common language based on construction worker safety in BIM, which provides
hierarchical-risk breakdown structure and managing an approach to optimising the drawings and
the risk repository based on database technology. eliminating construction site hazards at an early
Similarly, Sharmak, et al. [7] proposed a stage. Similarly, Motamedi, et al. [23] integrated the
configurable knowledge based risk management use of KM and BIM to investigate an approach for
process model and integrated it into the project detecting failure root-cause which could help facility
lifecycle risk management process. To manage management (FM) technicians identify and solve
personnel safety risks at design stage, Cooke, et al. problems from their cognitive and perceptual
[17] implemented the theory of KM to develop a reasoning. Integrated with BIM, a Computerised
web based decision support program named Maintenance Management System (CMMS) was
ToolSHeD. The core principle behind ToolSHeD is developed to store inspection and maintenance data.
to properly structure safety risk knowledge obtained The main principles of the existing studies
from national guidelines, industry standards and established that: 1) KM can effectively extract and
other information sources, and employ the manage fragmented expert based knowledge and
knowledge for assessing safety risks for complicated experience, and facilitate data stored in a proper
buildings. structure, communicated and reused; 2) BIM is
considered as the primary data repository for shared
c) Building Information Modelling (BIM) as knowledge forming a reliable basis for decision
a systematic solution making; and 3) the visualisation capabilities of BIM
could help technicians or decision makers to
implement the concept of ‘early risk identification
BIM has been highlighted in the AEC industry over
and prevention’ and refine the plan.
the last years and can be used as a systematic risk
However, one or more of the following gaps
management tool to support the development
are still existing in current efforts: 1) no theory to
process of a project. It can not only provide new 3D
support the integration of KM and BIM for
computer-aided design (CAD) platforms and
managing multi-disciplinary knowledge for risk
management methods [4], but also facilitate
management; 2) lack of a theory aligning BIM with
significantly communication and collaboration for
general risk management methods to support the
both within and between organisations [18]. Besides,
development process of a project; and 3) lack of a
BIM has the potential to implement the concept of
standard and colour scheme for supporting
‘early risk identification and prevention’ by
visualising risk in BIM.
visualising, analysing and managing building
lifecycle information in computer based virtual IV TOWARDS A BIM AND KNOWLEDGE
environment before actual construction [19]. BASED RISK MANAGEMENT S YSTEM
Page 65
CITA BIM Gathering 2015, November 12th -13th 2015
advantages of a structured dynamic risk database b) Framework and methodology
and an active link between the database and building
information model to integrate KM and BIM. Risks are highly related to the specific type of
This idea was motivated by previous research projects. To limit the scope of this work, it has been
conducted by Kiviniemi [24] for managing user focused on bridge engineering. As literature
requirements during the life cycle of a project by targeting at bridge risks is very limited but most
establishing an active link between requirements construction projects share a large number of
models and building product models. Kiviniemi [24] common risks [25], the collection of risk sources for
successfully illustrated that user requirement this research can be extended to all types of
information can be divided into different levels and construction projects.
linked with building information models. Similarly, The proposed framework of BKRMS is
for this research risk information can also be linked illustrated in Fig. 3 and consists of two main
to building information models to support the modules: the BIM Module and the Risk Module
development process of a project. However, there is where the two modules are linked intelligently to
currently no theory or software to support this each other. In the BIM Module, design,
solution. Therefore the objectives of this work are as environmental and other general project information
follows: 1) Develop a knowledge based risk model can be captured firstly to generate a 3D building
that stores risk information and cases in a proper information model (BIM). The second step is to
structure; 2) Develop a methodology that can collect and analyse the construction information,
establish the relation between a knowledge based schedule and work breakdown tasks, which can be
risk model with BIM; and 3) Develop a tool based connected with the 3D BIM to generate a 4D BIM.
on existing BIM software to implement and validate The Risk Module provides a user interface for
the proposed methodology through a selected case managing any updates and changes of identified risk
study. in BIM and will help capture and retrieve from two
The overall solution is presented in Fig. 2. BIM databases the information of risk that may affect the
not only is a digital representation of physical and project during its life cycle. An initial set of risk data
functional characteristics of a building but can also can be generated from academic studies, industrial
establish a repository of shared knowledge forming a practices and existing documentation and hierarchies
reliable basis for decision making. Through building which are stored in the knowledge based risk
and managing 3D/4D information models in a database. Another database called the case based
computer based virtual environment before real reasoning library (CBRL) is a collection of both
construction, BIM could improve risk information successful and unsuccessful cases that can provide
extraction and facilitate the performance of risk risk management knowledge about project cases for
identification and communication. In this process, analysing the ongoing project and helping decision
KM could play an essential role to facilitate risk makers investigate possible solutions. The CBRL is
information stored in a proper structure, able to retain and update new cases from the BIM
communicated and reused effectively. In this Module. Risk information will be visualised in the
research, risk information related to a construction 3D/4D BIM that enables identification,
project can be summarised through previous cases, communication, and the management of risks at an
knowledge and experience into a risk model. The early stage.
risk model can be linked to a building information
model (BIM) to generate a BIM and knowledge
based system to support systematic risk management
in the lifecycle of a project.
Knowledge
based risk
database
SQL query
Construction
Risk Management System Schedule
BIM and Knowledge based Risk
Establish an 4D BIM API
Management System (BKRMS)
active 'link 3D BIM
"Condition Search
Engine
Building Information Model
In Use
Planning Design Construction Demolition Gaining new cases Case-based
Maintenance Reasoning
Library
BIM Module Risk Module
Fig. 2: Establishment of an ‘active’ link between BIM and
Risk Management System
Fig. 3: Framework of BIM and Knowledge based Risk
Management System
Page 66
CITA BIM Gathering 2015, November 12th -13th 2015
c) Technical solution and building information model to integrate KM and
BIM. The core principle of the proposed method is
To validate this proposed methodology, a tool will be that risk knowledge developed from existing
developed and tested through a selected case study. documentation, published literature and industrial
The technical application of BKRMS is based on practices can be stored in knowledge based
Autodesk Revit, Autodesk Navisworks, Microsoft databases and linked to 3D/4D BIM to support the
Visual Studio and Microsoft Access. Revit is BIM risk management during the dynamic process of a
based design and modelling software which allows project’s life cycle. Through visualising and
users to design a building and its components in a managing risks in BIM, hazardous work can be
3D environment and provides the access to building identified, analysed, communicated and prevented at
information from the building model’s database. The an early stage. The next stage of this research will
Revit model can be further developed in Navisworks focus on: 1) to establish the risk database by detailed
for achieving 4D functions such as construction analysis of the published literature, industrial
planning and simulation, and real-time navigation. documentation and accidental reports concerning
Access is a database management system and will be construction risks; 2) to collect and analyse
used to store, share and communicate risk industrial risk management cases to develop the case
information and risk cases. Taking advantage of the based reasoning library; 3) to further analyse the
Application Program Interface (API) provided by information stored in the risk database and case
Revit and Navisworks, a user interface of BKRMS based reasoning library and store the data in a proper
can be developed in Microsoft Visual Studio and structure, and ‘link’ risk data to different levels of
embedded into Revit and Navisworks as a plug-in to BIM (i.e. project level, structural level, personnel
link the BIM module and the Risk Module to level, site level, and object level); and 4) to develop
manage knowledge and cases stored in Access a tool based on existing BIM software and validate
databases. By implementing the system, the Risk the proposed methodology through a selected case
Module provides a data base to help risk study.
identification. In addition, risks can also be Interesting research topics in the near future
visualised, displayed and managed in a 3D/4D BIM may include: 1) to further develop the knowledge
environment to support the project life cycle. An based risk database and expand the cased based
active ‘link’ between the BIM and Risk Modules reasoning library, especially for specific type of
would greatly benefit the efficiency and productivity projects; and 2) to validate the BKRMS in both
of project risk management. simple and complicated construction projects and
investigate implementation approaches and
V CONCLUSION AND FUTURE RESEARCH experience. Long-term research topics may focus on
improving the automation and intelligence of
Successfully managing risks in AEC projects is
BKRMS, such as interpreting the risk knowledge to
crucial. However, the current methods which are
be automated or semi-automated machine readable
heavily reliant on multi-disciplinary knowledge and
rules; or integrating the proposed system with other
experience only play a limited role in a real
digital techniques such as sensing and tracking
environment. A significant problem is that the
technologies to establish a real-time risk
communication of risk information tends to be poor,
management environment.
incomplete and inconsistent. Also capturing
fragmented information and knowledge from various ACKNOWLEDGEMENTS
experts correctly and in a timely manner can be
Page 67
CITA BIM Gathering 2015, November 12th -13th 2015
[3] A. S. Kazi, Knowledge management in the [15] I. Nonaka and H. Takeuchi, The knowledge-
construction industry: A socio-technical creating company: How Japanese companies
perspective, IGI Global, USA, 2005. create the dynamics of innovation, Oxford
University Press, UK, 1995.
[4] C. Eastman, P. Teicholz, R. Sacks, and K.
Liston, BIM handbook: A guide to building [16] J. Tah and V. Carr, "Towards a framework for
information modeling for owners, managers, project risk knowledge management in the
designers, engineers and contractors, John construction supply chain". Advances in
Wiley & Sons, USA, 2011. Engineering Software, 32:835-846, 2001.
[5] ISO, "Risk management - Risk assessment [17] T. Cooke, H. Lingard, N. Blismas, and A.
techniques". IEC/FDIS 31010:2009, Stranieri, "ToolSHeDTM: the development and
International Organization for Standardization, evaluation of a decision support tool for health
2009. and safety in construction design".
Engineering, Construction and Architectural
[6] PMI, A guide to the project management body
Management, 15:336-351, 2008.
of knowledge: PMBOK Guide, 3rd ed., Project
Management Institute Inc, USA, 2004. [18] C. S. Dossick and G. Neff, "Messy talk and
clean technology: communication, problem-
[7] W. Sharmak, R. J. Scherer, and P.
solving and collaboration using Building
Katranuschkov, "Configurable Knowledge-
Information Modelling". The Engineering
Based Risk Management Process Model within
Project Organization Journal, 1:83-93, 2011.
the General Construction Project Process
Model" in Proceedings of 24th CIB W78 [19] K.-F. Chien, Z.-H. Wu, and S.-C. Huang,
Conference, 2007, pp. 301-307. "Identifying and assessing critical risk factors
for BIM projects: Empirical study".
[8] B. M. Hales and P. J. Pronovost, "The
Automation in Construction, 45:1-15, 2014.
checklist—a tool for error management and
performance improvement". Journal of critical [20] A. Deshpande, S. Azhar, and S. Amireddy, "A
care, 21:231-235, 2006. Framework for a BIM-based Knowledge
Management System". Procedia Engineering,
[9] P. K. Dey, "Project risk management: a
85:113-122, 2014.
combined analytic hierarchy process and
decision tree approach". Cost Engineering, [21] S. P. Ho, H. P. Tserng, and S. H. Jan,
44:13-27, 2002. "Enhancing knowledge sharing management
using BIM technology in construction". The
[10] T. M. Khoshgoftaar and D. L. Lanning, "A
Scientific World Journal, 2013:170498, 2013.
neural network approach for early detection of
program modules having high risk in the [22] J. Qi, R. R. A. Issa, J. Hinze, and S. Olbina,
maintenance phase". Journal of Systems and "Integration of safety in design through the use
Software, 29:85-91, 1995. of building information modeling" in 2011
ASCE International Workshop on Computing in
[11] A. Alaeddini and I. Dogan, "Using Bayesian
Civil Engineering, June 19 - June 22 2011,
networks for root cause analysis in statistical
Miami, United States, 2011, pp. 698-705.
process control". Expert Systems with
Applications, 38:11230-11243, 2011. [23] A. Motamedi, A. Hammad, and Y. Asen,
"Knowledge-assisted BIM-based visual
[12] J. Tah and V. Carr, "Knowledge-based approach
analytics for failure root cause detection in
to construction project risk management".
facilities management". Automation in
Journal of computing in civil engineering,
Construction, 43:73-83, 2014.
15:170-177, 2001.
[24] A. Kiviniemi, "Requirements management
[13] T. Hartmann, H. Van Meerveld, N. Vossebeld,
interface to building product models", Stanford
and A. Adriaanse, "Aligning building
University, 2005.
information model tools and construction
management methods". Automation in [25] P. X. W. Zou, G. Zhang, and J. Wang,
construction, 22:605-613, 2012. "Understanding the key risks in construction
projects in China". International Journal of
[14] L. Zhang, X. Wu, M. J. Skibniewski, J. Zhong,
Project Management, 25:601-614, 2007.
and Y. Lu, "Bayesian-network-based safety risk
analysis in construction projects". Reliability
Engineering & System Safety, 131:29-39, 2014.
Page 68