AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 01 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C
01 Jan 2020
Date

01 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Sampling of FBEC rebar Fe- 500 D of (32,25,36 mm) for third party testing

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 02 Jan 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
r third party testing Ankit (ME)
Ankit (ME)

0.0151
02 Jan 2020
Date

02 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
CMD - 90 of M-55 for segment with flyash
Sampling of Construction water for third party testing .

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 03 Jan 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
03 Jan 2020
Date

03 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Sampling of PSC (Premium Slag cement) for third party testing .

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 04 Jan 2019


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
04 Jan 2019
Date

04 Jan 2019
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 05 Jan 2020


Day : Sunday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
05 Jan 2020
Date

05 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 06 Jan 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
06 Jan 2020
Date

06 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 07 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
07 Jan 2020
Date

07 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 08 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
08 Jan 2020
Date

08 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 09 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
09 Jan 2020
Date

09 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 10 Jan 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
10 Jan 2020
Date

10 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 11 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
11 Jan 2020
Date

11 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 12 Jan 2020


Day : Sunday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
12 Jan 2020
Date

12 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Visual inspection of Prestressing material ( wedges, anchor head, anchor cone)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 13 Jan 2020


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
or head, anchor cone) Ankit (ME)
Ankit (ME)

0.0151
13 Jan 2020
Date

13 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 14 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
14 Jan 2020
Date

14 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 15 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
15 Jan 2020
Date

15 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 16 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
16 Jan 2020
Date

16 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 18 Jan 2020


Day : Saturday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
18 Jan 2020
Date

18 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 19 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
19 Jan 2020
Date

19 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
GTI lab testing witness (SKW airoli)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 20 Jan 2020


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
20 Jan 2020
Date

20 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Coupler testing witness at TCR lab

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 21 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)

0.0151
21 Jan 2020
Date

21 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 22 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
22 Jan 2020
Date

22 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 23 Jan 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)

0.0151
23 Jan 2020
Date

23 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 24 Jan 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)

0.0151
24 Jan 2020
Date

24 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 25 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
25 Jan 2020
Date

25 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory:

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 26 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
26 Jan 2020
Date

26 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Inspection of PT material (Anchor Cone) External & Internal

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 27 Jan 2020


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
al Ankit (ME)

0.0151
27 Jan 2020
Date

27 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 28 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
28 Jan 2020
Date

28 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 29 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
29 Jan 2020
Date

29 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Inspection of SS Insert (PC yard LNT store)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 30 Jan 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
30 Jan 2020
Date

30 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Qty verification of Incoming Coated and non coated rebars for the month of Januar
Sampling of FBEC bar 25, 32, 36 mm (Elctrotherm) for third party testing.

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 31 Jan 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
or the month of January. Ankit (ME)
party testing.

0.0151
31 Jan 2020
Date

31 Jan 2020
Date