SCHEDULE OF COLUMNS

C-1 C-2

CONF. REINF.
MARK/ 4 SETS
FLR. LEVEL JOINT REINFRCEMENTS

D
3RD FLOOR LEVEL

ROOF DECK LEVEL

JOINT REINF.
(NO SPLICE
ZONE)
GRADE 60, fy=414 MPa
TO

SIZE 300 X 300

CONF. REINF.
REBARS 8-28mmØ

D
MAXIMUM
TIES 2-SETS 10mmØ SPACING
1@50, 9@60, OF TIES
rest @ 110mm to center IS LAP
LENGTH

COLUMN TIES AS
PER SCHEDULE

LAP SPLICE
3RD FLOOR LEVEL
2ND FLOOR LEVEL

GRADE 60, fy=414 MPa

CONF. REINF.
4 SETS
TO

SIZE 400 X 400


JOINT REINFRCEMENTS
REBARS 8-32mmØ

D
TIES 2-SETS 10mmØ
1@50, 7@80,
rest @ 160mm to center

JOINT REINF.
(NO SPLICE
ZONE)
2ND FLOOR LEVEL
FOUNDATION LEVEL

NOTES:
1. YIELD STRENGTH OF HOOPS=275 MPa
CONF. REINF.

GRADE 60, fy=414 MPa GRADE 60, fy=414 MPa 2. CONFINING REINF. ZONE (D) MAXIMUM OF
2.a 16 CLEAR HEIGHT
TO

SIZE 500 X 500 SIZE 400 X 400 2.b MAX. COL. DIMENSION
D

REBARS 8-32mmØ REBARS 8-16mmØ 2.c 450 mm


WHICHEVER IS GREATER
TIES 3-SETS 10mmØ SPIRAL 12mmØ
1@50, 5@100, 12@ 50 mm O.C.
rest @ 200mm to center
COLUMN DETAILS
SCALE NTS

PROJECT PROPOSED THREE STOREY HOSPITAL SHEET CONTENT/S: STRUCTURAL DESIGNED BY: REVISION DATE ISSUED : 06/23/18 SHEET NO.:
CYRIL A. ALEA
DESCRIPTION DATE
OWNER MR. & MRS. CLEMENTE & DIVINA ALEA - SCHEDULE OF COLUMNS CAD BY : C. A. A. STRUCTURAL / CIVIL ENGINEER :
CYRIL A. ALEA
- COLUMN DETAILS
S-13
PRC Reg. No. : 2013-00298-LQ-0 Date :
BLDG. PERMIT No.__________ DATE : ________ISSUED AT : ________ CHECKED BY : PTR : Date :
TIN : Date :
LOCATION BRGY. SAN LORENZO, LOPEZ QUEZON OWNER'S APPROVAL ENGR. RODEL O. FLORIDO PLACE : PROV. OF QUEZON