Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PREANALYSIS CHECKS
8.Compare the diffierance in total reaction due to the gravity load in SAFE and
ETABS by creating substitute models
9.Assign the design parameters in the safe model
10.Assign Mesh sizing options in SAFE model.
DRAWING PREPARATION
19.Standard drawings are prepared for typical Middle Strips, Drop and Column Strips
as per the model geometry with appropriate Ids.
20.Element type Id and Rebar Id are marked in the plan layout of the floor
21.Extra detail is prepared for all location which doesnt confirm to the typical
case.