TASK

task_code status_code wbs_id var_primary_work_qty


Activity ID Activity Status WBS Code (*)Variance - BL1 Labor Units(h)
MN1010 Completed MFG00659-1.Sys-Eng 18
MN1060 Completed MFG00659-1.Sys-Eng 10
MN1020 Completed MFG00659-1.Sys-Eng 6
MN1070 Completed MFG00659-1.Sys-Eng -5
MN1000 Completed MFG00659-1.Sys-Eng -33
MN1040 Completed MFG00659-1.Sys-Eng 3
MN1440 Not Started MFG00659-1.Sys-Eng 0
MN1030 Completed MFG00659-1.Sys-Eng 0
MN1230 Not Started MFG00659-1.Hard 0
MN1240 Not Started MFG00659-1.Hard 0
MN1290 Not Started MFG00659-1.Hard 0
MN1100 Completed MFG00659-1.Hard 0
MN1320 Not Started MFG00659-1.Hard 0
MN1310 Not Started MFG00659-1.Hard 0
MN1080 Completed MFG00659-1.Hard -3
MN1110 Completed MFG00659-1.Hard 4
MN1300 Not Started MFG00659-1.Hard 0
MN1200 Completed MFG00659-1.Hard.Temp -17
MN1140 Completed MFG00659-1.Hard.Temp -4
MN1170 Completed MFG00659-1.Hard.Temp 5
MN1180 Completed MFG00659-1.Hard.Temp 1
MN1190 Completed MFG00659-1.Hard.Temp -21
MN1120 Completed MFG00659-1.Hard.Robot -2
MN1210 Not Started MFG00659-1.Hard.Robot 0
MN1350 Not Started MFG00659-1.Hard.Robot 0
MN1270 Not Started MFG00659-1.Hard.Robot 0
MN1280 Not Started MFG00659-1.Hard.Robot 0
MN1130 Completed MFG00659-1.Hard.Robot -6
MN1220 Not Started MFG00659-1.Hard.Systems 0
MN1250 Not Started MFG00659-1.Hard.Systems 0
MN1050 Completed MFG00659-1.Hard.Systems 0
MN1090 Completed MFG00659-1.Hard.Systems 2
MN1150 Completed MFG00659-1.Hard.Systems -1
MN1160 Completed MFG00659-1.Hard.Systems -10
MN1260 Not Started MFG00659-1.Hard.Systems 0
MN1330 Not Started MFG00659-1.Soft 0
MN1360 Not Started MFG00659-1.Soft 0
MN1380 Not Started MFG00659-1.Soft 0
MN1420 Not Started MFG00659-1.Soft 0
MN1340 Not Started MFG00659-1.Soft 0
MN1390 Not Started MFG00659-1.Soft 0
MN1400 Not Started MFG00659-1.Soft 0
MN1370 Not Started MFG00659-1.Soft 0
MN1410 Not Started MFG00659-1.Soft 0
MN1430 Not Started MFG00659-1.Train.Docs 0

Page 1
TASK

var_work_qty user_field_399 actv_code_item_id


(*)Variance - BL Project Labor Units(h) EAM Estimated vs Committed Cost Variance($) Item
18 PPPP1
10 PPPP2
6 PPPP3
-5 PPPP4
-33 PPPP5
3 PPPP6
0 PPPP7
0 PPPP8
0 PPPP9
0 PPPP10
0 PPPP11
0 PPPP12
0 PPPP13
0 PPPP14
-3 PPPP15
4 PPPP16
0 PPPP17
33 PPPP18
-4 PPPP19
5 PPPP20
1 PPPP21
-21 PPPP22
-2 PPPP23
0 PPPP24
0 PPPP25
0 PPPP26
0 PPPP27
-6 PPPP28
0 PPPP29
0 PPPP30
0 PPPP31
2 PPPP32
-1 PPPP33
-10 PPPP34
0 PPPP35
0 PPPP36
0 PPPP37
0 PPPP38
0 PPPP39
0 PPPP40
0 PPPP41
0 PPPP42
0 PPPP43
0 PPPP44
0 PPPP45

Page 2
TASK

task_name start_date end_date


Activity Name (*)Start (*)Finish
System Design 17-Dec-10 24-Jan-11
Approve System Design 26-Jan-11 01-Feb-11
Prepare Drawings for Temp Control Equipment 12-Jan-11 31-Jan-11
Review and Approve Temp Control Equipment 03-Feb-11 09-Feb-11
Define System Requirements 01-Dec-10 22-Dec-10
Review and Approve System Controller 18-Jan-11 25-Jan-11
System Approved 17-Aug-11
Prepare Drawings for System Controller 12-Jan-11 18-Jan-11
Test & Debug Line A 24-May-11 16-Jun-11
Test & Debug Line B 24-May-11 16-Jun-11
Pilot Start Line A 16-Jun-11 20-Jun-11
Installation Begins 08-Feb-11
Path Refinement and Shakedown-Line A 20-Jun-11 24-Jun-11
Path Refinement and Shakedown-Line B 17-Jun-11 23-Jun-11
Site Preparation 04-Feb-11 08-Feb-11
Install Electrical Power 08-Feb-11 25-Feb-11
Start-Up Line B 16-Jun-11 17-Jun-11
Install Temperature Control Equipment 21-Mar-11 27-Apr-11
Prepare and Solicit Bids for Temp Control Equip 09-Feb-11 14-Feb-11
Review Bids for Temp Control Equipment 14-Feb-11 18-Feb-11
Award Contract for Temp Control Equipment 21-Feb-11 21-Feb-11
Fabricate & Deliver Temp Control Equipment 21-Feb-11 17-Mar-11
Install Robot Base 08-Feb-11 25-Feb-11
Set & Connect Robots 02-May-11 04-May-11
Calibrate Robot Controller & Power Up 28-Jun-11 29-Jun-11
Trim Robot Paths Line A 15-Jun-11 16-Jun-11
Trim Robot Paths Line B 15-Jun-11 16-Jun-11
Run Sealant, Air, and Water Piping 08-Feb-11 25-Feb-11
Install System & Misc. Components 04-May-11 24-May-11
Install System Controller 24-May-11 08-Jun-11
Prepare and Solicit Bids for System Controller 25-Jan-11 02-Feb-11
Review Bids for System Controller 07-Feb-11 08-Feb-11
Award Contract for System Controller 08-Feb-11 09-Feb-11
Fabricate and Deliver System Controller 14-Feb-11 18-Mar-11
Install Bar Rails 31-May-11 03-Jun-11
Install Processor/Software/Data Tapes 24-Jun-11 28-Jun-11
Load System Software 29-Jun-11 30-Jun-11
Program 01-Jul-11 21-Jul-11
Startup Procedure Development 05-Aug-11 09-Aug-11
Production Start 24-Jun-11
Test Software 21-Jul-11 27-Jul-11
Debug Software 27-Jul-11 04-Aug-11
Manual Operation Ready 30-Jun-11 01-Jul-11
Automatic Operation Ready 04-Aug-11 05-Aug-11
Training Manuals/System Operation 09-Aug-11 17-Aug-11

Page 3
TASK

resource_list delete_record_flag
(*)Resources Delete This Row
Jeff Young, Wendy Resner, Paul Kim
Jeff Young, Administrator
Wendy Resner, Administrator
Jeff Young, Wendy Resner
Wendy Resner, Jeff Young
Jeff Young, Wendy Resner

Wendy Resner, Field Eng-Senior


Wendy Resner, Field Eng-Senior
Wendy Resner

Field Engineer
Field Engineer
Field Eng-Assistant
Electrician
Wendy Resner
Field Engineer, Electrician, Administrator, Owen McGuire, Project Manager
Administrator
Project Controls, Administrator
Project Controls, Administrator
Project Controls, Administrator
Field Eng-Senior
Field Eng-Senior
Field Eng-Senior
Field Engineer, Wendy Resner
Wendy Resner, Field Eng-Senior
Plumber
Field Eng-Senior
Field Engineer
Project Controls, Wendy Resner
Project Controls
Project Controls
Project Controls
Field Eng-Assistant
Wendy Resner

Wendy Resner

Wendy Resner

Page 4
USERDATA

user_data
UserSettings Do Not Edit