Sei sulla pagina 1di 38

US007136719B2

(12) United States Patent (10) Patent No.: US 7,136,719 B2


Pokorny et al. (45) Date of Patent: Nov. 14, 2006

(54) METHOD FOR THE COMPUTER-ASSISTED (58) Field of Classification Search ................ 700/103,
REGULATING OF A PLURALITY OF 700/173-175, 28–30, 47 49; 702/44; 706/62:
SERIALLY COUPLED MACHINES, 318/561,567,569. 571
REGULATING DEVICE AND MACHINE See application file for complete search history.
ARRANGEMENT (56) References Cited
U.S. PATENT DOCUMENTS
(75) Inventors: Sascha Pokorny, Haan (DE); Joachim
Hennig, Dresden (DE); Joachim 4,481,457 A 11/1984 Zach et al.
Meier, Leichlingen (DE); Heiner
Brinkmann, Langenfeld (DE); Ralf (Continued)
Reifferscheidt, Duisburg (DE);
Matthias Weiss, Dresden (DE) FOREIGN PATENT DOCUMENTS
DE 37 O1880 C2 9, 1988
(73) Assignee: Henkel Kommanditgesellschaft auf
Aktien, Duesseldorf (DE)
(Continued)
(*) Notice: Subject to any disclaimer, the term of this OTHER PUBLICATIONS
patent is extended or adjusted under 35
U.S.C. 154(b) by 0 days. T. Rädler, Modellierung und Simulation von Abfuellinien,
Fortschrittsbericht VDI-Reihe 14, Nr. 93, VDI-Verlag, ISBN: 3-18
(21) Appl. No.: 11/240,910 30933 14-6, p. 57 (1999).
(22) Filed: Sep. 30, 2005 (Continued)
Primary Examiner Crystal J. Barnes
(65) Prior Publication Data (74) Attorney, Agent, or Firm—Stephen D. Harper; Glenn E.
US 2006/OO58896 A1 Mar. 16, 2006 J. Murphy
Related U.S. Application Data (57) ABSTRACT
(63) Continuation of application No. PCT/EP2004/ A method for stabilizing machine processes in which the
002891, filed on Mar. 19, 2004. machines are regulated by a machine regulation matrix
(30) Foreign Application Priority Data selected from a plurality of machine regulation matrixes
using a detected machine sensor value, set-point values of
Mar. 31, 2003 (DE) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 103 14573
the machines being stored in each machine regulation
matrix. A process is optimized according to a predefined
(51) Int. C. criterion by also using some of the machine sensor values
G06F 9/00 (2006.01) Such that a machine regulation matrix which is optimal
G06F 5/8 (2006.01) according to the process optimization is determined from the
G06B I3/02 (2006.01) plurality of machine regulation matrixes and is Subsequently
G06B I3/00 (2006.01) used for regulating the machines.
(52) U.S. Cl. .......................... 700/173; 700/30; 700/47;
700/49; 706/62; 318/561 13 Claims, 9 Drawing Sheets

7. \ O il 4
3. has Ito, Ji
6
'--- 2
8 118

...OOOOO ..... 6

is 6 is 115 is 16 is 16 & 16 116 116

40 148

153 147 :

49 --

150
US 7,136,719 B2
Page 2

U.S. PATENT DOCUMENTS 2003/0050717 A1 3/2003 Hirata et al.

4,745,556 A 5/1988 Turley FOREIGN PATENT DOCUMENTS


4,987,547 A * 1/1991 Rabindran et al. - - - - - - TOO.220
EP O 745 91.6 A1 12/1996
4,988,935 A 1, 1991 York EP 118886O A2 * 3, 2002
5,413,651 A * 5/1995 Otruba ....... 15664 WO WO 200408.8439 A1 * 10/2004
5,560,194 A * 10/1996 Shofner et al. ... 57,264
5,712,782 A * 1/1998 Weigelt et al. ... ... TO1,50 OTHER PUBLICATIONS
5,838,595 A * 11/1998 Sullivan et al. ....... - - - - - - - - - 703/2
“PacSi Specification” at http://www.ikatz-dd.de.
5,963,003 A 10/1999 Boyer “ISSOP' at http://www.dualis-it.de/seiten/issopframe.html.
6,272,391 B1* 8/2001 Maturana et al. ..... --- --- TOOf 103

6,315,658 B1 * 1 1/2001 Weber ........... * cited by examiner


U.S. Patent Nov. 14, 2006 Sheet 1 of 9 US 7,136,719 B2
U.S. Patent Nov. 14, 2006 Sheet 2 of 9 US 7,136,719 B2
U.S. Patent Nov. 14, 2006 Sheet 3 of 9 US 7,136,719 B2
U.S. Patent Nov. 14, 2006 Sheet 4 of 9 US 7,136,719 B2

A.A.

oS2
U.S. Patent Nov. 14, 2006 Sheet 5 of 9 US 7,136,719 B2

008
U.S. Patent Nov. 14, 2006 Sheet 6 of 9 US 7,136,719 B2
U.S. Patent Nov. 14, 2006 Sheet 7 of 9 US 7,136,719 B2

A
uJoNTA
U.S. Patent US 7,136,719 B2
U.S. Patent Nov. 14, 2006 Sheet 9 Of 9 US 7,136,719 B2

TAxD?I|doADVTAuJONI

upJvON?IA
US 7,136,719 B2
1. 2
METHOD FOR THE COMPUTER-ASSISTED The problem is solved by a method for computer-aided
REGULATING OF A PLURALITY OF control of a plurality of machines which are coupled to one
SERIALLY COUPLED MACHINES, another in series, by means of a control device and by means
REGULATING DEVICE AND MACHINE of a machine arrangement.
ARRANGEMENT
SUMMARY OF THE INVENTION
CROSS REFERENCE TO RELATED
APPLICATIONS In a method for computer-aided control of a plurality of
machines which are coupled to one another in series, in other
This application is a continuation under 35 U.S.C. S 10 words a plurality of interlinked machines in a row, machine
365(c) and 35 U.S.C. S 120 of international application sensor values are recorded, for example the processing speed
PCT/EP2004/002891, filed on Mar 19, 2004. This applica of the machines or the number of items which are fed into
tion also claims priority under 35 U.S.C. S 119 of DE 103 the respective machine, that is to say those which are
14573.7, filed Mar. 31, 2003. Each of the foregoing appli Supplied to it or are emitted from the machine, that is to say
cations is incorporated herein by reference in its entirety. 15 are carried away from it.
BACKGROUND OF THE INVENTION The machines are preferably in the form of processing
machines, in particular packaging machines, whose process
DE 3701 880 C1 describes a method for controlling the ing and/or packaging characteristic is controlled by means of
the method.
optimum operating speeds of a processing machine. In the
control method described, sensors are used to determine Using at least Some of the recorded machine sensor
down times of a processing machine and the quantity of values, the machines are controlled in order to stabilize their
goods processed in the machine, and the processing speed of processes on the basis of a machine control matrix which is
the processing machine is adjusted as a function of the store selected from a plurality of machine control matrices, with
occupancy of the processing goods on the basis of different 25 nominal control values for the controlled machine being
control functions, either on the basis of a control function stored in each machine control matrix. Furthermore, process
which describes an optimum-output processing speed of the optimization is carried out on the basis of a predeterminable
processing machine, on the basis of a control function which criterion using at least some of the recorded machine sensor
describes a cost-optimum processing speed of the machine, values, by which means a machine control matrix which is
or on the basis of a control function which describes a 30
optimum on the basis of the process optimization is deter
productivity-optimum processing speed of the processing mined from the plurality of machine control matrices, and is
machine. then used to control the machines.
As an alternative to the control of a single processing The process optimization can be carried out as often as
machine, preferably a wrapping machine for hard caramels desired, preferably on the basis of a predeterminable time
according to DE 3701 880 C1, the method described in DE 35 criterion, that is to say preferably periodically at a prede
3701 880 C1 can also be applied to processing machines terminable repetition interval. An optimum selected machine
which are coupled to one another in parallel. control matrix is thus always used for the predetermined
Furthermore, T. Rädler, Modellierung und Simulation von repetition interval and, once the process optimization has
Abfillinien, Fortschrittsbericht Modelling and Simulation been carried out, a different machine control matrix can in
of filling lines, Progress Report VDI Series 14, No. 93, 40 each case be used for process stabilization purposes.
VDI-Verlag, ISBN: 3-18-309314-6, page 57 (1999) A control device for controlling a plurality of machines
describes the optimum control of filling machines with which are coupled to one another in series has a recording
different processing speeds on the basis of a so-called speed device for recording machine sensor values, in which case
V diagram, also referred to as a speed V profile. the recording device can preferably have any desired num
In addition, the Institut fuer Konstruktionstechnik und 45 ber of sensors, for example light barriers with counters
Anlagengestaltung (Dresden, Germany) produces a com connected to them, in order to record the respective state of
mercially available processing machine simulation program. the machine. Furthermore, the control device has a control
This simulation program, which is called PacSi, is used to unit for controlling the machines in order to stabilize their
simulate a process line having a plurality of processing processes on the basis of a machine control matrix which is
machines which are coupled to one another in series. The 50 selected from a plurality of machine control matrices, with
simulation input parameters are, for example, the mean time nominal control values for the controlled machines being
between two failures (Mean Time Between Failure (MTBF)) stored in each machine control matrix, and with the control
and the mean time between the occurrence of a fault and its unit using at least some of the recorded machine sensor
rectification (Mean Time To Repair (MTTR)) as well as the values. In addition, a process optimization unit is provided
respective processing speeds at which the respective 55 for carrying out a process optimization on the basis of a
machine is operated. predeterminable criterion using at least some of the recorded
In addition, Dualis GmbH IT Solution (Dresden, Ger machine sensor values. A machine control matrix selection
many) produces a Software optimization program, which is unit, which is likewise provided in the control device,
likewise commercially available and is called ISSOP. This determines and selects an optimum machine control matrix
optimization program provides different optimization meth 60 from the plurality of machine control matrices on the basis
ods, for example empirically based, gradient-based and of the process optimization, with the specific and selected
model-based optimization methods, which can be used for optimum machine control matrix then being used for the
process optimization purposes. machine purposes.
The invention is based on the problem of providing A machine arrangement according to the invention has a
improved process optimization for a machine installation 65 plurality of machines which are coupled to one another in
having a plurality of machines which are coupled to one series, as well as a control device, which is coupled to the
another in series. machines, in order to control the machines.
US 7,136,719 B2
3 4
The invention can clearly be seen in that a two-stage, Another refinement of the invention provides for at least
hierarchical optimization process is provided for closed some of the machines to be in the form of one of the
loop or open-loop control of machines which are interlinked following machines:
in a row, with process stabilization being carried out in a first bottle erector machine
stage and process optimization being carried out in a second 5 material filling machine
stage, with that machine control matrix which is in each case cap sorting machine
used in the course of the process stabilization, for example cap aligner machine
a matrix in which the respective nominal operating speeds of bottle closure machine
the machines are indicated, being determined and selected in bottle shoe lifter machine
the course of the process optimization. 10 bottle labeling machine,
The invention controls a series line of machines, whose coding machine
process behavior is intrinsically very unstable and complex, Sticker machine
in a process line in a simple, convenient and robust manner. sheet shrinkage machine
Preferred developments of the invention are specified in multiple pack aligner machine,
the dependent claims. 15 carton packaging machine
The refinements of the invention which are described in carton closure machine
the following text relate not only to the method and the carton label printing machine
control device but also to the machine arrangement. checking balance
palletization machine.
One development of the invention provides that nominal This means that the invention can preferably be used in
speed values at which the respective machines are intended the field of process line control for a packaging process line
to be operated are quoted in the machine control matrix. In and/or a material filling process line.
other words, the process stabilization is based on a matrix in As stated above, the process optimization can be carried
which the nominal operating speeds of the controlled out repeatedly as a function of a repetition criterion, for
machines are indicated. 25 example repeatedly on the basis of a predeterminable rep
It has been found that the operating speeds of the etition period.
machines are a highly suitable controlled variable which can The process optimization is preferably carried out on the
be influenced in a simple manner and which thus allows basis of one of the following optimization methods:
simple control. an iterative optimization method,
According to one refinement of the invention, the speed 30 a gradient-based optimization method,
values in the machine control matrix are allocated to the a model-based optimization method.
machines in accordance with a speed V profile, preferably in The optimization can be carried out using an explicit
a corresponding manner to that described, for example, for description of the processes by means of mathematical
a filling device in T. Rädler, Modellierung und Simulation functions, for example by means of differential equation
von Abfillinien, Fortschrittsbericht Modelling and Simu 35 systems, statistics etc., with fixed limits as well as quanti
lation of filling lines, Progress Report VDI Series 14, No. tative transfer functions being predetermined in the course
93, VDI-Verlag, ISBN: 3-18-309314-6, page 57 (1999). of the process description.
It has been found that the speed V profile is very highly As an alternative to deterministic description of the pro
suitable for controlling machines which are interlinked in a cess, a fuZZy description of a process can be used for process
row for process stabilization purposes. 40 optimization purposes, for example using fuzzy logic with
The nominal control values of the selected machine linguistic variables without fixed process limits and with
control matrix can be varied for control purposes, with the qualitative transfer functions.
control process being carried out at the process stabilization Alternatively, any type of stochastic estimator, for
level on the basis of the amended nominal control values. example a neural network can be used for process optimi
This allows intervention in the process stabilization at a 45 Zation, for model-based process optimization purposes.
lower control level, directly and in real time, according to One exemplary embodiment of the invention is illustrated
the invention. in the figures and will be explained in more detail in the
following text.
Another refinement of the invention provides for a com Although the exemplary embodiment is used as the basis
puter-aided simulation to be carried out, preferably using a 50 for describing a process line for filling bottles with hair
computer simulation program, of the plurality of machines shampoo, it should be noted that the invention can be
which are interlinked in a row, with a simulation model of applied to any type of machines which are interlinked in a
the machines being used in the course of the computer-aided row, in particular to processing machines which are inter
technical simulation.
linked in a row and preferably to packaging machines which
This refinement of the invention provides for the process 55 are interlinked in a row, in which items which are supplied
optimization to be carried on the basis of the result of the Successively to each individual machine can be processed in
computer-aided simulation. the respective machine on the basis of the machine charac
According to the invention, the PacSi program described teristic, can be emitted from the machine and can be
above can be used as the simulation program. The coupling Supplied from this machine once again as the input process
of the simulation and the optimization to one another 60 ing items in each case to a Subsequent machine in the
according to the invention for the purposes of 1 two-stage processing sequence.
control of machines which are interlinked in a row allows
the machines to be controlled quickly and nevertheless very DESCRIPTION OF DRAWINGS
robustly and realistically. The process optimization is pref
erably carried out on the basis of maximization of the output 65 In the figures:
of the individual machines, for example by using the effec FIGS. 1a to 1c show a machine arrangement according to
tive output as a controlled variable for control purposes. one exemplary embodiment of the invention.
US 7,136,719 B2
5 6
FIG. 2 shows an illustration of a screen surface of a packaging and on the other hand multiple bottle packaging,
computer simulation program, with the results of the simu that is to say a predeterminable number of bottles are
lation being used for process optimization purposes in order combined and are jointly welded in a sheet. According to
to control the machines in the machine arrangement, accord this exemplary embodiment, it is possible for any desired
ing to the exemplary embodiment of the invention. 5 predeterminable number of bottles, preferably five bottles, to
FIG. 3 shows a block diagram illustrating the principle of be jointly welded in a sheet. If this is desired, then the
two-stage control according to the exemplary embodiment labeled bottles 124, which have been marked with additional
of the invention. identification, are Supplied via a secondary conveyor belt
FIG. 4 shows a diagram illustrating speed V profiles 125 to a group-of-five sheet shrinker machine 126, in which
according to the exemplary embodiment of the invention. 10 five bottles are in each case packaged jointly in one sheet
FIGS. 5a to 5d show functional diagrams illustrating and are welded, and the sheet is thus shrunk. If the bottles
process optimization based on an iterative process optimi 124 are still intended to be packaged individually, then the
Zation strategy. labeled bottles 124 which have been marked with additional
FIGS. 6a to 6d show functional diagrams illustrating information are passed on via the main conveyor belt 127,
process optimization on the basis of a gradient-based pro 15 bypassing the sheet shrinker machine 126.
cess optimization strategy. In a further production path, two additional sticker
FIGS. 7a 7d show functional diagrams illustrating pro machines 128, 129 are then provided, by means of which
cess optimization on the basis of a model-based process additional information can be applied to the sheets in which
optimization strategy. the bottles are packaged.
The bottles 130, which are completely marked in this way,
DESCRIPTION OF THE PREFERRED are Supplied to a carton packaging machine 131, by means
EMBODIMENT of which the bottles 130 are packaged in cartons 133 which
are supplied to the carton packaging machine 131 via a
The machine arrangement 100 has a bottle erector secondary input. The cartons 133 are erected by means of a
machine 101, which is designed such that empty bottles 102 25 multiple package erector machine 132, and are Supplied,
which are supplied to the bottle erector machine 101 are folded in a predetermined manner, to the secondary input of
placed in bottle shoes 116, which will be described in more the carton packaging machine 131.
detail in the following text, in order in this way to ensure that The cartons 134 which have been filled with the bottles
the life of the bottles 102 is increased. are supplied via a further conveyor belt 135 to a carton
Once the bottles have been placed in the bottle shoes 116, 30 closure machine 136, in which the cartons 134 are closed.
the bottles 102 are supplied to a filler machine 104 by means The closed cartons 137 are transported, once again by
of a conveyor belt 103. In general, the filling machine 104 means of a conveyor belt 138, from the carton closure
is used to fill a container with a product with which it is in machine 136 to a carton label printing machine 139, in
each case intended to be filled, with the bottle 102 that is which predeterminable labels are printed on the cartons 137.
supplied to the filling machine 104 in the case of this 35 The cartons 140 which have been provided with labels are
exemplary embodiment being filled with the desired liquid, Supplied, once again by means of a conveyor belt 141, to a
specifically hair shampoo. check weighing facility 142, which determines the correct
The bottle 105 filled with the liquid is transported by weight of the respectively filled and closed cartons 137, in
means of a further conveyor belt 106 from the filling order to check whether the cartons 137 have actually been
machine 104 to a cap aligner machine 107, and is supplied 40 completely filled. If the cartons have not been completely
to this machine. Closure caps 110 are Supplied via a sec filled, then the incorrectly filled cartons are rejected, and the
ondary input in a secondary flow for the cap aligner machine bottles are used to fill new cartons. The correctly filled
107 from a cap sorting machine 108 via a further conveyor cartons 143 are Supplied from the check weighing facility
belt 109, and are applied to the filled bottles 105 by the cap 142 by means of a further conveyor belt 144 to a palletiza
aligner. 45 tion machine 145, which stacks the cartons 143 on pallets,
The bottles 111 with the lids fitted are supplied via a and then delivers them.
further conveyor belt 112 to a bottle closure machine 113, Sensors, for example light barriers, are provided both at
which completely closes the bottles 111 with the caps 110. the main flow inputs of the individual machines and at the
so that the hair shampoo can no longer flow out of the bottle secondary flow inputs of the machines, by which, for
111. 50 example, caps or cartons are Supplied to the respective
The bottles 114 which have been closed with the caps 110 machine, in general for processing of the Supplied material
are supplied to a bottle shoe removal machine 115, in which which is actually used for the items to be processed, and at
the bottles 114 which have been filled and have been closed the outputs of the machines and at any desired predeter
with the caps are lifted out of the bottle shoes 116. The bottle minable positions on a conveyor belt, in order to determine
shoes 116, which are now empty, are supplied once again via 55 elements, for example a bottle, passing through a light
a further conveyor belt 117 to a secondary flow input 118 of barrier and, for example, to count these events by means of
the bottle erector machine 101. counters which are likewise provided and are coupled to the
The bottles 114 are then supplied by means of an addi light barriers.
tional conveyor belt 118 to a labeling machine 119, which The conveyor belts are coupled by means of a first
applies predeterminable labels to the bottles 114. 60 fieldbus 146, in this exemplary embodiment a Profibus, to a
Additional predeterminable codes are applied, for belt control unit 147, in this exemplary embodiment a
example by means of an inkjet system, to the labeled bottles programmable logic controller (PLC).
120 by means of a coding machine 121. Additional infor The machines are connected to a process stabilization
mation is adhesively attached to the bottles by means of two control computer 149 by means of a second fieldbus, in this
sticker machines 122, 123. 65 exemplary embodiment likewise a Profibus 148.
For the rest of the production procedure, a distinction is Control variables by means of which the speed of the
drawn between two situations, on the one hand single-bottle individual conveyor belts is set are supplied to the individual
US 7,136,719 B2
7 8
conveyor belt by means of the belt control unit 147. Control FIG. 2 shows a screen surface 201 of the PacSisimulation
variables are Supplied by means of the process stabilization program, which is carried out by the simulation computer
control computer 149 to the individual machines and to the 153, in order to illustrate the coupling according to the
programmable logic controllers which are preferably pro invention of a technical simulation of the machines in the
vided in the machines, by means of the second fieldbus 148, machine arrangement and the process optimization. The
with the control variables in this exemplary embodiment respective large number of machines and their coupling to
being nominal speed values, by means of which the respec one another, preferably by means of conveyor belts, and the
tive nominal operating speed of the machine is set, using the respective material flows are entered in the simulation
programmable logic controller for the respective machine. program.
In an alternative embodiment, in the situation where some 10 The operating speeds 202, the mean time between two
of the machines are not fieldbus compatible, predeter failures of the machine 203 and the mean failure rates 204
minable signals are recorded by means of separate remote as well as the associated distribution functions are also
input/output interfaces (not illustrated), and corresponding entered for each of the machines.
control variables are Supplied to the respective machine in During a simulation relating to the respectively entered
accordance with the respective proprietary data format 15 variables for different fault states, which are in each case set
which is Supported by the respective machine. manually or automatically in the simulation, for example a
Furthermore, the data recorded by the sensors is supplied failure of one or more of the machines in the process line or
by means of the first fieldbus 146 and/or the second fieldbus a lack or excess of production items in the material flow, the
148 to a measurement data recording computer 150, which simulation program determines the optimization functions
is coupled to the belt control unit 147 and to the process of the effective output, as is described per se for a single
stabilization control computer 149 via a local communica machine in 1.
tion network 151, in this exemplary embodiment the Eth The result of the simulation is thus, for example, the
ernet, and is stored by this process stabilization control simulated actual speed of the respective machine, the actual
computer 149 in a measurement data database. The mea productivity of the machine or of the entire process line and,
Surement data database is managed by a database computer 25 depending on the process optimization strategy that is used,
150. An additional process optimization computer 152 is the nominal productivity of the machines in the process line
likewise coupled to the abovementioned computers 147, of the individual machines running at the actual speed
149, 150 by means of the Ethernet 151. The process opti mentioned above, or the complete characteristic, that is to
mization computer 152 carries out the process optimization say a complete model description of the nominal produc
processes described in the following text. 30 tivity as a function of the nominal speeds.
A simulation program, in this exemplary embodiment the These results which are produced by the simulation
technical computer simulation program PacSi, is stored in a program are supplied via the Ethernet 151 to the process
simulation computer 153. The simulation computer 153 is optimization computer 152, where they are processed using
likewise coupled to the Ethernet 151 and, via it, to the the respective process optimization process, in the form of
computers 147, 149, 150, 152 mentioned above, so that data 35 a process optimization computer program 205, in this exem
can be interchanged between the individual computers 147, plary embodiment the ISSOP optimization program.
149, 150, 152. Process optimization is carried out by means of the
In other words, this means that, according to the inven process optimization program using the respectively desired
tion, the process stabilization control computer 149 controls process optimization strategy, as will be explained in more
the machines as described in the following text on the basis 40 detail in the following text. One result of the process
of the respectively selected speed V profile. In other words, optimization that is carried out is a selected optimum
this means that the control process is carried out at the first machine control matrix, in which the respective optimum
hierarchical level, that is to say at the lower hierarchical operating speeds (in terms of the effective output) are stored
level. in the previously defined speed V profiles.
As will be explained in more detail in the following text, 45 The optimum operating speeds (which are selected in this
the process optimization computer 152 uses the results of the way using the optimum machine control matrix) of the
technical simulation (which is in each case carried out by the individual machines are Supplied to the programmable logic
simulation computer 153) of the process line with the large controllers for the machines from the process stabilization
number of machines to carry out process optimization with control computer 149, and are thus Supplied to the machines.
the maximum effective output (productivity) of the process 50 The process stabilization control computer 149 receives
line in production items as the optimization criterion. details about the optimum speed V profile from the process
In an alternative embodiment, the computers 149, 150, optimization computer 152.
152 and 153 are partially or completely combined in a FIG. 3 uses a block diagram to show, schematically, the
hardware unit, preferably in a personal computer. interaction between the machines, the process stabilization
Each machine in the production path is preceded on the 55 control computer 149, the process optimization computer
input side by a store of any desired size (not shown), in 152 and the simulation computer 153.
which the production item to be processed is inserted, and The machines, which are identified jointly as a block 300
from which the machine takes the production item. The store in FIG. 3, are monitored by means of the sensors that are
allows the process line to be controlled more robustly and provided in the process line for their actual speeds as well as
with fewer fluctuations since a defect or jam which is limited 60 their material flow, for example the number of bottles
to a short time at a previous or Subsequent machine has no passing through a light barrier per unit time.
effect on the machine itself. The machine sensor values which are recorded by means
In this context, it should be noted that, in an alternative of the sensors are supplied via the first fieldbus 146 to the
embodiment, a plurality of the machines described above control computers 147 and/or 149 and, via them, to the
can be integrated in one machine. For example, the cap 65 measurement data database. Process stabilization is carried
sorting machine 108 and the cap erector machine 107 may out by means of the process stabilization control computer
be integrated in one machine. 149 using the recorded actual speeds and the selected speed
US 7,136,719 B2
10
V profile, that is to say the individual machines are con operating speeds 407 for process stabilization, as is in each
trolled, with conventional control algorithms being used for case indicated by a vertical arrow 405.
process stabilization, in which case the speeds of the indi As can be seen from FIG. 4, the speeds 407 of the
vidual machines can be changed from the predetermined respective speed profile V profiles 401, 402,403, 404 differ,
nominal speeds (which are stored in the machine on the basis 5 so that it is either possible to speed up or to slow down all
of the selected machine control matrix) as a function of the of the machines in the process line, overall, by varying the
rules which are described in the following text and can be selected operating speed V profiles.
combined in a speed matrix, and the programmable logic In this context, it should be noted that the local control
controllers for the machines can be driven using the changed within a speed profile 401, 402, 403, 404 means that
speeds. 10 overlapping of the actual nominal speed 407 within a
The process stabilization control computer 149 thus selected speed V profile can occur with a nominal speed 407
clearly allows a real-time reaction to instantaneous fault of an adjacent speed V profile.
situations, shortage situations and jam situations in the As described above, the fundamental principle is to pro
individual machines by selection of fixed manipulated vari vide any desired number of stored and selectable speed V
ables corresponding to the respectively optimum selected 15 profiles.
speed V profile. 20 speed V profiles are preferably provided, with one
Furthermore, the simulation computer 153 carries out speed V profile 401, 402, 403, 404 in each case being
simulations of the entire process line to be simulated with
the large number of machines, optionally using the machine provided
maximum
at an interval of in each case five percent from the
operating speed of the machines.
sensor values. The simulation computer 153 clearly carries 20 In an alternative
out a technical simulation of the process line, allowing located in a regionembodiment, within +or
the speed V profiles are
-20% of the respective
reaction well in advance to the statistically protected aligned nominal operating point.
performance of the process line by using the simulator to
create optimization functions, as will be explained in more As is likewise illustrated in FIG. 4, the respectively used
detail in the following text. speed V profile 401, 402, 403, 404 is “shifted” by the
25 process
The process optimization computer 152 uses the deter optimization computer 152 by reselection of the
mined optimization functions to carry out process optimi process optimization carried out. On the basis of the process
Zation processes with the optimum optimization function optimization, it is possible to select the immediately adja
from a large number of previously stored optimization cent speed V profile to a selected speed V profile. Alterna
functions being determined as the result of the process 30 tively, any desired speed V profile can be selected on the
optimization and, via this, with the optimum operating speed basis of the result of the respective process optimization.
V profile on the basis of the respective optimization function A double-headed arrow 406 in FIG. 4 illustrates the
being determined, selected and transmitted to the process process optimization and the respective redefinition and
stabilization control computer 149. This clearly allows reselection of the instantaneously optimum speed V profile
medium-notice reaction to the current trend in the process 35 associated with this.
line performance by presetting an optimum speed profile for The states of a respective machine, in particular the
the process stabilization control computer 149. disturbance determined in the respective machine, which are
According to this exemplary embodiment, the control considered in the course of the exemplary embodiment
process is carried out on the basis of the optimum, selected according to the invention, are explained briefly in the
speed profile in a time period based on seconds, for example 40 following text:
every five seconds. According to this exemplary embodi 1. Disturbance in a Machine:
ment, the process optimization is carried out on the basis of In the case of this event, a machine has completely or
minutes, that is to say for example every 10 minutes. The partially failed, and is thus Subject to a disturbance.
complete simulation of the process line is carried out repeat 2. Main Flow Jam:
edly with a repetition interval of several hours, according to 45 In the case of this event, the machine sensor values are
this exemplary embodiment eight hours. used to determine that there are an excessive number of the
FIG. 4 uses a diagram 400 to show a plurality of machine production items at the output of the respective machine, so
control matrices, with the nominal operating speed 407 of that no further products can be emitted. The threshold value
each machine in the process line being stored in each which leads to an event Such as this, that is to say the number
machine control matrix 401, 402, 403, 404. 50
The nominal operating speeds 407 in each operating of production items which is greater than the number of
products which can be accommodated in the main flow
speed profile 401, 402, 403, 404 are preset according to this downstream from the machine leading to the fault message
exemplary embodiment of the invention on the basis of the can be predetermined freely on a machine-specific basis.
operating speed V profile, as described in 2.
By way of example, FIG. 4 shows five machines 101,104, 55 3. Initial Alarm, Main Flow Jam:
107, 119, 131 in order to simplify the illustration, for each In the case of this event, it is likewise possible to
machine control matrix which, in this exemplary embodi predetermine freely on a machine-specific basis an interme
ment, represents just one vector in whose components the diate threshold value such that, if this intermediate threshold
respective nominal operating speed for each machine is value is exceeded, it is assumed that a jam will occur in the
entered. 60 main flow if the rate at which the production items are
According to the invention, m operating speed V profiles emitted from the machine is not reduced and/or the Supply
401, 402, 403, 404 are provided, where m is any desired rate to the downstream machine is not increased.
number. 4. Jam, Secondary Flow:
As is illustrated symbolically in FIG. 4, local adaptation In the case of this event, a jam is determined via a
of the operating speeds 407 is carried out within a selected 65 secondary output from the machine in the material which is
speed V profile, the second speed V profile 402 by way of emitted from the machine which has a second or further
example in FIG. 4, that is to say local control of the nominal material output as a result of the processing of the actual
US 7,136,719 B2
11 12
production item, for example empty bottle shoes being The operating speed of the cap sorting machine 108 is
carried away in the exemplary embodiment according to the adapted in the following manner when the above events
invention. occur in the bottle erector machine 101:
5. Shortage in the Main Flow: 1. Disturbance, bottle erector machine 101:
In the case of this event, the process determines whether 5 Slow down the cap sorting machine 108;
the machine is being Supplied with too few production items, 2. Jam, main flow, bottle erector machine 101;
so that the machine can no longer operate correctly at its full Speed up the cap sorting machine 108;
load level. This event can be initiated if no production items 3. Initial alarm, jam, main flow, bottle erector machine 101:
are supplied to an input of the main flow of the machine for Speed up the cap sorting machine 108;
a predetermined time period. 10 4. Jam, secondary flow, bottle erector machine 101:
6. Shortage in the Secondary Flow: No speed change;
In the case of this event, the process determines whether 5. Lack of main flow, bottle erector machine 101:
the machine is being supplied with too little secondary flow Slow down the cap sorting machine 108;
material via one of the secondary inputs, so that the machine 6. Lack of secondary flow, bottle erector machine 101:
can no longer operate correctly at its full load level. This 15 Slow down the cap sorting machine 108;
event can be initiated if no secondary flow material is 7. Initial alarm, shortage of main flow, bottle erector
Supplied to an input of a secondary flow to the machine for machine 101:
a predetermined time. No speed change.
7. Initial Alarm, Shortage of Main Flow: The operating speed of the cap aligner machine 107 is
In the case of this event, it is likewise possible to changed in the following manner when the following events
predetermine freely on a machine-specific basis an interme occur in the bottle erector machine 101:
diate threshold value such that, if this intermediate threshold 1. Disturbance, bottle erector machine 101:
value is exceeded, it is assumed that there will be a shortage Same speed as the cap sorting machine 108;
in the main flow if the supply rate of the production items to 2. Jam, main flow, bottle erector machine 101;
the machine is not increased. 25 Same speed as the cap sorting machine 108;
The speed matrix for the individual machines in the 3. Initial alarm, jam, main flow, bottle erector machine 101:
machine arrangement 100 in the course of the process Same speed as the cap sorting machine 108;
stabilization will be described in the following text as a 4. Jam, secondary flow, bottle erector machine 101:
function of the disturbances recorded for the respective No speed change;
machine: 30 5. Lack of main flow, bottle erector machine 101:
The operating speed of the bottle erector machine 101 is Same speed as the cap sorting machine 108;
changed in the following manner when the following events 6. Lack of secondary flow, bottle erector machine 101:
OCCU Same speed as the cap sorting machine 108;
1. Disturbance, bottle erector machine 101: 7. Initial alarm, shortage of main flow, bottle erector
Bottle erector machine 101 is stopped; 35 machine 101:
2. Jam, main flow, bottle erector machine 101: No speed change.
Bottle erector machine 101 is stopped; The operating speed of the bottle closure machine 113 is
3. Initial alarm, jam, main flow, bottle erector machine 101: changed in the following manner when the following events
The bottle erector machine 101 is slowed down; occur in the bottle erector machine 101:
4. Jam, secondary flow, bottle erector machine 101: 40 1. Disturbance, bottle erector machine 101:
No speed change; Slow down the bottle closure machine 113:
5. Shortage of main flow, bottle erector machine 101: 2. Jam, main flow, bottle erector machine 101;
Bottle erector machine 101 is stopped; Speed up the bottle closure machine 113:
6. Shortage, secondary flow, bottle erector machine 101: 3. Initial alarm, jam, main flow, bottle erector machine 101:
Bottle erector machine 101 is stopped; 45 Speed up the bottle closure machine 113:
7. Initial alarm, shortage of main flow, bottle erector 4. Jam, secondary flow, bottle erector machine 101:
machine 101: No speed change;
No speed change; 5. Lack of main flow, bottle erector machine 101:
The operating speed of the filling machine 104 is changed 50
Slow down the bottle closure machine 113:
in the following manner when the following events occur in 6. Lack of secondary flow, bottle erector machine 101:
the bottle erector machine 101: Slow down the bottle closure machine 113:
1. Disturbance, bottle erector machine 101: 7. Initial alarm, shortage of main flow, bottle erector
Same speed as the bottle closure machine 113: machine 101:
2. Jam, main flow, bottle erector machine 101; 55
No speed change.
Same speed as the bottle closure machine 113: The bottle shoe removal machine 115 is changed in the
3. Initial alarm, jam, main flow, bottle erector machine 101: following manner in accordance with the exemplary
Same speed as the bottle closure machine 113: embodiment when the following events occur in the bottle
4. Jam, secondary flow, bottle erector machine 101: erector machine 101:
No speed change; 60 1. Disturbance, bottle erector machine 101:
5. Lack of main flow, bottle erector machine 101: Slow down the bottle shoe removal machine 115;
Same speed as the bottle closure machine 113: 2. Jam, main flow, bottle erector machine 101;
6. Lack of secondary flow, bottle erector machine 101: Speed up the bottle shoe removal machine 115;
Same speed as the bottle closure machine 113: 3. Initial alarm, jam, main flow bottle erector machine 101:
7. Initial alarm, shortage of main flow, bottle erector 65 Speed up the bottle shoe removal machine 115;
machine 101: 4. Jam, secondary flow, bottle erector machine 101:
No speed change. No speed change;
US 7,136,719 B2
13 14
. Lack of main flow, bottle erector machine 101: 6. Shortage in the secondary flow, filling machine 104:
Slow down the bottle shoe removal machine 115; Slow down the bottle erector machine 101;
. Lack of secondary flow, bottle erector machine 101: 7. Initial alarm, shortage in the main flow, filling machine
Slow down the bottle shoe removal machine 115; 104:
Initial alarm, shortage of main flow, bottle erector 5 No speed change.
machine 101: The operating speed of the filling machine 104 is changed
No speed change. in the following manner when the following events occur in
The operating speed of the labeling machine 119 is the filling machine 104:
changed in the following manner when the following events 1. Disturbance in the filling machine 104;
occur in the bottle erector machine 101: 10 Filling machine 104 is stopped;
1. Disturbance, bottle erector machine 101: 2. Jam, main flow, filling machine 104:
Same speed as the bottle shoe removal machine 115; Filling machine 104 is stopped;
2. Jam, main flow, bottle erector machine 101; 3. Initial alarm, jam, main flow, filling machine 104:
Same speed as the bottle shoe removal machine 115; No speed change;
3. Initial alarm, jam, main flow bottle erector machine 101: 15 4. Jam, secondary flow, filling machine 104:
Same speed as the bottle shoe removal machine 115; No speed change;
. Jam, secondary flow, bottle erector machine 101: 5. Shortage in the main flow, filling machine 104:
No speed change; Filling machine 104 is stopped;
. Lack of main flow, bottle erector machine 101: 6. Shortage in the secondary flow, filling machine 104:
Same speed as the bottle shoe removal machine 115. 20 Filling machine 104 is stopped;
. Lack of secondary flow, bottle erector machine 101: 7. Initial alarm, shortage in the main flow, filling machine
Same speed as the bottle shoe removal machine 115; 104:
Initial alarm, shortage of main flow, bottle erector No speed change.
machine 101: The operating speed of the cap sorting machine 108 is
No speed change. 25 changed in the following manner when the following events
There is no speed change to the coding machine 121, the occur in the filling machine 104:
first sticker machine 122 or the second sticker machine 123 1. Disturbance in the filling machine 104;
when the above disturbances occur in the bottle erector Slow down the cap sorting machine 108;
machine 101. 2. Jam, main flow, filling machine 104:
The operating speed of the sheet shrinker machine 126 is 30 Speed up the cap sorting machine 108;
changed in the following manner when the above events 3. Initial alarm, jam, main flow, filling machine 104:
occur in the bottle erector machine 101: No speed change;
1. Disturbance, bottle erector machine 101: 4. Jam, secondary flow, filling machine 104:
Slow down the sheet shrinking machine 126; No speed change;
2. Jam, main flow, bottle erector machine 101; 35 5. Shortage in the main flow, filling machine 104:
Speed up the sheet shrinking machine 126; Slow down the cap sorting machine 108;
3. Initial alarm, jam, main flow bottle erector machine 101: 6. Shortage in the secondary flow, filling machine 104:
Speed up the sheet shrinking machine 126; Slow down the cap sorting machine 108;
. Jam, secondary flow, bottle erector machine 101: 7. Initial alarm, shortage in the main flow, filling machine
No speed change; 40 104:
. Lack of main flow, bottle erector machine 101: No speed change.
Slow down the sheet shrinking machine 126; The operating speed of the cap aligner machine 107 is
. Lack of secondary flow, bottle erector machine 101: changed in the following manner when the following events
Slow down the sheet shrinking machine 126; occur in the filling machine 104:
Initial alarm, shortage of main flow, bottle erector 45 1. Disturbance in the filling machine 104;
machine 101: Same speed as the cap sorting machine 108;
No speed change. 2. Jam, main flow, filling machine 104:
The operating speeds of the remaining machines 128, 129, Same speed as the cap sorting machine 108;
131, 132, 136, 139,142 and 145 remain unchanged when the 50 3. Initial alarm, jam, main flow, filling machine 104:
above events occur in the bottle erector machine 101. No speed change;
The change in the operating speeds when the following 4. Jam, secondary flow, filling machine 104:
events occur in the filling machine 104 will be explained in No speed change;
more detail in the following text. 5. Shortage in the main flow, filling machine 104:
The operating speed of the bottle erector machine 101 is 55 Same speed as the cap sorting machine 108;
changed in the following manner when the following events 6. Shortage in the secondary flow, filling machine 104:
occur in the filling machine 104: Same speed as the cap sorting machine 108;
1. Disturbance in the filling machine 104; 7. Initial alarm, shortage in the main flow, filling machine
Slow down the bottle erector machine 101; 104:
2. Jam, main flow, filling machine 104: 60 No speed change.
Slow down the bottle erector machine 101; The operating speed of the bottle closure machine 113 is
3. Initial alarm, jam, main flow, filling machine 104: changed in the following manner when the following events
No speed change; occur in the filling machine 104:
. Jam, secondary flow, filling machine 104: 1. Disturbance in the filling machine 104;
No speed change; 65 Slow down the bottle closure machine 113:
. Shortage in the main flow, filling machine 104: 2. Jam, main flow, filling machine 104:
Speed up the bottle erector machine 101; Speed up the bottle closure machine 113:
US 7,136,719 B2
15 16
3. Initial alarm, jam, main flow, filling machine 104: 7. Initial alarm, shortage in the main flow, filling machine
No speed change; 104:
4. Jam, secondary flow, filling machine 104: No speed change.
No speed change; The operating speed of the other machines 128, 129, 131,
5. Shortage in the main flow, filling machine 104: 5 132, 136, 139, 142 and 145 remains unchanged when the
Slow down the bottle closure machine 113: above events occur in the filling machine 104.
6. Shortage in the secondary flow, filling machine 104: The change to the operating speeds of the machines when
Slow down the bottle closure machine 113: the following events occur in the cap sorting machine 108
7. Initial alarm, shortage in the main flow, filling machine will be described in more detail in the following text.
104: 10 The operating speed of the bottle erector machine 101 is
No speed change. changed in the following manner when the following events
The operating speed of the bottle shoe removal machine occur in the cap sorting machine 108:
115 is changed in the following manner when the following 1. Disturbance, cap sorting machine 108:
events occur in the filling machine 104: Slow down the bottle erector machine 101;
1. Disturbance in the filling machine 104; 15
2. Jam, main flow, cap sorting machine 108:
Slow down the bottle shoe removal machine 115; Speed up the bottle erector machine 101;
2. Jam, main flow, filling machine 104: 3. Initial alarm, jam, main flow, cap sorting machine 108:
Speed up the bottle shoe removal machine 115; Speed up the bottle erector machine 101;
3. Initial alarm, jam, main flow, filling machine 104: 4. Jam, secondary flow, cap sorting machine 108:
No speed change; No speed change;
4. Jam, secondary flow, filling machine 104:
No speed change; 5. Shortage of main flow, cap sorting machine 108:
5. Shortage in the main flow, filling machine 104: Slow down the bottle erector machine 101;
Slow down the bottle shoe removal machine 115; 6. Shortage of secondary flow, cap sorting machine 108:
6. Shortage in the secondary flow, filling machine 104: 25 No speed change;
Slow down the bottle shoe removal machine 115; 7. Initial alarm, shortage of main flow, cap sorting machine
7. Initial alarm, shortage in the main flow, filling machine 108:
104: No speed change.
No speed change. The operating speed of the filling machine 104 is changed
The operating speed of the labeling machine 119 is 30 in the following manner when the following events occur in
changed in the following manner when the following events the cap sorting machine 108:
occur in the filling machine 104: 1. Disturbance, cap sorting machine 108:
1. Disturbance in the filling machine 104; Same speed as the bottle closure machine 113:
Same speed as the bottle shoe removal machine 115; 2. Jam, main flow, cap sorting machine 108:
2. Jam, main flow, filling machine 104: 35
Same speed as the bottle closure machine 113:
Same speed as the bottle shoe removal machine 115; 3. Initial alarm, jam, main flow, cap sorting machine 108:
3. Initial alarm, jam, main flow, filling machine 104:
No speed change; Same speed as the bottle closure machine 113:
4. Jam, secondary flow, filling machine 104: 4. Jam, secondary flow, cap sorting machine 108:
No speed change; 40 No speed change;
5. Shortage in the main flow, filling machine 104: 5. Shortage of main flow, cap sorting machine 108:
Same speed as the bottle shoe removal machine 115; Same speed as the bottle closure machine 113:
6. Shortage in the secondary flow, filling machine 104: 6. Shortage of secondary flow, cap sorting machine 108:
Same speed as the bottle shoe removal machine 115; No speed change;
45
7. Initial alarm, shortage in the main flow, filling machine 7. Initial alarm, shortage of main flow, cap sorting machine
104: 108:
No speed change. No speed change.
The operating speed of the coding machine 121 and of the The operating speed of the cap sorting machine 108 is
first sticker machine 122 as well as the second sticker changed in the following manner when the following events
50
machine 123 remains unchanged when all of the above occur in the cap sorting machine 108:
events occur in the filling machine 104. 1. Disturbance, cap sorting machine 108:
The operating speed of the sheet shrinker machine 126 is Cap Sorting machine 108 is stopped;
changed in the following manner when the following events 2. Jam, main flow, cap sorting machine 108:
occur in the filling machine 104: 55 Cap Sorting machine 108 is stopped;
1. Disturbance in the filling machine 104;
Slow down the sheet shrinker machine 126; 3. Initial alarm, jam, main flow, cap sorting machine 108:
2. Jam, main flow, filling machine 104: Slow down the cap sorting machine 108;
Speed up the sheet shrinker machine 126; 4. Jam, secondary flow, cap sorting machine 108:
3. Initial alarm, jam, main flow, filling machine 104: 60
No speed change;
No speed change; 5. Shortage of main flow, cap sorting machine 108:
4. Jam, secondary flow, filling machine 104: Speed up the cap sorting machine 108;
No speed change; 6. Shortage of secondary flow, cap sorting machine 108:
5. Shortage in the main flow, filling machine 104: No speed change;
Slow down the sheet shrinker machine 126; 65 7. Initial alarm, shortage of main flow, cap sorting machine
6. Shortage in the secondary flow, filling machine 104: 108:
Slow down the sheet shrinker machine 126; No speed change.
US 7,136,719 B2
17 18
The operating speed of the cap aligner machine 107 is 6. Shortage of secondary flow, cap sorting machine 108:
changed in the following manner when the following events No speed change;
occur in the cap sorting machine 108: 7. Initial alarm, shortage of main flow, cap sorting machine
1. Disturbance, cap sorting machine 108: 108:
Same speed as the cap sorting machine 108; No speed change.
2. Jam, main flow, cap sorting machine 108: The operating speeds of the coding machine 121, of the
Same speed as the cap sorting machine 108; first sticker machine 122 and of the second sticker machine
3. Initial alarm, jam, main flow, cap sorting machine 108: 123 remain unchanged when the above events occur in the
Same speed as the cap sorting machine 108; cap sorting machine 108.
4. Jam, secondary flow, cap sorting machine 108: 10 The operating speed of the sheet shrinker machine 126 is
No speed change; changed in the following manner when the following events
5. Shortage of main flow, cap sorting machine 108: occur in the cap sorting machine 108:
Same speed as the cap sorting machine 108; 1. Disturbance, cap sorting machine 108:
6. Shortage of secondary flow, cap sorting machine 108: Slow down the sheet shrinker machine 126;
No speed change; 15 2. Jam, main flow, cap sorting machine 108:
7. Initial alarm, shortage of main flow, cap sorting machine Speed up the sheet shrinker machine 126;
108: 3. Initial alarm, jam, main flow, cap sorting machine 108:
No speed change. Speed up the sheet shrinker machine 126;
The operating speed of the bottle closure machine 113 is 4. Jam, secondary flow, cap sorting machine 108:
changed in the following manner when the following events No speed change;
occur in the cap sorting machine 108: 5. Shortage of main flow, cap sorting machine 108:
1. Disturbance, cap sorting machine 108: Slow down the sheet shrinker machine 126;
Slow down the bottle closure machine 113: 6. Shortage of secondary flow, cap sorting machine 108:
2. Jam, main flow, cap sorting machine 108: No speed change;
Speed up the bottle closure machine 113: 25 7. Initial alarm, shortage of main flow, cap sorting machine
3. Initial alarm, jam, main flow, cap sorting machine 108: 108:
Speed up the bottle closure machine 113: No speed change.
4. Jam, secondary flow, cap sorting machine 108: The operating speeds of the other machines 128, 129, 131,
No speed change; 132, 136, 139, 142 and 145 remain unchanged when the
5. Shortage of main flow, cap sorting machine 108: 30 above events occur in the cap sorting machine 108.
Slow down the bottle closure machine 113: The changes in the operating speeds of the machines in
6. Shortage of secondary flow, cap sorting machine 108: the process line when the following events occur in the cap
No speed change; aligner machine 107 will be explained in more detail in the
7. Initial alarm, shortage of main flow, cap sorting machine following text.
108: 35 The operating speed of the bottle erector machine 101 is
No speed change. changed in the following manner when the following events
The operating speed of the bottle shoe removal machine occur in the cap aligner machine 107:
115 is changed in the following manner when the following 1. Disturbance, cap aligner machine 107:
events occur in the cap sorting machine 108: Slow down the bottle erector machine 101;
1. Disturbance, cap sorting machine 108: 40 2. Jam, main flow, cap aligner machine 107:
Slow down the bottle shoe removal machine 115; No speed change;
2. Jam, main flow, cap sorting machine 108: 3. Initial alarm, jam, main flow, cap aligner machine 107:
Speed up the bottle shoe removal machine 115; No speed change;
3. Initial alarm, jam, main flow, cap sorting machine 108: 4. Jam, secondary flow, cap aligner machine 107:
Speed up the bottle shoe removal machine 115; 45 No speed change;
4. Jam, secondary flow, cap sorting machine 108: 5. Shortage of main flow, cap aligner machine 107:
No speed change; Slow down the bottle erector machine 101;
5. Shortage of main flow, cap sorting machine 108: 6. Shortage of secondary flow, cap aligner machine 107:
Slow down the bottle shoe removal machine 115; No speed change;
6. Shortage of secondary flow, cap sorting machine 108: 50 7. Initial alarm, shortage of main flow, cap aligner machine
No speed change; 107:
7. Initial alarm, shortage of main flow, cap sorting machine No speed change.
108: The operating speed of the filling machine 104 is changed
No speed change. in the following manner when the following events occur in
The operating speed of the labeling machine 119 is 55 the cap aligner machine 107:
changed in the following manner when the following events 1. Disturbance, cap aligner machine 107:
occur in the cap sorting machine 108: Same speed as the bottle closure machine 113:
1. Disturbance, cap sorting machine 108: 2. Jam, main flow, cap aligner machine 107:
Same speed as the bottle shoe removal machine 115; No speed change;
2. Jam, main flow, cap sorting machine 108: 60 3. Initial alarm, jam, main flow, cap aligner machine 107:
Same speed as the bottle shoe removal machine 115; No speed change;
3. Initial alarm, jam, main flow, cap sorting machine 108: 4. Jam, secondary flow, cap aligner machine 107:
Same speed as the bottle shoe removal machine 115; No speed change;
4. Jam, secondary flow, cap sorting machine 108: 5. Shortage of main flow, cap aligner machine 107:
No speed change; 65 Same speed as the bottle closure machine 113:
5. Shortage of main flow, cap sorting machine 108: 6. Shortage of secondary flow, cap aligner machine 107:
Same speed as the bottle shoe removal machine 115; No speed change;
US 7,136,719 B2
19 20
7. Initial alarm, shortage of main flow, cap aligner machine 4. Jam, secondary flow, cap aligner machine 107:
107: No speed change;
No speed change. 5. Shortage of main flow, cap aligner machine 107:
The operating speed of the cap sorting machine 108 is Slow down the bottle shoe removal machine 115;
changed in the following manner when the following events 5 6. Shortage of secondary flow, cap aligner machine 107:
occur in the cap aligner machine 107: No speed change;
1. Disturbance, cap aligner machine 107: 7. Initial alarm, shortage of main flow, cap aligner machine
Slow down the cap sorting machine 108; 107:
2. Jam, main flow, cap aligner machine 107: No speed change.
No speed change; 10 The operating speed of the labeling machine 119 is
3. Initial alarm, jam, main flow, cap aligner machine 107: changed in the following manner when the following events
No speed change; occur in the cap aligner machine 107:
4. Jam, secondary flow, cap aligner machine 107: 1. Disturbance, cap aligner machine 107:
No speed change; Same speed as the bottle shoe removal machine 115;
5. Shortage of main flow, cap aligner machine 107: 15 2. Jam, main flow, cap aligner machine 107:
Slow down the cap sorting machine 108; No speed change;
6. Shortage of secondary flow, cap aligner machine 107: 3. Initial alarm, jam, main flow, cap aligner machine 107:
No speed change; No speed change;
7. Initial alarm, shortage of main flow, cap aligner machine 4. Jam, secondary flow, cap aligner machine 107:
107: No speed change;
No speed change. 5. Shortage of main flow, cap aligner machine 107:
The operating speed of the cap aligner machine 107 is Same speed as the bottle shoe removal machine 115;
changed in the following manner when the following events 6. Shortage of secondary flow, cap aligner machine 107:
occur in the cap aligner machine 107: No speed change;
1. Disturbance, cap aligner machine 107: 25 7. Initial alarm, shortage of main flow, cap aligner machine
Cap aligner machine 107 is stopped; 107:
2. Jam, main flow, cap aligner machine 107: No speed change.
No speed change; The operating speeds of the coding machine 121, the first
3. Initial alarm, jam, main flow, cap aligner machine 107: sticker machine 122 and the second sticker machine 123
No speed change; 30 remain unchanged when the above events occur in the cap
4. Jam, secondary flow, cap aligner machine 107: aligner machine 107.
No speed change; The operating speed of the sheet shrinker machine 126 is
5. Shortage of main flow, cap aligner machine 107: changed in the following manner when the following events
Speed up the cap aligner machine 107; occur in the cap aligner machine 107.
6. Shortage of secondary flow, cap aligner machine 107: 35 1. Disturbance, cap aligner machine 107:
No speed change; Slow down the sheet shrinker machine 126;
7. Initial alarm, shortage of main flow, cap aligner machine 2. Jam, main flow, cap aligner machine 107:
107: No speed change;
No speed change. 3. Initial alarm, jam, main flow, cap aligner machine 107:
The operating speed of the bottle closure machine 113 is 40 No speed change;
changed in the following manner when the following events 4. Jam, secondary flow, cap aligner machine 107:
occur in the cap aligner machine 107: No speed change;
1. Disturbance, cap aligner machine 107: 5. Shortage of main flow, cap aligner machine 107:
Slow down the bottle closure machine 113: Slow down the sheet shrinker machine 126;
2. Jam, main flow, cap aligner machine 107: 45 6. Shortage of secondary flow, cap aligner machine 107:
No speed change; No speed change;
3. Initial alarm, jam, main flow, cap aligner machine 107: 7. Initial alarm, shortage of main flow, cap aligner machine
No speed change; 107:
4. Jam, secondary flow, cap aligner machine 107: No speed change.
No speed change; 50 The operating speeds of the other machines 128, 129, 131,
5. Shortage of main flow, cap aligner machine 107: 132, 136, 139, 142, 145 in the process line remain
Slow down the bottle closure machine 113: unchanged when the above events occur in the cap aligner
machine 107.
6. Shortage of secondary flow, cap aligner machine 107: Changes to the operating speeds of the machines when the
No speed change; 55 following events occur in the bottle closure machine 113
7. Initial alarm, shortage of main flow, cap aligner machine will be explained in detail in the following text.
107:
No speed change. The operating speed of the bottle erector machine 101 is
changed in the following manner when the following events
The operating speed of the bottle shoe removal machine occur in the bottle closure machine 113:
115 is changed in the following manner when the following 60 1. Disturbance, bottle closure machine 113:
events occur in the cap aligner machine 107: Slow down the bottle erector machine 101;
1. Disturbance, cap aligner machine 107: 2. Jam, main flow, bottle closure machine 113:
Slow down the bottle shoe removal machine 115; Slow down the bottle erector machine 101;
2. Jam, main flow, cap aligner machine 107: 3. Initial alarm, jam, main flow, bottle closure machine 113:
No speed change; 65 No speed change;
3. Initial alarm, jam, main flow, cap aligner machine 107: 4. Jam, secondary flow, bottle closure machine 113:
No speed change; Slow down the bottle erector machine 101;
US 7,136,719 B2
21 22
5. Shortage of main flow, bottle closure machine 113: 2. Jam, main flow, bottle closure machine 113:
Speed up the bottle erector machine 101; Bottle closure machine 113 is stopped;
6. Shortage of secondary flow, bottle closure machine 113: 3. Initial alarm, jam, main flow, bottle closure machine 113:
Slow down the bottle erector machine 101; No speed change;
7. Initial alarm, shortage of main flow, bottle closure 5 4. Jam, secondary flow, bottle closure machine 113:
machine 113: Bottle closure machine 113 is stopped;
Speed up the bottle erector machine 101. 5. Shortage of main flow, bottle closure machine 113:
The operating speed of the filling machine 104 is changed Bottle closure machine 113 is stopped;
in the following manner when the following events occur in 6. Shortage of secondary flow, bottle closure machine 113:
the bottle closure machine 113: 10 Bottle closure machine 113 is stopped;
1. Disturbance, bottle closure machine 113: 7. Initial alarm, shortage of main flow, bottle closure
Same speed as the bottle closure machine 113: machine 113:
2. Jam, main flow, bottle closure machine 113: Slow down the bottle closure machine 113.
Same speed as the bottle closure machine 113: The bottle shoe removal machine 115 is changed in the
3. Initial alarm, jam, main flow, bottle closure machine 113: 15 following manner when the following events occur in the
No speed change; bottle closure machine 113:
4. Jam, secondary flow, bottle closure machine 113: 1. Disturbance, bottle closure machine 113:
Same speed as the bottle closure machine 113: Slow down the bottle shoe removal machine 115;
5. Shortage of main flow, bottle closure machine 113: 2. Jam, main flow, bottle closure machine 113:
Same speed as the bottle closure machine 113: Speed up the bottle shoe removal machine 115;
6. Shortage of secondary flow, bottle closure machine 113: 3. Initial alarm, jam, main flow, bottle closure machine 113:
Same speed as the bottle closure machine 113: No speed change;
7. Initial alarm, shortage of main flow, bottle closure 4. Jam, secondary flow, bottle closure machine 113:
machine 113: Speed up the bottle shoe removal machine 115;
Same speed as the bottle closure machine 113. 25 5. Shortage of main flow, bottle closure machine 113:
The operating speed of the cap sorting machine 108 is Slow down the bottle shoe removal machine 115;
changed in the following manner when the following events 6. Shortage of secondary flow, bottle closure machine 113:
occur in the bottle closure machine 113: Slow down the bottle shoe removal machine 115;
1. Disturbance, bottle closure machine 113: 7. Initial alarm, shortage of main flow, bottle closure
Slow down the cap sorting machine 108; 30 machine 113:
2. Jam, main flow, bottle closure machine 113: Slow down the bottle shoe removal machine 115.
Slow down the cap sorting machine 108; The operating speed of the labeling machine 119 is
3. Initial alarm, jam, main flow, bottle closure machine 113: changed in the following manner when the following events
No speed change; occur in the bottle closure machine 113:
4. Jam, secondary flow, bottle closure machine 113: 35 1. Disturbance, bottle closure machine 113:
Slow down the cap sorting machine 108; Same speed as the bottle shoe removal machine 115;
5. Shortage of main flow, bottle closure machine 113: 2. Jam, main flow, bottle closure machine 113:
Slow down the cap sorting machine 108; Same speed as the bottle shoe removal machine 115;
6. Shortage of secondary flow, bottle closure machine 113: 3. Initial alarm, jam, main flow, bottle closure machine 113:
Speed up the cap sorting machine 108; 40 No speed change;
7. Initial alarm, shortage of main flow, bottle closure 4. Jam, secondary flow, bottle closure machine 113:
machine 113: Same speed as the bottle shoe removal machine 115;
Slow down the cap sorting machine 108. 5. Shortage of main flow, bottle closure machine 113:
The operating speed of the cap aligner machine 107 is Same speed as the bottle shoe removal machine 115;
changed in the following manner when the following events 45
6. Shortage of secondary flow, bottle closure machine 113:
occur in the bottle closure machine 113: Same speed as the bottle shoe removal machine 115;
1. Disturbance, bottle closure machine 113: 7. Initial alarm, shortage of main flow, bottle closure
Same speed as the cap sorting machine 108; machine 113:
2. Jam, main flow, bottle closure machine 113: 50
Same speed as the bottle shoe removal machine 115.
Same speed as the cap sorting machine 108; The operating speeds of the coding machine 121 and of
3. Initial alarm, jam, main flow, bottle closure machine 113: the first sticker machine 122 as well as the second sticker
No speed change; machine 123 remain unchanged when the above events
4. Jam, secondary flow, bottle closure machine 113: occur in the bottle closure machine 113.
Same speed as the cap sorting machine 108; 55
The operating speed of the sheet shrinker machine 126 is
5. Shortage of main flow, bottle closure machine 113: changed in the following manner when the following events
Same speed as the cap sorting machine 108; occur in the bottle closure machine 113:
6. Shortage of secondary flow, bottle closure machine 113: 1. Disturbance, bottle closure machine 113:
Same speed as the cap sorting machine 108; Slow down the sheet shrinker machine 126;
7. Initial alarm, shortage of main flow, bottle closure 60 2. Jam, main flow, bottle closure machine 113:
machine 113: Speed up the sheet shrinker machine 126;
Same speed as the cap sorting machine 108. 3. Initial alarm, jam, main flow, bottle closure machine 113:
The operating speed of the bottle closure machine 113 is No speed change;
changed in the following manner when the following events 4. Jam, secondary flow, bottle closure machine 113:
occur in the bottle closure machine 113: 65 Speed up the sheet shrinker machine 126;
1. Disturbance, bottle closure machine 113: 5. Shortage of main flow, bottle closure machine 113:
Bottle closure machine 113 is stopped; Slow down the sheet shrinker machine 126;
US 7,136,719 B2
23 24
6. Shortage of secondary flow, bottle closure machine 113: 3. Initial alarm, jam, main flow, bottle shoe removal machine
Slow down the sheet shrinker machine 126; 115:
7. Initial alarm, shortage of main flow, bottle closure Slow down the cap sorting machine 108;
machine 113: 4. Jam, secondary flow, bottle shoe removal machine 115:
Slow down the sheet shrinker machine 126. Slow down the cap sorting machine 108;
The operating speeds of the other machines 128, 129, 131, 5. Initial alarm, secondary flow, bottle shoe removal
132, 136, 139, 142 and 145 contained in the process line machine 115:
remain unchanged when the above events occur in the bottle Slow down the cap sorting machine 108;
closure machine 113. 6. Shortage of main flow, bottle shoe removal machine 115:
The change to the operating speeds of the individual 10 Speed up the cap sorting machine 108;
machines in the process line when the following events 7. Shortage of secondary flow, bottle shoe removal machine
occur in the bottle shoe removal machine 115 will be 115:
explained in detail in the following text. No speed change;
The operating speed of the bottle erector machine 101 is 8.Initial alarm, shortage of main flow, bottle shoe removal
changed in the following manner when the following events 15 machine 115:
occur in the bottle shoe removal machine 115: Speed up the cap sorting machine 108.
1. Disturbance, bottle shoe removal machine 115: The operating speed of the cap aligner machine 107 is
Slow down the bottle erector machine 101; changed in the following manner when the following events
2. Jam, main flow, bottle shoe removal machine 115: occur in the bottle shoe removal machine 115:
Slow down the bottle erector machine 101; 1. Disturbance, bottle shoe removal machine 115:
3. Initial alarm, jam, main flow, bottle shoe removal machine Same speed as the cap sorting machine 108;
115: 2. Jam, main flow, bottle shoe removal machine 115:
Slow down the bottle erector machine 101; Same speed as the cap sorting machine 108;
4. Jam, secondary flow, bottle shoe removal machine 115: 3. Initial alarm, jam, main flow, bottle shoe removal machine
Speed up the bottle erector machine 101; 25 115:
5. Initial alarm, secondary flow, bottle shoe removal Same speed as the cap sorting machine 108;
machine 115: 4. Jam, secondary flow, bottle shoe removal machine 115:
Speed up the bottle erector machine 101; Same speed as the cap sorting machine 108;
6. Shortage of main flow, bottle shoe removal machine 115: 5. Initial alarm, secondary flow, bottle shoe removal
Speed up the bottle erector machine 101; 30 machine 115:
7. Shortage of secondary flow, bottle shoe removal machine Same speed as the cap sorting machine 108;
115: 6. Shortage of main flow, bottle shoe removal machine 115:
No speed change; Same speed as the cap sorting machine 108;
8. Initial alarm, shortage of main flow, bottle shoe removal 7. Shortage of secondary flow, bottle shoe removal machine
machine 115: 35 115:
Speed up the bottle erector machine 101. No speed change;
The operating speed of the filling machine 104 is changed 8.Initial alarm, shortage of main flow, bottle shoe removal
in the following manner when the following events occur in machine 115:
the bottle shoe removal machine 115: Same speed as the cap sorting machine 108.
1. Disturbance, bottle shoe removal machine 115: 40 The operating speed of the bottle closure machine 113 is
Same speed as the bottle closure machine 113: changed in the following manner when the following events
2. Jam, main flow, bottle shoe removal machine 115. occur in the bottle shoe removal machine 115:
Same speed as the bottle closure machine 113: 1. Disturbance, bottle shoe removal machine 115:
3. Initial alarm, jam, main flow, bottle shoe removal machine Slow down the bottle closure machine 113:
115: 45 2. Jam, main flow, bottle shoe removal machine 115:
Same speed as the bottle closure machine 113: Slow down the bottle closure machine 113:
4. Jam, secondary flow, bottle shoe removal machine 115: 3. Initial alarm, jam, main flow, bottle shoe removal machine
115:
Same speed as the bottle closure machine 113:
5. Initial alarm, secondary flow, bottle shoe removal Slow down the bottle closure machine 113:
machine 115: 50 4. Jam, secondary flow, bottle shoe removal machine 115:
Same speed as the bottle closure machine 113: Slow down the bottle closure machine 113:
6. Shortage of main flow, bottle shoe removal machine 115: 5. Initial alarm, secondary flow, bottle shoe removal
machine 115:
Same speed as the bottle closure machine 113: Slow down the bottle closure machine 113:
7. Shortage of secondary flow, bottle shoe removal machine 55 6. Shortage of main flow, bottle shoe removal machine 115:
115:
No speed change; Speed up the bottle closure machine 113:
7. Shortage of secondary flow, bottle shoe removal machine
8.Initial alarm, shortage of main flow, bottle shoe removal 115:
machine 115: No speed change;
Same speed as the bottle closure machine 113. 60 8.Initial alarm, shortage of main flow, bottle shoe removal
The operating speed of the cap sorting machine 108 is machine 115:
changed in the following manner when the following events Speed up the bottle closure machine 113.
occur in the bottle shoe removal machine 115: The operating speed of the bottle shoe removal machine
1. Disturbance, bottle shoe removal machine 115: 115 is changed in the following manner when the following
Slow down the cap sorting machine 108; 65 events occur in the bottle shoe removal machine 115:
2. Jam, main flow, bottle shoe removal machine 115: 1. Disturbance, bottle shoe removal machine 115:
Slow down the cap sorting machine 108; Bottle shoe removal machine 115 is stopped;
US 7,136,719 B2
25 26
2. Jam, main flow, bottle shoe removal machine 115: 8.Initial alarm, shortage of main flow, bottle shoe removal
Bottle shoe removal machine 115 is stopped; machine 115:
3. Initial alarm, jam, main flow, bottle shoe removal machine Slow down the sheet shrinker machine 126.
115: The operating speeds of the other machines 128, 129, 131,
Slow down the bottle shoe removal machine 115; 5 132, 136, 139, 142 and 145 remain unchanged when the
4. Jam, secondary flow, bottle shoe removal machine 115: above events occur in the bottle shoe removal machine 115.
Bottle shoe removal machine 115 is stopped; The change to the operating speed of the individual
5. Initial alarm, secondary flow, bottle shoe removal machines in the process line when the following events
machine 115: occur in the labeling machine 119 will be explained in detail
Slow down the bottle shoe removal machine 115; 10 in the following text.
6. Shortage of main flow, bottle shoe removal machine 115: The operating speed of the bottle erector machine 101 is
Bottle shoe removal machine 115 is stopped; changed in the following manner when the following events
7. Shortage of secondary flow, bottle shoe removal machine occur in the labeling machine 119:
115: 1. Disturbance, labeling machine 119:
No speed change; 15 Slow down the bottle erector machine 101;
8.Initial alarm, shortage of main flow, bottle shoe removal 2. Jam, main flow, labeling machine 119:
machine 115: No speed change;
Slow down the bottle shoe removal machine 115. 3. Initial alarm, jam, main flow, labeling machine 119:
The operating speed of the labeling machine 119 is 4. No Jam,
speed change;
secondary flow, labeling machine 119:
changed in the following manner when the following events 2O No speed change;
occur in the bottle shoe removal machine 115:
1. Disturbance, bottle shoe removal machine 115: 5. Shortage of main flow, labeling machine 119:
No speed change;
Same speed as the bottle shoe removal machine 115; 6. Shortage of secondary flow, labeling machine 119:
2. Jam, main flow, bottle shoe removal machine 115: 25 Slow down the bottle erector machine 101;
Same speed as the bottle shoe removal machine 115; 7. Initial alarm, shortage of main flow, labeling machine 119:
3. Initial alarm, jam, main flow, bottle shoe removal machine No speed change.
115: The operating speed of the filling machine 104 is changed
Same speed as the bottle shoe removal machine 115; in the following manner when the following events occur in
4. Jam, secondary flow, bottle shoe removal machine 115: 30 the labeling machine 119:
Same speed as the bottle shoe removal machine 115; 1. Disturbance, labeling machine 119:
5. Initial alarm, secondary flow, bottle shoe removal Same speed as the bottle closure machine 113:
machine 115: 2. Jam, main flow, labeling machine 119:
Same speed as the bottle shoe removal machine 115; No speed change;
6. Shortage of main flow, bottle shoe removal machine 115: 35 3. Initial alarm, jam, main flow, labeling machine 119:
Same speed as the bottle shoe removal machine 115; No speed change;
7. Shortage of secondary flow, bottle shoe removal machine 4. Jam, secondary flow, labeling machine 119:
115: No speed change;
No speed change; 5. Shortage of main flow, labeling machine 119:
8.Initial alarm, shortage of main flow, bottle shoe removal 40 No speed change;
machine 115: 6. Shortage of secondary flow, labeling machine 119:
Same speed as the bottle shoe removal machine 115. Same speed as the bottle closure machine 113:
The operating speeds of the coding machine 121 and of 7. Initial alarm, shortage of main flow, labeling machine 119:
the first sticker machine 122 as well as the second sticker No speed change.
machine 123 remain unchanged when the above events The operating speed of the cap sorting machine 108 is
occur in the bottle shoe removal machine 115. changed in the following manner when the following events
The operating speed of the sheet shrinker machine 126 is occur in the labeling machine 119:
changed in the following manner when the following events 1. Disturbance, labeling machine 119:
occur in the bottle shoe removal machine 115: Slow down the cap sorting machine 118:
1. Disturbance, bottle shoe removal machine 115: 50 2. Jam, main flow, labeling machine 119:
Slow down the sheet shrinker machine 126; No speed change;
2. Jam, main flow, bottle shoe removal machine 115; 3. Initial alarm, jam, main flow, labeling machine 119:
Speed up the sheet shrinker machine 126; No speed change;
3. Initial alarm, jam, main flow, bottle shoe removal machine 55 4. Jam, secondary flow, labeling machine 119:
115; No speed change;
Speed up the sheet shrinker machine 126; 5. Shortage of main flow, labeling machine 119:
4. Jam, secondary flow, bottle shoe removal machine 115: No speed change;
Slow down the sheet shrinker machine 126; 6. Shortage of secondary flow, labeling machine 119:
5. Initial alarm, secondary flow, bottle shoe removal go Slow down the cap sorting machine 108;
machine 115: 7. Initial alarm, shortage of main flow, labeling machine 119:
Slow down the sheet shrinker machine 126; No speed change.
6. Shortage of main flow, bottle shoe removal machine 115: The operating speed of the cap aligner machine 107 is
Slow down the sheet shrinker machine 126; changed in the following manner when the following events
7. Shortage of secondary flow, bottle shoe removal machine 65 occur in the labeling machine 119:
115: 1. Disturbance, labeling machine 119:
No speed change; Same speed as the cap sorting machine 108;
US 7,136,719 B2
27 28
2. Jam, main flow, labeling machine 119: The operating speed of the sheet shrinker machine 126 is
No speed change; changed in the following manner when the following events
3. Initial alarm, jam, main flow, labeling machine 119: occur in the labeling machine 119:
No speed change; 1. Disturbance, labeling machine 119:
4. Jam, secondary flow, labeling machine 119: Slow down the sheet shrinker machine 126;
No speed change; 2. Jam, main flow, labeling machine 119:
5. Shortage of main flow, labeling machine 119: No speed change;
No speed change; 3. Initial alarm, jam, main flow, labeling machine 119:
6. Shortage of secondary flow, labeling machine 119: No speed change;
Same speed as the cap sorting machine 108; 10 4. Jam, secondary flow, labeling machine 119:
7. Initial alarm, shortage of main flow, labeling machine 119: No speed change;
No speed change. 5. Shortage of main flow, labeling machine 119:
The operating speed of the bottle closure machine 113 is No speed change;
changed in the following manner when the following events 6. Shortage of secondary flow, labeling machine 119:
occur in the labeling machine 119: 15 Slow down the sheet shrinker machine 126;
1. Disturbance, labeling machine 119: 7. Initial alarm, shortage of main flow, labeling machine 119:
Slow down the bottle closure machine 113: No speed change.
2. Jam, main flow, labeling machine 119: The operating speeds of the other machines 128, 129, 131,
No speed change; 132, 136, 139, 142 and 145 in the process line remain
3. Initial alarm, jam, main flow, labeling machine 119: unchanged when the above events occur in the labeling
No speed change; machine 119.
4. Jam, secondary flow, labeling machine 119: If a disturbance occurs in the coding machine 121, the
No speed change; speed of the individual machines is changed in the following
5. Shortage of main flow, labeling machine 119: al
No speed change; 25 the bottle erector machine 101 is slowed down;
6. Shortage of secondary flow, labeling machine 119: the filling machine 104 is operated at the same speed as
Slow down the bottle closure machine 113: the bottle closure machine 113:
7. Initial alarm, shortage of main flow, labeling machine 119: the cap sorting machine 108 is slowed down;
No speed change. the cap aligner machine 107 is operated at the same speed
The operating speed of the bottle shoe removal machine 30 as the cap sorting machine 108;
115 is changed in the following manner when the following the bottle closure machine 113 is slowed down;
events occur in the labeling machine 119: the bottle shoe removal machine 115 is stopped;
1. Disturbance, labeling machine 119: the labeling machine 119 is stopped;
Bottle shoe removal machine 115 is stopped; the coding machine 121 is stopped;
2. Jam, main flow, labeling machine 119: 35 the sheet shrinker machine 126 is slowed down;
No speed change; the operating speeds of the other machines 122, 123, 128,
3. Initial alarm, jam, main flow, labeling machine 119: 129, 131, 132, 136, 139, 142 and 145 remain unchanged.
No speed change; The operating speeds of all the machines in the process
4. Jam, secondary flow, labeling machine 119: line remain unchanged in response to all of the other events
No speed change; 40 which occur in the coding machine 121.
5. Shortage of main flow, labeling machine 119: The operating speed of the machines in the process line is
No speed change; changed as follows when a disturbance occurs in the first
6. Shortage of secondary flow, labeling machine 119: sticker machine 122:
Bottle shoe removal machine 115 is stopped; the bottle erector machine 101 is slowed down;
7. Initial alarm, shortage of main flow, labeling machine 119: 45 the filling machine 104 is operated at the same speed as
No speed change. the bottle closure machine 113:
The operating speed of the labeling machine 119 is the cap sorting machine 108 is slowed down;
changed in the following manner when the following events the cap aligner machine 107 is operated at the same speed
occur in the labeling machine 119: as the cap sorting machine 108;
1. Disturbance, labeling machine 119: 50 the bottle closure machine 113 is slowed down;
Labeling machine 119 is stopped; the bottle shoe removal machine 115 is slowed down;
2. Jam, main flow, labeling machine 119: the labeling machine 119 is operated at the same speed as
No speed change; the bottle shoe removal machine 115;
3. Initial alarm, jam, main flow, labeling machine 119: the first sticker machine 122 is stopped;
No speed change; 55 the sheet shrinker machine 126 is slowed down;
4. Jam, secondary flow, labeling machine 119: the operating speeds of the other machines 121, 123, 128,
No speed change; 129, 131, 132, 136, 139, 142 and 145 in the process line
5. Shortage of main flow, labeling machine 119: remain unchanged.
No speed change; The operating speeds of all the machines in the process
6. Shortage of secondary flow, labeling machine 119: 60 line remain unchanged in response to all of the other events
Labeling machine 119 is stopped; which occur in the first sticker machine 122.
7. Initial alarm, shortage of main flow, labeling machine 119: When a disturbance occurs in the second sticker machine
No speed change. 123, the operating speeds of the machines in the process line
The operating speeds of the coding machine 121 and of are changed in the following manner:
the first sticker machine 122 as well as the second sticker 65 the bottle erector machine 101 is slowed down;
machine 123 remain unchanged when the above events the filling machine 104 is operated at the same speed as
occur in the labeling machine 119. the bottle closure machine 113:
US 7,136,719 B2
29 30
the cap sorting machine 108 is slowed down; 6. Shortage of secondary flow, sheet shrinker machine 126:
the cap aligner machine 107 is operated at the same speed Slow down the cap sorting machine 108;
as the cap sorting machine 108; 7. Initial alarm, shortage of main flow, sheet shrinker
the bottle closure machine 113 is slowed down; machine 126:
the bottle shoe removal machine 115 is slowed down; 5 No speed change.
the labeling machine 119 is operated at the same speed as The operating speed of the cap aligner machine 107 is
the bottle shoe removal machine 115; changed in the following manner when the following events
the second sticker machine 123 is stopped; occur in the sheet shrinker machine 126:
the sheet shrinker machine 126 is slowed down; 1. Disturbance, sheet shrinker machine 126:
the operating speeds of the other machines 121, 122, 128, 10 Same speed as the cap sorting machine 108;
129, 131, 132, 136, 139, 142 and 145 in the process line 2. Jam, main flow, sheet shrinker machine 126:
remain unchanged. Same speed as the cap sorting machine 108;
The operating speeds of all the machines in the process 3. Initial alarm, jam, main flow, sheet shrinker machine 126:
line remain unchanged in response to all of the other events No speed change;
which occur in the first sticker machine 123. 15 4. Jam, secondary flow, sheet shrinker machine 126:
The change to the operating speeds of the machines when No speed change;
the following events occur in the sheet shrinker machine 126 5. Shortage of main flow, sheet shrinker machine 126:
will be explained in more detail in the following text. Same speed as the cap sorting machine 108;
The operating speed of the bottle erector machine 101 is 6. Shortage of secondary flow, sheet shrinker machine 126:
changed in the following manner when the following events Same speed as the cap sorting machine 108;
occur in the sheet shrinker machine 126: 7. Initial alarm, shortage of main flow, sheet shrinker
1. Disturbance, sheet shrinker machine 126: machine 126:
Slow down the bottle erector machine 101; No speed change.
2. Jam, main flow, sheet shrinker machine 126: The operating speed of the bottle closure machine 113 is
Slow down the bottle erector machine 101; 25 changed in the following manner when the following events
3. Initial alarm, jam, main flow, sheet shrinker machine 126: occur in the sheet shrinker machine 126:
No speed change; 1. Disturbance, sheet shrinker machine 126:
4. Jam, secondary flow, sheet shrinker machine 126: Slow down the bottle closure machine 113:
No speed change; 2. Jam, main flow, sheet shrinker machine 126:
5. Shortage of main flow, sheet shrinker machine 126: 30 Slow down the bottle closure machine 113:
Speed up the bottle erector machine 101; 3. Initial alarm, jam, main flow, sheet shrinker machine 126:
6. Shortage of secondary flow, sheet shrinker machine 126: No speed change;
Slow down the bottle erector machine 101; 4. Jam, secondary flow, sheet shrinker machine 126:
7. Initial alarm, shortage of main flow, sheet shrinker No speed change;
machine 126: 35 5. Shortage of main flow, sheet shrinker machine 126:
No speed change. Speed up the bottle closure machine 113:
The operating speed of the filling machine 104 is changed 6. Shortage of secondary flow, sheet shrinker machine 126:
in the following manner when the following events occur in Slow down the bottle closure machine 113:
the sheet shrinker machine 126: 7. Initial alarm, shortage of main flow, sheet shrinker
1. Disturbance, sheet shrinker machine 126: 40 machine 126:
Same speed as the bottle closure machine 113: No speed change.
2. Jam, main flow, sheet shrinker machine 126: The operating speed of the bottle shoe removal machine
Same speed as the bottle closure machine 113: 115 is changed in the following manner when the following
3. Initial alarm, jam, main flow, sheet shrinker machine 126: events occur in the sheet shrinker machine 126:
No speed change; 45 1. Disturbance, sheet shrinker machine 126:
4. Jam, secondary flow, sheet shrinker machine 126: Slow down the bottle shoe removal machine 115;
No speed change; 2. Jam, main flow, sheet shrinker machine 126:
5. Shortage of main flow, sheet shrinker machine 126: Slow down the bottle shoe removal machine 115;
Same speed as the bottle closure machine 113: 3. Initial alarm, jam, main flow, sheet shrinker machine 126:
6. Shortage of secondary flow, sheet shrinker machine 126: 50
No speed change;
Same speed as the bottle closure machine 113: 4. Jam, secondary flow, sheet shrinker machine 126:
7. Initial alarm, shortage of main flow, sheet shrinker No speed change;
machine 126:
No speed change. 5. Shortage of main flow, sheet shrinker machine 126:
The operating speed of the cap sorting machine 108 is 55 Speed up the bottle shoe removal machine 115;
changed in the following manner when the following events 6. Shortage of secondary flow, sheet shrinker machine 126:
occur in the sheet shrinker machine 126: Slow down the bottle shoe removal machine 115;
1. Disturbance, sheet shrinker machine 126: 7. Initial alarm, shortage of main flow, sheet shrinker
Slow down the cap sorting machine 108; machine 126:
2. Jam, main flow, sheet shrinker machine 126: 60 No speed change.
Slow down the cap sorting machine 108; The operating speed of the labeling machine 119 is
3. Initial alarm, jam, main flow, sheet shrinker machine 126: changed in the following manner when the following events
No speed change; occur in the sheet shrinker machine 126:
4. Jam, secondary flow, sheet shrinker machine 126: 1. Disturbance, sheet shrinker machine 126:
No speed change; 65 Same speed as the bottle shoe removal machine 115;
5. Shortage of main flow, sheet shrinker machine 126: 2. Jam, main flow, sheet shrinker machine 126:
Speed up the cap sorting machine 108; Same speed as the bottle shoe removal machine 115;
US 7,136,719 B2
31 32
3. Initial alarm, jam, main flow, sheet shrinker machine 126: the bottle closure machine 113 is slowed down;
No speed change; the bottle shoe removal machine 115 is slowed down;
4. Jam, secondary flow, sheet shrinker machine 126: the labeling machine 119 is operated at the same speed as
No speed change; the bottle shoe removal machine 115;
5. Shortage of main flow, sheet shrinker machine 126: 5 the sheet shrinker machine 126 is slowed down;
Same speed as the bottle shoe removal machine 115; the fourth sticker machine 129 is stopped;
6. Shortage of secondary flow, sheet shrinker machine 126: the operating speeds of the other machines 121, 122, 123,
Same speed as the bottle shoe removal machine 115; 128, 129, 131, 132, 136, 139, 142 and 145 in the process line
7. Initial alarm, shortage of main flow, sheet shrinker remain unchanged.
machine 126: 10 The operating speeds of all the other machines in the
No speed change. process line remain unchanged if another event occurs in the
The operating speeds of the coding machine 121 and of fourth sticker machine 129.
the first sticker machine 122 as well as the second sticker The change to the operating speeds of the machines in the
machine 123 remain unchanged when the above events process line when the following events occur in the multiple
occur in the sheet shrinker machine 126. 15
pack erector machine 132 will be explained in more detail in
The operating speed of the sheet shrinker machine 126 is the following text.
changed in the following manner when the following events The operating speed of the bottle erector machine 101 is
occur in the sheet shrinker machine 126: changed in the following manner when the following events
1. Disturbance, sheet shrinker machine 126: occur in the multiple pack erector machine 132:
Sheet shrinker machine 126 is stopped; 1. Disturbance, multiple pack erector machine 132:
2. Jam, main flow, sheet shrinker machine 126: Slow down the bottle erector machine 101;
Sheet shrinker machine 126 is stopped; 2. Jam, main flow, multiple pack erector machine 132:
3. Initial alarm, jam, main flow, sheet shrinker machine 126: Speed up the bottle erector machine 101;
No speed change;
4. Jam, secondary flow, sheet shrinker machine 126: 25 3. Initial alarm, jam, main flow, multiple pack erector
machine 132:
No speed change; No speed change;
5. Shortage of main flow, sheet shrinker machine 126: 4. Jam, secondary flow, multiple pack erector machine 132:
Sheet shrinker machine 126 is stopped;
6. Shortage of secondary flow, sheet shrinker machine 126: Sheet shrinker machine 126 is stopped;
Sheet shrinker machine 126 is stopped; 30 5. Shortage of main flow, multiple pack erector machine
7. Initial alarm, shortage of main flow, sheet shrinker 132:
machine 126: Slow down the bottle erector machine 101;
No speed change. 6. Shortage of secondary flow, multiple pack erector
The operating speeds of the other machines 128, 129, 131, machine 132:
132, 136, 139, 142 and 145 in the process line remain 35 Sheet shrinker machine 126 is stopped;
unchanged when the above events occur in the sheet 7. Initial alarm, shortage of main flow, multiple pack erector
shrinker machine 126. machine 132:
The operating speeds of the machines in the process line No speed change.
are changed in the following manner when a disturbance The operating speed of the filling machine 104 is changed
occurs in the third sticker machine 128: 40 in the following manner when the following events occur in
the bottle erector machine 101 is slowed down; the multiple pack erector machine 132:
the filling machine 104 is operated at the same speed as 1. Disturbance, multiple pack erector machine 132:
the bottle closure machine 113: Same speed as the bottle closure machine 113:
the cap sorting machine 108 is slowed down; 2. Jam, main flow, multiple pack erector machine 132:
the cap aligner machine 107 is operated at the same speed 45
Same speed as the bottle closure machine 113:
as the cap sorting machine 108; 3. Initial alarm, jam, main flow, multiple pack erector
the bottle closure machine 113 is slowed down; machine 132:
the bottle shoe removal machine 115 is slowed down; No speed change;
the labeling machine 119 is operated at the same speed as 4. Jam, secondary flow, multiple pack erector machine 132:
the bottle shoe removal machine 115; 50
No speed change;
the sheet shrinker machine 126 is slowed down; 5. Shortage of main flow, multiple pack erector machine
the third sticker machine 128 is stopped; 132:
the operating speeds of the other machines 121, 122, 123, Same speed as the bottle closure machine 113:
129, 131, 132, 136, 139, 142 and 145 in the process line 6. Shortage of secondary flow, multiple pack erector
remain unchanged. 55
machine 132:
The operating speeds of all the machines in the process No speed change;
line remain unchanged when other events occur in the third
sticker machine 128. 7. Initial alarm, shortage of main flow, multiple pack erector
The operating speeds of the machines in the process line machine 132:
are changed in the following manner when a disturbance 60 No speed change.
occurs in the fourth sticker machine 129: The operating speed of the cap sorting machine 108 is
the bottle erector machine 101 is slowed down; changed in the following manner when the following events
the filling machine 104 is operated at the same speed as occur in the multiple pack erector machine 132:
the bottle closure machine 113: 1. Disturbance, multiple pack erector machine 132:
the cap sorting machine 108 is slowed down; 65 Slow down the cap sorting machine 108;
the cap aligner machine 107 is operated at the same speed 2. Jam, main flow, multiple pack erector machine 132:
as the cap sorting machine 108; Speed up the cap sorting machine 108;
US 7,136,719 B2
33 34
3. Initial alarm, jam, main flow, multiple pack erector 4. Jam, secondary flow, multiple pack erector machine 132:
machine 132: No speed change;
No speed change; 5. Shortage of main flow, multiple pack erector machine
4. Jam, secondary flow, multiple pack erector machine 132: 132:
No speed change; 5 Slow down the bottle shoe removal machine 115;
5. Shortage of main flow, multiple pack erector machine 6. Shortage of secondary flow, multiple pack erector
132: machine 132:
Slow down the cap sorting machine 108; No speed change;
6. Shortage of secondary flow, multiple pack erector 7. Initial alarm, shortage of main flow, multiple pack erector
machine 132: 10 machine 132:
No speed change; No speed change.
7. Initial alarm, shortage of main flow, multiple pack erector The operating speed of the labeling machine 119 is
machine 132: changed in the following manner when the following events
No speed change. occur in the multiple pack erector machine 132:
The operating speed of the cap aligner machine 107 is 15 1. Disturbance, multiple pack erector machine 132:
changed in the following manner when the following events Same speed as the bottle shoe removal machine 115;
occur in the multiple pack erector machine 132: 2. Jam, main flow, multiple pack erector machine 132:
1. Disturbance, multiple pack erector machine 132: Same speed as the bottle shoe removal machine 115;
Same speed as the cap sorting machine 108; 3. Initial alarm, jam, main flow, multiple pack erector
2. Jam, main flow, multiple pack erector machine 132: machine 132:
Same speed as the cap sorting machine 108; No speed change;
3. Initial alarm, jam, main flow, multiple pack erector 4. Jam, secondary flow, multiple pack erector machine 132:
machine 132: No speed change;
No speed change; 5. Shortage of main flow, multiple pack erector machine
4. Jam, secondary flow, multiple pack erector machine 132: 25 132:
No speed change; Same speed as the bottle shoe removal machine 115;
5. Shortage of main flow, multiple pack erector machine 6. Shortage of secondary flow, multiple pack erector
132: machine 132:
Same speed as the cap sorting machine 108; No speed change;
6. Shortage of secondary flow, multiple pack erector 30 7. Initial alarm, shortage of main flow, multiple pack erector
machine 132: machine 132:
No speed change; No speed change.
7. Initial alarm, shortage of main flow, multiple pack erector The operating speeds of the coding machine 121 and of
machine 132: the first sticker machine 122 as well as the second sticker
No speed change. 35 machine 123 remain unchanged when the above events
The operating speed of the bottle closure machine 113 is occur in the multiple pack erector machine 132.
changed in the following manner when the following events The operating speed of the sheet shrinker machine 126 is
occur in the multiple pack erector machine 132:. changed in the following manner when the following events
1. Disturbance, multiple pack erector machine 132: occur in the multiple pack erector machine 132:
Slow down the bottle closure machine 113: 40 1. Disturbance, multiple pack erector machine 132:
2. Jam, main flow, multiple pack erector machine 132: Slow down the sheet shrinker machine 126;
Speed up the bottle closure machine 113: 2. Jam, main flow, multiple pack erector machine 132:
3. Initial alarm, jam, main flow, multiple pack erector Speed up the sheet shrinker machine 126;
machine 132: 3. Initial alarm, jam, main flow, multiple pack erector
No speed change; 45 machine 132:
4. Jam, secondary flow, multiple pack erector machine 132: No speed change;
No speed change; 4. Jam, secondary flow, multiple pack erector machine 132:
5. Shortage of main flow, multiple pack erector machine No speed change;
132: 5. Shortage of main flow, multiple pack erector machine
50 132:
Slow down the bottle closure machine 113: Slow down the sheet shrinker machine 126;
6. Shortage of secondary flow, multiple pack erector 6. Shortage of secondary flow, multiple pack erector
machine 132:
machine 132:
No speed change; No speed change;
7. Initial alarm, shortage of main flow, multiple pack erector 55 7. Initial alarm, shortage of main flow, multiple pack erector
machine 132: machine 132:
No speed change. No speed change.
The operating speed of the bottle shoe removal machine The operating speed of the multiple pack erector machine
115 is changed in the following manner when the following 132 is changed in the following manner when the following
events occur in the multiple pack erector machine 132: 60 events occur in the multiple pack erector machine 132:
1. Disturbance, multiple pack erector machine 132: 1. Disturbance, multiple pack erector machine 132:
Slow down the bottle shoe removal machine 115; The multiple pack erector machine 132 is stopped;
2. Jam, main flow, multiple pack erector machine 132: 2. Jam, main flow, multiple pack erector machine 132:
Speed up the bottle shoe removal machine 115; The multiple pack erector machine 132 is stopped;
3. Initial alarm, jam, main flow, multiple pack erector 65 3. Initial alarm, jam, main flow, multiple pack erector
machine 132: machine 132:
No speed change; No speed change;
US 7,136,719 B2
35 36
4. Jam, secondary flow, multiple pack erector machine 132: 3. Initial alarm, jam, main flow, carton packaging machine
No speed change; 131:
5. Shortage of main flow, multiple pack erector machine No speed change;
132: 4. Jam, secondary flow, carton packaging machine 131:
The multiple pack erector machine 132 is stopped; No speed change;
6. Shortage of secondary flow, multiple pack erector 5. Shortage of main flow, carton packaging machine 131:
machine 132: Speed up the cap sorting machine 108;
No speed change; 6. Shortage of secondary flow, carton packaging machine
7. Initial alarm, shortage of main flow, multiple pack erector 131:
machine 132: 10 Slow down the cap sorting machine 108;
No speed change. 7. Initial alarm, shortage of main flow, carton packaging
The operating speeds of the other machines 128, 129, 131, machine 131:
136, 139, 142 and 145 remain unchanged when the above No speed change.
events occur in the multiple pack erector machine 132. The operating speed of the cap aligner machine 107 is
The changes to the operating speeds of the machines in 15 changed in the following manner when the following events
the process line when the following events occur in the occur in the carton packaging machine 131:
carton packaging machine 131 will be explained in more 1. Disturbance, carton packaging machine 131:
detail in the following text. Same speed as the cap sorting machine 108;
The operating speed of the bottle erector machine 101 is 2. Jam, main flow, carton packaging machine 131:
changed in the following manner when the following events Same speed as the cap sorting machine 108;
occur in the carton packaging machine 131: 3. Initial alarm, jam, main flow, carton packaging machine
131:
1. Disturbance, carton packaging machine 131: No speed change;
Slow down the bottle erector machine 101; 4. Jam, secondary flow, carton packaging machine 131:
2. Jam, main flow, carton packaging machine 131: 25 No speed change;
Slow down the bottle erector machine 101; 5. Shortage of main flow, carton packaging machine 131:
3. Initial alarm, jam, main flow, carton packaging machine Same speed as the cap sorting machine 108;
131:
No speed change; 6. Shortage of secondary flow, carton packaging machine
131:
4. Jam, secondary flow, carton packaging machine 131: 30 Same speed as the cap sorting machine 108;
No speed change; 7. Initial alarm, shortage of main flow, carton packaging
5. Shortage of main flow, carton packaging machine 131: machine 131:
Speed up the bottle erector machine 101; No speed change.
6. Shortage of secondary flow, carton packaging machine The operating speed of the bottle closure machine 113 is
131: 35 changed in the following manner when the following events
Slow down the bottle erector machine 101; occur in the carton packaging machine 131:
7. Initial alarm, shortage of main flow, carton packaging 1. Disturbance, carton packaging machine 131:
machine 131: Slow down the bottle closure machine 113:
No speed change. 2. Jam, main flow, carton packaging machine 131:
The operating speed of the filling machine 104 is changed 40 Slow down the bottle closure machine 113:
in the following manner when the following events occur in 3. Initial alarm, jam, main flow, carton packaging machine
the carton packaging machine 131: 131:
1. Disturbance, carton packaging machine 131: No speed change;
Same speed as the bottle closure machine 113: 4. Jam, secondary flow, carton packaging machine 131:
2. Jam, main flow, carton packaging machine 131: 45 No speed change;
Same speed as the bottle closure machine 113: 5. Shortage of main flow, carton packaging machine 131:
3. Initial alarm, jam, main flow, carton packaging machine Speed up the bottle closure machine 113:
131: 6. Shortage of secondary flow, carton packaging machine
No speed change; 131:
4. Jam, secondary flow, carton packaging machine 131: 50 Slow down the bottle closure machine 113:
No speed change; 7. Initial alarm, shortage of main flow, carton packaging
machine 131:
5. Shortage of main flow, carton packaging machine 131: No speed change.
Same speed as the bottle closure machine 113: The operating speed of the bottle shoe removal machine
6. Shortage of secondary flow, carton packaging machine 55 115 is changed in the following manner when the following
131:
events occur in the carton packaging machine 131:
Same speed as the bottle closure machine 113: 1. Disturbance, carton packaging machine 131:
7. Initial alarm, shortage of main flow, carton packaging Slow down the bottle shoe removal machine 115;
machine 131: 2. Jam, main flow, carton packaging machine 131:
No speed change. 60 Slow down the bottle shoe removal machine 115;
The operating speed of the cap sorting machine 108 is 3. Initial alarm, jam, main flow, carton packaging machine
changed in the following manner when the following events 131:
occur in the carton packaging machine 131: No speed change;
1. Disturbance, carton packaging machine 131: 4. Jam, secondary flow, carton packaging machine 131:
Slow down the cap sorting machine 108; 65 No speed change;
2. Jam, main flow, carton packaging machine 131: 5. Shortage of main flow, carton packaging machine 131:
Slow down the cap sorting machine 108; Speed up the bottle shoe removal machine 115;
US 7,136,719 B2
37 38
6. Shortage of secondary flow, carton packaging machine 7. Initial alarm, shortage of main flow, carton packaging
131: machine 131:
Slow down the bottle shoe removal machine 115; No speed change.
7. Initial alarm, shortage of main flow, carton packaging The operating speeds of the other machines 128, 129, 132,
machine 131: 5 136, 139, 142 and 145 remain unchanged when the events
No speed change. described above occur in the carton packaging machine 131.
The operating speed of the labeling machine 119 is The change to the operating speeds of the individual
changed in the following manner when the following events machines when the following events occur in the carton
occur in the carton packaging machine 131: closure machine 136 will be explained in more detail in the
1. Disturbance, carton packaging machine 131: 10 following text.
Same speed as the bottle shoe removal machine 115; The operating speed of the bottle erector machine 101 is
2. Jam, main flow, carton packaging machine 131: changed in the following manner when the following events
Same speed as the bottle shoe removal machine 115; occur in the carton closure machine 136:
3. Initial alarm, jam, main flow, carton packaging machine 1. Disturbance, carton closure machine 136:
131: 15
Slow down the bottle erector machine 101;
No speed change; 2. Jam, main flow, carton closure machine 136:
4. Jam, secondary flow, carton packaging machine 131: Slow down the bottle erector machine 101;
No speed change; 3. Initial alarm, jam, main flow, carton closure machine 136:
5. Shortage of main flow, carton packaging machine 131: No speed change;
Same speed as the bottle shoe removal machine 115; 4. Jam, secondary flow, carton closure machine 136:
6. Shortage of secondary flow, carton packaging machine No speed change;
131:
Same speed as the bottle shoe removal machine 115; 5. Shortage of main flow, carton closure machine 136:
7. Initial alarm, shortage of main flow, carton packaging Speed up the bottle erector machine 101;
machine 131: 25 6. Shortage of secondary flow, carton closure machine 136:
No speed change. Slow down the bottle erector machine 101;
The operating speeds of the coding machine 121, of the 7. Initial alarm, shortage of main flow, carton closure
first sticker machine 122 and of the second sticker machine machine 136:
123 remain unchanged when the events described above No speed change.
occur in the carton packaging machine 131. 30 The operating speed of the filling machine 104 is changed
The operating speed of the sheet shrinker machine 126 is in the following manner when the following events occur in
changed in the following manner when the following events the carton closure machine 136:
occur in the carton packaging machine 131: 1. Disturbance, carton closure machine 136:
1. Disturbance, carton packaging machine 131: Same speed as the bottle closure machine 113:
Slow down the sheet shrinker machine 126; 35 2. Jam, main flow, carton closure machine 136:
2. Jam, main flow, carton packaging machine 131: Same speed as the bottle closure machine 113:
Slow down the sheet shrinker machine 126; 3. Initial alarm, jam, main flow, carton closure machine 136:
3. Initial alarm, jam, main flow, carton packaging machine No speed change;
131: 4. Jam, secondary flow, carton closure machine 136:
No speed change; 40
No speed change;
4. Jam, secondary flow, carton packaging machine 131: 5. Shortage of main flow, carton closure machine 136:
No speed change; Same speed as the bottle closure machine 113:
5. Shortage of main flow, carton packaging machine 131: 6. Shortage of secondary flow, carton closure machine 136:
Speed up the sheet shrinker machine 126; Same speed as the bottle closure machine 113:
6. Shortage of secondary flow, carton packaging machine 45
131: 7. Initial alarm, shortage of main flow, carton closure
machine 136:
Slow down the sheet shrinker machine 126; No speed change.
7. Initial alarm, shortage of main flow, carton packaging
machine 131: The operating speed of the cap sorting machine 108 is
No speed change. 50 changed in the following manner when the following events
The operating speed of the carton packaging machine 131 occur in the carton closure machine 136:
is changed in the following manner when the following 1. Disturbance, carton closure machine 136:
events occur in the carton packaging machine 131: Slow down the cap sorting machine 108;
1. Disturbance, carton packaging machine 131: 2. Jam, main flow, carton closure machine 136:
The carton packaging machine 131 is stopped; 55 Slow down the cap sorting machine 108;
2. Jam, main flow, carton packaging machine 131: 3. Initial alarm, jam, main flow, carton closure machine 136:
The carton packaging machine 131 is stopped; No speed change;
3. Initial alarm, jam, main flow, carton packaging machine 4. Jam, secondary flow, carton closure machine 136:
131: No speed change;
No speed change; 60
4. Jam, secondary flow, carton packaging machine 131: 5. Shortage of main flow, carton closure machine 136:
No speed change; Speed up the cap sorting machine 108;
5. Shortage of main flow, carton packaging machine 131: 6. Shortage of secondary flow, carton closure machine 136:
The carton packaging machine 131 is stopped; Slow down the cap sorting machine 108;
6. Shortage of secondary flow, carton packaging machine 65 7. Initial alarm, shortage of main flow, carton closure
131: machine 136:
The carton packaging machine 131 is stopped; No speed change.
US 7,136,719 B2
39 40
The operating speed of the cap aligner machine 107 is 6. Shortage of secondary flow, carton closure machine 136:
changed in the following manner when the following events Same speed as the bottle shoe removal machine 115;
occur in the carton closure machine 136: 7. Initial alarm, shortage of main flow, carton closure
1. Disturbance, carton closure machine 136: machine 136:
Same speed as the cap sorting machine 108; No speed change.
2. Jam, main flow, carton closure machine 136: The operating speeds of the coding machine 121, of the
Same speed as the cap sorting machine 108; first sticker machine 122 and of the second sticker machine
3. Initial alarm, jam, main flow, carton closure machine 136: 123 remain unchanged when the above events occur in the
No speed change; carton closure machine 136.
4. Jam, secondary flow, carton closure machine 136: 10 The operating speed of the sheet shrinker machine 126 is
No speed change; changed in the following manner when the following events
5. Shortage of main flow, carton closure machine 136: occur in the carton closure machine 135:
Same speed as the cap sorting machine 108; 1. Disturbance, carton closure machine 136:
6. Shortage of secondary flow, carton closure machine 136: Slow down the sheet shrinker machine 126;
Same speed as the cap sorting machine 108; 15 2. Jam, main flow, carton closure machine 136:
7. Initial alarm, shortage of main flow, carton closure Slow down the sheet shrinker machine 126;
machine 136: 3. Initial alarm, jam, main flow, carton closure machine 136:
No speed change. No speed change;
The operating speed of the bottle closure machine 113 is 4. Jam, secondary flow, carton closure machine 136:
changed in the following manner when the following events No speed change;
occur in the carton closure machine 136: 5. Shortage of main flow, carton closure machine 136:
1. Disturbance, carton closure machine 136: Speed up the sheet shrinker machine 126;
Slow down the bottle closure machine 113: 6. Shortage of secondary flow, carton closure machine 136:
2. Jam, main flow, carton closure machine 136: Slow down the sheet shrinker machine 126;
Slow down the bottle closure machine 113: 25 7. Initial alarm, shortage of main flow, carton closure
3. Initial alarm, jam, main flow, carton closure machine 136: machine 136:
No speed change; No speed change.
4. Jam, secondary flow, carton closure machine 136: The operating speed of the carton closure machine 136 is
No speed change; changed in the following manner when the following events
5. Shortage of main flow, carton closure machine 136: 30 occur in the carton closure machine 136:
Speed up the bottle closure machine 113: 1. Disturbance, carton closure machine 136:
6. Shortage of secondary flow, carton closure machine 136: The carton closure machine 136 is stopped;
Slow down the bottle closure machine 113: 2. Jam, main flow, carton closure machine 136:
7. Initial alarm, shortage of main flow, carton closure The carton closure machine 136 is stopped;
machine 136: 35 3. Initial alarm, jam, main flow, carton closure machine 136:
No speed change. No speed change;
The operating speed of the bottle shoe removal machine 4. Jam, secondary flow, carton closure machine 136:
115 is changed in the following manner when the following No speed change;
events occur in the carton closure machine 136: 5. Shortage of main flow, carton closure machine 136:
1. Disturbance, carton closure machine 136: 40 The carton closure machine 136 is stopped;
Slow down the bottle shoe removal machine 115. 6. Shortage of secondary flow, carton closure machine 136:
2. Jam, main flow, carton closure machine 136: The carton closure machine 136 is stopped;
Slow down the bottle shoe removal machine 115; 7. Initial alarm, shortage of main flow, carton closure
3. Initial alarm, jam, main flow, carton closure machine 136: machine 136:
No speed change; 45 No speed change.
4. Jam, secondary flow, carton closure machine 136: The operating speeds of the other machines 128, 129, 131,
No speed change; 132, 139, 142 and 145 in the process line remain unchanged
5. Shortage of main flow, carton closure machine 136: when the above events occur in the carton closure machine
Speed up the bottle shoe removal machine 115; 136.
6. Shortage of secondary flow, carton closure machine 136: 50 The changes to the operating speeds of the machines in
Slow down the bottle shoe removal machine 115; the process line when the following events occur in the
7. Initial alarm, shortage of main flow, carton closure carton label printing machine 139 will be explained in more
machine 136: detail in the following text.
No speed change. The operating speed of the bottle erector machine 101 is
The operating speed of the labeling machine 119 is 55 changed in the following manner when the following events
changed in the following manner when the following events occur in the carton label printing machine 139:
occur in the carton closure machine 136: 1. Disturbance, carton label printing machine 139:
1. Disturbance, carton closure machine 136: Slow down the bottle erector machine 101;
Same speed as the bottle shoe removal machine 115; 2. Jam, main flow, carton label printing machine 139:
2. Jam, main flow, carton closure machine 136: 60 Slow down the bottle erector machine 101;
Same speed as the bottle shoe removal machine 115; 3. Initial alarm, jam, main flow, carton label printing
3. Initial alarm, jam, main flow, carton closure machine 136: machine 139:
No speed change; No speed change;
4. Jam, secondary flow, carton closure machine 136: 4. Jam, secondary flow, carton label printing machine 139:
No speed change; 65 No speed change;
5. Shortage of main flow, carton closure machine 136: 5. Shortage of main flow, carton label printing machine 139:
Same speed as the bottle shoe removal machine 115; Speed up the bottle erector machine 101;
US 7,136,719 B2
41 42
6. Shortage of secondary flow, carton label printing machine The operating speed of the bottle closure machine 113 is
139: changed in the following manner when the following events
Slow down the bottle erector machine 101; occur in the carton label printing machine 139:
7. Initial alarm, shortage of main flow, carton label printing 1. Disturbance, carton label printing machine 139:
machine 139: Slow down the bottle closure machine 113:
No speed change. 2. Jam, main flow, carton label printing machine 139:
The operating speed of the filling machine 104 is changed Slow down the bottle closure machine 113:
in the following manner when the following events occur in 3. Initial alarm, jam, main flow, carton label printing
the carton label printing machine 139: machine 139:
1. Disturbance, carton label printing machine 139: 10 No speed change;
Same speed as the bottle closure machine 113: 4. Jam, secondary flow, carton label printing machine 139:
2. Jam, main flow, carton label printing machine 139: No speed change;
Same speed as the bottle closure machine 113: 5. Shortage of main flow, carton label printing machine 139:
3. Initial alarm, jam, main flow, carton label printing Speed up the bottle closure machine 113:
machine 139: 15
No speed change; 6. Shortage of secondary flow, carton label printing machine
139:
4. Jam, secondary flow, carton label printing machine 139:
No speed change; Slow down the bottle closure machine 113:
5. Shortage of main flow, carton label printing machine 139: 7. Initial alarm, shortage of main flow, carton label printing
machine 139:
Same speed as the bottle closure machine 113: No speed change.
6. Shortage of secondary flow, carton label printing machine
139: The operating speed of the bottle shoe removal machine
Same speed as the bottle closure machine 113: 115 is changed in the following manner when the following
7. Initial alarm, shortage of main flow, carton label printing events occur in the carton label printing machine 139:
machine 139: 25 1. Disturbance, carton label printing machine 139:
No speed change. Slow down the bottle shoe removal machine 115;
The operating speed of the cap sorting machine 108 is 2. Jam, main flow, carton label printing machine 139:
changed in the following manner when the following events Slow down the bottle shoe removal machine 115;
occur in the carton label printing machine 139: 3. Initial alarm, jam, main flow, carton label printing
1. Disturbance, carton label printing machine 139: 30 machine 139:
Slow down the cap sorting machine 108; No speed change;
2. Jam, main flow, carton label printing machine 139: 4. Jam, secondary flow, carton label printing machine 139:
Slow down the cap sorting machine 108; No speed change;
3. Initial alarm, jam, main flow, carton label printing 5. Shortage of main flow, carton label printing machine 139:
machine 139: 35
Speed up the bottle shoe removal machine 115;
No speed change; 6. Shortage of secondary flow, carton label printing machine
4. Jam, secondary flow, carton label printing machine 139: 139:
No speed change; Slow down the bottle shoe removal machine 115;
5. Shortage of main flow, carton label printing machine 139: 7. Initial alarm, shortage of main flow, carton label printing
Speed up the cap sorting machine 108; 40
machine 139:
6. Shortage of secondary flow, carton label printing machine No speed change.
139:
The operating speed of the labeling machine 119 is
Slow down the cap sorting machine 108; changed in the following manner when the following events
7. Initial alarm, shortage of main flow, carton label printing occur in the carton label printing machine 139:
machine 139: 45
No speed change. 1. Disturbance, carton label printing machine 139:
The operating speed of the cap aligner machine 107 is Same speed as the bottle shoe removal machine 115;
changed in the following manner when the following events 2. Jam, main flow, carton label printing machine 139:
occur in the carton label printing machine 139: Same speed as the bottle shoe removal machine 115;
1. Disturbance, carton label printing machine 139: 50 3. Initial alarm, jam, main flow, carton label printing
machine 139:
Same speed as the cap sorting machine 108;
2. Jam, main flow, carton label printing machine 139: No speed change;
Same speed as the cap sorting machine 108; 4. Jam, secondary flow, carton label printing machine 139:
3. Initial alarm, jam, main flow, carton label printing No speed change;
55
machine 139: 5. Shortage of main flow, carton label printing machine 139:
No speed change; Same speed as the bottle shoe removal machine 115;
4. Jam, secondary flow, carton label printing machine 139: 6. Shortage of secondary flow, carton label printing machine
No speed change; 139:
5. Shortage of main flow, carton label printing machine 139: 60 Same speed as the bottle shoe removal machine 115;
Same speed as the cap sorting machine 108; 7. Initial alarm, shortage of main flow, carton label printing
6. Shortage of secondary flow, carton label printing machine machine 139:
139: No speed change.
Same speed as the cap sorting machine 108; The operating speeds of the coding machine 121, of the
7. Initial alarm, shortage of main flow, carton label printing 65 first sticker machine 122 and of the second sticker machine
machine 139: 123 remain unchanged when the above events occur in the
No speed change. carton label printing machine 139.
US 7,136,719 B2
43 44
The operating speed of the sheet shrinker machine 126 is The operating speed of the filling machine 104 is changed
changed in the following manner when the following events in the following manner when the following events occur in
occur in the carton label printing machine 139: the check weighing facility 142:
1. Disturbance, carton label printing machine 139: 1. Disturbance, check weighing facility:
Slow down the sheet shrinker machine 126; Same speed as the bottle closure machine 113:
2. Jam, main flow, carton label printing machine 139: 2. Jam, main flow, check weighing facility 142:
Slow down the sheet shrinker machine 126; Same speed as the bottle closure machine 113:
3. Initial alarm, jam, main flow, carton label printing 3. Initial alarm, jam, main flow, check weighing facility 142:
machine 139: No speed change;
No speed change; 10 4. Jam, secondary flow, check weighing facility 142:
4. Jam, secondary flow, carton label printing machine 139: No speed change;
No speed change; 5. Shortage of main flow, check weighing facility 142:
5. Shortage of main flow, carton label printing machine 139: Same speed as the bottle closure machine 113:
Speed up the sheet shrinker machine 126; 6. Shortage of secondary flow, check weighing facility 142:
6. Shortage of secondary flow, carton label printing machine 15 No speed change;
139: 7. Initial alarm, shortage of main flow, check weighing
Slow down the sheet shrinker machine 126; facility 142:
7. Initial alarm, shortage of main flow, carton label printing No speed change.
machine 139: The operating speed of the cap sorting machine 108 is
No speed change. changed in the following manner when the following events
The operating speed of the carton label printing machine occur in the check weighing facility 142:
139 is changed in the following manner when the following 1. Disturbance, check weighing facility:
events occur in the carton label printing machine 139: Slow down the cap sorting machine 108;
1. Disturbance, carton label printing machine 139: 2. Jam, main flow, check weighing facility 142:
The carton label printing machine 139 is stopped; 25 Slow down the cap sorting machine 108;
2. Jam, main flow, carton label printing machine 139: 3. Initial alarm, jam, main flow, check weighing facility 142:
The carton label printing machine 139 is stopped; No speed change;
3. Initial alarm, jam, main flow, carton label printing 4. Jam, secondary flow, check weighing facility 142:
machine 139: No speed change;
No speed change; 30 5. Shortage of main flow, check weighing facility 142:
4. Jam, secondary flow, carton label printing machine 139: Speed up the cap sorting machine 108;
No speed change; 6. Shortage of secondary flow, check weighing facility 142:
5. Shortage of main flow, carton label printing machine 139: No speed change;
The carton label printing machine 139 is stopped; 7. Initial alarm, shortage of main flow, check weighing
6. Shortage of secondary flow, carton label printing machine 35 facility 142:
139: No speed change.
The carton label printing machine 139 is stopped; The operating speed of the cap aligner machine 107 is
7. Initial alarm, shortage of main flow, carton label printing changed in the following manner when the following events
machine 139: occur in the check weighing facility 142:
No speed change. 40 1. Disturbance, check weighing facility:
The other machines 128, 129, 131, 132, 136, 142 and 145 Same speed as the cap sorting machine 108;
in the process line remain unchanged when the events 2. Jam, main flow, check weighing facility 142:
described above occur in the carton label printing machine Same speed as the cap sorting machine 108;
139. 3. Initial alarm, jam, main flow, check weighing facility 142:
The change to the operating speeds of the machines in the 45 No speed change;
process line when the following events occur in the check 4. Jam, secondary flow, check weighing facility 142:
weighing facility 142 will be explained in more detail in the No speed change;
following text. 5. Shortage of main flow, check weighing facility 142:
The operating speed of the bottle erector machine 101 is Same speed as the cap sorting machine 108;
changed in the following manner when the following events 50 6. Shortage of secondary flow, check weighing facility 142:
occur in the check weighing facility 142: No speed change;
1. Disturbance, check weighing facility: 7. Initial alarm, shortage of main flow, check weighing
Slow down the bottle erector machine 101; facility 142:
2. Jam, main flow, check weighing facility 142: No speed change.
Slow down the bottle erector machine 101;
55 The operating speed of the bottle closure machine 113 is
3. Initial alarm, jam, main flow, check weighing facility 142: changed in the following manner when the following events
No speed change; occur in the check weighing facility 142:
1. Disturbance, check weighing facility:
4. Jam, secondary flow, check weighing facility 142: Slow down the bottle closure machine 113:
No speed change; 60 2. Jam, main flow, check weighing facility 142:
5. Shortage of main flow, check weighing facility 142: Slow down the bottle closure machine 113:
Speed up the bottle erector machine 101; 3. Initial alarm, jam, main flow, check weighing facility 142:
6. Shortage of secondary flow, check weighing facility 142: No speed change;
No speed change; 4. Jam, secondary flow, check weighing facility 142:
7. Initial alarm, shortage of main flow, check weighing 65 No speed change;
facility 142: 5. Shortage of main flow, check weighing facility 142:
No speed change. Speed up the bottle closure machine 113:
US 7,136,719 B2
45 46
6. Shortage of secondary flow, check weighing facility 142: The operating speed of the check weighing facility 142 is
No speed change; changed in the following manner when the following events
7. Initial alarm, shortage of main flow, check weighing occur in the check weighing facility 142:
facility 142: 1. Disturbance, check weighing facility:
No speed change. The check weighing facility 142 is stopped;
The operating speed of the bottle shoe removal machine 2. Jam, main flow, check weighing facility 142:
115 is changed in the following manner when the following The check weighing facility 142 is stopped;
events occur in the check weighing facility 142: 3. Initial alarm, jam, main flow, check weighing facility 142:
1. Disturbance, check weighing facility: No speed change;
Slow down the bottle shoe removal machine 115; 10 4. Jam, secondary flow, check weighing facility 142:
2. Jam, main flow, check weighing facility 142: No speed change;
Slow down the bottle shoe removal machine 115; 5. Shortage of main flow, check weighing facility 142:
3. Initial alarm, jam, main flow, check weighing facility 142: The check weighing facility 142 is stopped;
No speed change; 6. Shortage of secondary flow, check weighing facility 142:
4. Jam, secondary flow, check weighing facility 142:
15 No speed change;
No speed change; 7. Initial alarm, shortage of main flow, check weighing
facility 142:
5. Shortage of main flow, check weighing facility 142: No speed change.
Speed up the bottle shoe removal machine 115; The operating speeds of the other machines 128, 129, 131,
6. Shortage of secondary flow, check weighing facility 142: 132, 136, 139 and 145 remain unchanged when the above
No speed change; events occur in the check weighing facility 142.
7. Initial alarm, shortage of main flow, check weighing The changes to the operating speeds of the machines in
facility 142: the process line when the following events occur in the
No speed change. palletization machine 145 will be explained in more detail in
The operating speed of the labeling machine 119 is 25 the following text.
changed in the following manner when the following events The operating speed of the bottle erector machine 101 is
occur in the check weighing facility 142: changed in the following manner when the following events
1. Disturbance, check weighing facility: occur in the palletization machine 145:
Same speed as the bottle shoe removal machine 115; 1. Disturbance, palletization machine 145:
2. Jam, main flow, check weighing facility 142: 30 Slow down the bottle erector machine 101;
Same speed as the bottle shoe removal machine 115; 2. Jam, main flow, palletization machine 145:
3. Initial alarm, jam, main flow, check weighing facility 142: Slow down the bottle erector machine 101;
No speed change; 3. Initial alarm, jam, main flow, palletization machine 145:
No speed change;
4. Jam, secondary flow, check weighing facility 142: 35 4. Jam, secondary flow, palletization machine 145:
No speed change; No speed change;
5. Shortage of main flow, check weighing facility 142: 5. Shortage of main flow, palletization machine 145:
Same speed as the bottle shoe removal machine 115; Speed up the bottle erector machine 101;
6. Shortage of secondary flow, check weighing facility 142: 6. Shortage of secondary flow, palletization machine 145:
No speed change; 40 Slow down the bottle erector machine 101;
7. Initial alarm, shortage of main flow, check weighing 7. Initial alarm, shortage of main flow, palletization machine
facility 142: 145:
No speed change. No speed change.
The operating speeds of the coding machine 121, of the The operating speed of the filling machine 104 is changed
first sticker machine 122 and of the second sticker machine
45 in the following manner when the following events occur in
123 remain unchanged when the above events occur in the the palletization machine 145:
check weighing facility 142. 1. Disturbance, palletization machine 145:
The operating speed of the sheet shrinker machine 126 is Same speed as the bottle closure machine 113:
changed in the following manner when the following events 50
2. Jam, main flow, palletization machine 145:
occur in the check weighing facility 142: Same speed as the bottle closure machine 113:
1. Disturbance, check weighing facility: 3. Initial alarm, jam, main flow, palletization machine 145:
Slow down the sheet shrinker machine 126; No speed change;
2. Jam, main flow, check weighing facility 142: 4. Jam, secondary flow, palletization machine 145:
Slow down the sheet shrinker machine 126; 55
No speed change;
3. Initial alarm, jam, main flow, check weighing facility 142: 5. Shortage of main flow, palletization machine 145:
No speed change; Same speed as the bottle closure machine 113:
4. Jam, secondary flow, check weighing facility 142: 6. Shortage of secondary flow, palletization machine 145:
No speed change; Same speed as the bottle closure machine 113:
60 7. Initial alarm, shortage of main flow, palletization machine
5. Shortage of main flow, check weighing facility 142: 145:
Speed up the sheet shrinker machine 126; No speed change.
6. Shortage of secondary flow, check weighing facility 142: The operating speed of the cap sorting machine 108 is
No speed change; changed in the following manner when the following events
7. Initial alarm, shortage of main flow, check weighing 65 occur in the palletization machine 145:
facility 142: 1. Disturbance, palletization machine 145:
No speed change. Slow down the cap sorting machine 108;
US 7,136,719 B2
47 48
2. Jam, main flow, palletization machine 145: The operating speed of the labeling machine 119 is
Slow down the cap sorting machine 108; changed in the following manner when the following events
3. Initial alarm, jam, main flow, palletization machine 145: occur in the palletization machine 145:
No speed change; 1. Disturbance, palletization machine 145:
4. Jam, secondary flow, palletization machine 145: 5 Same speed as the bottle shoe removal machine 115;
No speed change; 2. Jam, main flow, palletization machine 145:
5. Shortage of main flow, palletization machine 145: Same speed as the bottle shoe removal machine 115;
Speed up the cap sorting machine 108; 3. Initial alarm, jam, main flow, palletization machine 145:
6. Shortage of secondary flow, palletization machine 145: No speed change;
Slow down the cap sorting machine 108; 10 4. Jam, secondary flow, palletization machine 145:
7. Initial alarm, shortage of main flow, palletization machine No speed change;
145: 5. Shortage of main flow, palletization machine 145:
No speed change. Same speed as the bottle shoe removal machine 115;
The operating speed of the cap aligner machine 107 is 6. Shortage of secondary flow, palletization machine 145:
changed in the following manner when the following events 15 Same speed as the bottle shoe removal machine 115;
occur in the palletization machine 145: 7. Initial alarm, shortage of main flow, palletization machine
1. Disturbance, palletization machine 145: 145:
Same speed as the cap sorting machine 108; No speed change.
2. Jam, main flow, palletization machine 145: The operating speeds of the coding machine 121, of the
Same speed as the cap sorting machine 108; first sticker machine 122 and of the second sticker machine
3. Initial alarm, jam, main flow, palletization machine 145: 123 remain unchanged when the above events occur in the
No speed change; palletization machine 145.
4. Jam, secondary flow, palletization machine 145: The operating speed of the sheet shrinker machine 126 is
No speed change; changed in the following manner when the following events
5. Shortage of main flow, palletization machine 145: 25 occur in the palletization machine 145:
Same speed as the cap sorting machine 108; 1. Disturbance, palletization machine 145:
6. Shortage of secondary flow, palletization machine 145: Slow down the sheet shrinker machine 126;
Same speed as the cap sorting machine 108; 2. Jam, main flow, palletization machine 145:
7. Initial alarm, shortage of main flow, palletization machine Slow down the sheet shrinker machine 126;
145: 30 3. Initial alarm, jam, main flow, palletization machine 145:
No speed change. No speed change;
The operating speed of the bottle closure machine 113 is 4. Jam, secondary flow, palletization machine 145:
changed in the following manner when the following events No speed change;
occur in the palletization machine 145: 5. Shortage of main flow, palletization machine 145:
1. Disturbance, palletization machine 145: 35 Speed up the sheet shrinker machine 126;
Slow down the bottle closure machine 113: 6. Shortage of secondary flow, palletization machine 145:
2. Jam, main flow, palletization machine 145: Slow down the sheet shrinker machine 126;
Slow down the bottle closure machine 113: 7. Initial alarm, shortage of main flow, palletization machine
3. Initial alarm, jam, main flow, palletization machine 145: 145:
No speed change; 40 No speed change.
4. Jam, secondary flow, palletization machine 145: The operating speed of the palletization machine 145 is
No speed change; changed in the following manner when the following events
5. Shortage of main flow, palletization machine 145: occur in the palletization machine 145:
Speed up the bottle closure machine 113: 1. Disturbance, palletization machine 145:
6. Shortage of secondary flow, palletization machine 145: 45 The palletization machine 145 is stopped;
Slow down the bottle closure machine 113: 2. Jam, main flow, palletization machine 145:
7. Initial alarm, shortage of main flow, palletization machine The palletization machine 145 is stopped;
145: 3. Initial alarm, jam, main flow, palletization machine 145:
No speed change. No speed change;
The operating speed of the bottle shoe removal machine 50 4. Jam, secondary flow, palletization machine 145:
115 is changed in the following manner when the following No speed change;
events occur in the palletization machine 145: 5. Shortage of main flow, palletization machine 145:
1. Disturbance, palletization machine 145: The palletization machine 145 is stopped;
Slow down the bottle shoe removal machine 115; 6. Shortage of secondary flow, palletization machine 145:
2. Jam, main flow, palletization machine 145: 55 The palletization machine 145 is stopped;
Slow down the bottle shoe removal machine 115; 7. Initial alarm, shortage of main flow, palletization machine
3. Initial alarm, jam, main flow, palletization machine 145: 145:
No speed change; No speed change.
4. Jam, secondary flow, palletization machine 145: The operating speeds of the other machines 128, 129, 131
No speed change; 60 remain unchanged when the above events occur in the
5. Shortage of main flow, palletization machine 145: palletization machine 145.
Speed up the bottle shoe removal machine 115; In this context, it should be noted that the extent to which
6. Shortage of secondary flow, palletization machine 145: a machine is speeded up or slowed down is dependent on the
Slow down the bottle shoe removal machine 115; respective application and the architecture of the overall
7. Initial alarm, shortage of main flow, palletization machine 65 process line. Suitable values for increasing or reducing the
145: operating speed of the machines may be determined, for
No speed change. example, by means of the technical simulation or, in a
US 7,136,719 B2
49 50
general form, from empirical values during operation of the that the iterative control process allows relatively large
machine while the process line is in operation. discrepancies in the recorded data.
The totality of all of the requirements mentioned above FIG. 6a to FIG. 6d show the procedure for gradient-based
for the purposes of controlling the operating speeds of the process optimization relating to the functional diagram 500.
machines is referred to as the speed matrix. As is illustrated in FIG. 6b and FIG. 6d. in the situation
The control process at the first hierarchy level is thus where the selected actual speed V, is greater than the
based on the predetermined speed matrix. speed V, which leads to the maximum effective output,
FIG. 5a to FIG. 5d use a functional diagram 500 for a then a speed V profile which is smaller by a number of steps
family of functions covering all process lines in each case to is selected as a function of the current effective output Q,
show the relationship between the effective output (produc 10 that is to say a speed V profile is selected whose speed is
tivity) Q, of the process line as a function of the speeds of lower by at least one step than the currently used speed V
the machines in the process line. profile, depending on the gradient of the operating point of
As has already been described in 1, the effective output the optimization function. The number of steps is in this case
Q, is a function of the speed V of the machine. chosen to be greater the greater the discrepancy in the
Each function in the family of functions has a maximum 15 operating point, and vice versa.
FIG. 6a and FIG. 6c show the situation in which the
for the effective output.
The function 502 in this case corresponds to the modelled selected actual speed V, is less than the speed V, In
characteristic and is flanked by the functions 501 and 503, this case, a speedV profile which is less by a number of steps
which cover a tolerance band. matched to the discrepancy or a speed V profile which is
greater by a number of steps matched to the discrepancy is
The individual points of the function 502 are each asso selected depending on whether the current effective output
ciated with a speed V profile, with each individual machine Q, differs in the negative or positive sense from the
in the process line in turn being associated with a nominal expected effective output. If the current effective output
operating speed in each speed V profile. The association Q is in a predeterminable tolerance band, then this process
between the speed V profiles and the points of the function 25 optimization strategy does not result in any reselection of the
can be provided by a suitable mathematical function, for speed V profile to be used at that time, either.
example digitization with a process-relevant step width. A number of steps which is adequate for the respective
FIG. 5a to FIG. 5d show the procedure according to the discrepancy is selected in the gradient-based process opti
invention for process optimization, that is to say the deter mization strategy using the actual speed and the actual
mination and selection of the optimum speed V profile from 30 effective output Q, as well as the nominal effective output
the large number of stored speed V profiles by selection of for the respective actual speed when there is a discrepancy
the optimum points in the function for the case of an iterative between the actual effective output Q, and the nominal
process optimization strategy. effective output, in order to counteract the respective dis
As is illustrated in FIG. 5b and FIG. 5d., in the situation crepancy. The number of steps is in this case dependent on
where the actual speed V, is greater than the speed Vi, 35 the gradient of the respective operating point on the respec
for the maximum effective output, in other words for the tively selected optimization function. Since the gradient
speed at which the maximum effective output is reached for based procedure thus requires a small number of adjustment
the respective function 502, a speed V profile which is one steps, the optimum operating point and thus the selection of
step lower is selected irrespective of the current productivity, the respectively optimum speed V profile can be reached
that is to say the speed V profile which is immediately 40 approximately with a relatively small number of selection
adjacent to the current speed V profile and for which the steps. This process optimization strategy allows operation
individual machine speeds are lower by one step is selected with a broad recorded data tolerance band.
for subsequent control of the machines on the basis of the FIG. 7a to FIG. 7d show the procedure for a model-based
speed matrices described above. optimization strategy.
FIG.5a and FIG.5c show the situation in which the actual 45 FIG. 7b and FIG. 7d illustrate the situation in which the
speed of the machines V, is less than the speed V, which selected actual speed V, is greater than the speed V, for
leads to the maximum effective output. If the selected actual the maximum effective output. If the current effective output
speed is less than the speed V, for the maximum effective is higher than the expected effective output, that operating
output, then a speed V profile which is lower by one step or speed V, of the machines which corresponds to the
a speed V profile which is higher by one step is selected 50 optimum effective output is selected as the optimum speed
depending on whether the current effective output differs in V profile. If the current effective output is less than the
the negative or positive sense from the expected effective expected effective output, a speed V profile is selected
output. If the current effective output Q, is in a tolerance whose expected effective output coincides with the current
band which can be predetermined, then the speed V profile effective output.
which is actually used for control of the individual machines 55 If the selected actual speed V is less than the speed
is not changed. V, which leads to the maximum effective output, as is
In the iteratively optimum process optimization strategy illustrated in FIGS. 7a and 7c, then a speed V profile is
using the actual speed and the actual effective output Q, selected whose expected effective output coincides with the
and the nominal effective output for the respective actual current effective output. The direction of the speed change is
speed of the machines is obviously counteracted when there 60 in this case dependent on whether the current effective
is a discrepancy of a fixed control step between the actual output is greater than or less than the expected effective
effective output and the nominal effective output. The itera output at the actual speed. However, the maximum increase
tive process optimization strategy thus leads to permanent in speed in this case does not exceed the speed V, which
proximity to the respectively optimum operating point when leads to the maximum effective output.
a large number of Small adjustment steps are available, or in 65 Once again, in this process optimization strategy as well,
other words this leads to the selection of the respectively no new speed V profile is selected when the current effective
optimum speed V profile. This procedure has the advantage output Q, is in a predeterminable tolerance band.
US 7,136,719 B2
51 52
In the case of the model-based process optimization 132 Multiple pack erector machine
strategy, the optimum speed V profile is selected using the 133 Carton
actual speed, the actual effective output Q, and the respec 134 Carton with bottles in it
tive complete characteristic (the respective complete model) 135 Conveyor belt
of the nominal effective output as a function of the respec 136 Carton closure machine
tive operating speed of the machines. When there is a 137 Closed cartons
discrepancy between the actual effective output Q, and 138 Conveyor belt
the nominal effective output, the actual speed of the 139 Carton label printing machine
machines is predetermined which corresponds to the char 140 Printed cartons
acteristic, that is to say to the model of the machines. The 10 141 Conveyor belt
number of steps for selection of the respective optimum 142 Check weighing facility
speed V profile is in this case directly dependent on the 143 Weighed carton
model of the machines. This process optimization strategy 144 Conveyor belt
has the particular advantage that the optimum operating 145 Palletization machine
point can be set very precisely with a minimum number of 15 146 First fieldbus
adjustment steps being required, that is to say selection steps 147 Belt control unit
for the respective speed V profile. The adjustment dynamic 148 Second fieldbus
response and the control accuracy of the reference variables 149 Process stabilization control computer
are directly proportionally dependent on the data quality. 150 Measurement data database management computer
As used herein, and in particular as used herein to define 151 Ethernet
the elements of the claims that follow, the articles “a” and 152 Process optimization computer
“an are synonymous and used interchangeably with “at 153 Simulation computer
least one' or "one or more.” disclosing or encompassing 201 Screen Surface simulation program
both the singular and the plural, unless specifically defined 202 Actual speed
otherwise. The conjunction “or is used herein in its inclu 25 203 MTBF
sive disjunctive sense, such that phrases formed by terms 204 MTTR
conjoined by 'or' disclose or encompass each term alone as 205 Process optimization program
well as any combination of terms so conjoined, unless 300 Machines
specifically defined otherwise. All numerical quantities are 400 Block diagram
understood to be modified by the word “about, unless 30
First speed V profile
specifically modified otherwise or unless an exact amount is Second speed V profile
needed to define the invention over the prior art. Third speed V profile
LIST OF REFERENCE SYMBOLS m-th speed V profile
35 405 Double-headed arrow to symbolize the change in the
100 Machine arrangement speeds during the course of process stabilization of a
101 Bottle erector machine selected speed V profile
102 Bottle 406 Double-headed arrow to symbolize the selection of
103 Conveyor belt different speed V profiles
104 Filling machine 40 407 Nominal operating speed, machine
105 Filled bottle 500 functional diagram
106 Conveyor belt 501 Function, effective output
107 Cap aligner machine 502 Function, effective output
108 Cap sorting machine 503 Function, effective output
109 Conveyor belt 45
110 Cap What is claimed is:
111 Bottle provided with cap 1. A method of computer-aided control of a process
112 Conveyor belt comprising a plurality of machines coupled to one another in
113 Bottle closure machine series, comprising the steps of:
114 Closed bottle 50 (a) recording one or more machine sensor values;
115 Bottle shoe removal machine (b) controlling process stabilization with a machine con
116 Bottle shoe trol matrix selected from a plurality of machine control
117 Conveyor belt matrices, wherein the selected matrix controls process
118 Secondary input bottle erector machine stabilization using at least one of the recorded machine
119 Labeling machine 55 sensor values, and wherein each of the plurality of
120 Labeled bottle machine control matrices stores one or more nominal
121 Coding machine control values for the controlled machines;
122 First sticker machine (c) determining process optimization using a predeter
123 Second sticker machine minable criterion and at least one of the recorded
124 Marked bottle 60 machine sensor values:
125 Secondary conveyor belt (d) selecting an optimum machine control matrix from the
126 Sheet shrinker machine plurality of machine control matrices on the basis of the
127 Main conveyor belt process optimization; and
128 Third sticker machine (e) using the selected matrix to control the machines.
129 Fourth sticker machine 65 2. The method of claim 1, wherein nominal speed values
130 Completely marked bottle at which the respective machines are intended to be operated
131 Carton packaging machine are stored in the selected machine control matrix.
US 7,136,719 B2
53 54
3. The method of claim 2, wherein the speed values in the 10. The method of claim 1, wherein the process optimi
machine control matrix are allocated to the machines in Zation is carried out repeatedly as a function of a predeter
accordance with a speed V profile. mined repetition criterion.
4. The method of claim 1, wherein the nominal control 11. The method of claim 10, wherein the process optimi
value(s) of the selected machine control matrix are varied, Zation is carried out repeatedly in a predeterminable repeti
and process is controlled on the basis of the varied nominal tion period.
control value(s). 12. The method of claim 1, wherein the process optimi
5. The method of claim 1, wherein the selected matrix Zation is carried out using one or more of the following
comprises a computer-aided simulation of the plurality of optimization methods:
machines coupled in series, and the process optimization is 10 an iterative optimization method,
carried out on the basis of the computer-aided simulation. a gradient-based optimization method, or
6. The method of claim 1, wherein the process optimiza a model-based optimization method.
tion is carried out in order to maximize process output. 13. A control device for controlling a plurality of
7. The method of claim 1, wherein at least one of the machines that are coupled in a process in series with one
machines is a processing machine. 15
another, comprising:
8. The method of claim 7, wherein at least one of the (a) a recording device for recording of machine sensor
machines is a packaging machine. values;
9. The method of claim 1, wherein at least one of the
machines is in the form of one of the following machines: (b) a control unit for process-stabilizing control of the
bottle erector machine machines in accordance with a machine control matrix
material filling machine that is selected from a plurality of machine control
cap sorting machine matrices, each machine control matrix storing nominal
cap aligner machine control values for the controlled machines and using at
bottle closure machine least one recorded machine sensor value;
bottle shoe lifter machine 25 (c) a process optimization unit for optimizing the process
bottle labeling machine, on the basis of a predeterminable criterion using at least
coding machine one recorded machine sensor value; and
Sticker machine (d) a machine control matrix selection unit that deter
sheet shrinkage machine mines and selects an optimum machine control matrix,
multiple pack aligner machine, 30 on the basis of the process optimization, from the
carton packaging machine plurality of machine control matrices, which optimum
carton closure machine machine control matrix is then used to control the
carton label printing machine machines.
checking balance
palletization machine.

Potrebbero piacerti anche