HLURB) NHA
Housing(and(Land( National(Housing(
Use(Regulatory( SHFC NHMFC HDMF HGC Authority
Board Home(
Social(Housing( National(Home( Home(
Finance( Mortgage( Development( Guaranty(
Corporation Finance( Mutual(Fund Corporation
Corporation
q Provide technical and other forms of assistance to LGUs in the implementation of their housing programs
q Undertake relocation and resettlement of families living in danger areas with LGUs
RA 7835 - CISFA (08 December 1994)
q Implement the following vital components of the National Shelter Program: Resettlement Program, Medium
Rise Public and Private Housing Program, Cost Recoverable Programs, and Local Housing Program
q Engage in land banking activities to ensure availability of land to sustain the Resettlement Program
q Manage and administer a Trust Fund for the Medium Rise Public and Private Housing and Local Housing
Programs
NHA PDP Target: Completions
2017-2022
05 Energy Conservation
06 Color Scheme
Guidelines for Site Selection, Site
Suitability and Site Planning of NHA
Housing Development Projects
MC 2015-015 dated December 29, 2015
Guidelines for Site Selection, Site Suitability and
Site Planning of NHA Housing Development Projects (MC 2015-015)
FEATURES:
• Forward planning tool – with the use of the Housing Sites Map
• Participatory approach – through consultation with project-level
units and other stakeholders
• Principle of integration – aligning of the plans with other plans
of the government.
GUIDING CRITERIA:
• Location
• Conformity with Land Use
• Accessibility
Guidelines for Site Selection, Site Suitability and
Site Planning of NHA Housing Development Projects (MC 2015-015)
SITE PLANNING
SITE SELECTION SITE SUITABILITY AND DETAILED
A&E DESIGN
Responsible
Units: Regional Offices;
Regional Offices, Operating Project Offices;
Regional Offices;
Units, HTDO (if assistance is requested);
Project Offices
HTDO, CPO CIED (for appraisal of feasible sites
upon request)
This process looks at the intrinsic and specific technical qualities of the site and its capability to
address the requirements for housing.
Involves determining the potentials, constraints, and development issues of a specific site
SITE SUITABILITY ANALYSIS
• Topography
Topography must be relatively flat and slopes of proposed sites should not exceed the 15%
maximum gradient considered as buildable slopes for housing development.
• Slope
Density of above 300 to 600 units/ha: slope should be below 5%.
Density of 300 units & below/ha: sloping area could be 5% to 15%.
• Drainage Outfall
Natural waterways and outfalls shall be established on ground, with identified legal access.
Natural waterways should be retained to preserve ecological balance. Drainage outfall should
be extended directly into the main waterways.
SITE SUITABILITY ANALYSIS
DELIVERABLES:
60% Saleable-
• Residential housing development
Land Use Allocation
• Areas for Store spaces
40%
40% Non-Saleable Non-Saleable
Saleable
60%
• Circulation / Road Network
• Parks and Playgrounds
• Community Facilities
Allowable Densities ( No. of Units/hectare)
COMMUNITY
PROMOTING • Reduced transport costs
• Additional planting strips
WALKABLE • Improved air quality
COMMUNITY
Water Supply
and Sanitation
Rainwater Harvesting
Anaerobic Baffled Reactor
Material Recovery Facilities
Drainage Improvement
Water Supply and Sanitation
Anaerobic Baffled
Reactor
Rainwater Harvesting Standard design applicable
for every 300 units.
Significant potable water More economical and
consumption reduction compliant to DENR and
may be achieved with this. DOH parameters.
MOUNTING HEIGHT:6M
WORKING TEMP. RANGE:-25°C TO 65°C
ARM/BRACKET:
STAINLESS STEEL SCHEDULE 40
Aligning with the Philippine Development Plan of the Philippines, and with all
the directives pertaining to disaster preparedness and resiliency, climate change
and all the other laws affecting the housing sector, it is imperative to design and
implement innovative and responsive policies, programs and projects.