COMPANY PROFILE

E & A CONSTRUCTION
(Always ahead differently)
COMPANY PROFILE

M/S. E&A CONSTRUCTION


(Established in 1993)

Address: 8/1 (3rd Floor), Block-A, Aurangazeb Road,


Mohammadpur, Dhaka-1207.
Tel: 9128614,9110207. Fax: 8116363.

E-mail: mohibul_eanda@yahoo.com, shabnam_eanda@yahoo.com

E & A Construction
Construction

E & A
INDEX

 Introduction.
 Organogram.

Construction
 Company Details at a glance.
 Forecast of Financial aspects of the firm.
 Experience of the firm.
 Major enlistment information.
 Sister concern of this firm and other agent with foreign Co.
 List of Technical and other personnel.
E & A

 List of machineries of the firm.


 List of ongoing project.
 Work completed for last 05 years.
 Photograph of different project executed by this firm.
E & A Construction

Profile of E & A Construction


(up dated up to June, 2006)

INTRODUCTION

E&A Construction is a proprietorship and modern business concern having 19 years


experience. Our achieved experience is quite healthy, shinning and significant. We put our first
step with construction work (Civil & Electrical) assuring best quality all times. Beside our different
construction line and equipments supply business experience we tried to put our next step to
electrical transmission and construction work. After that we looked front and gathered the
experience in supply (Local & international shopping), trading and other business. Now we are
organized with smart, talented and dedicated set up in civil, electrical and construction technical
personnel, couple of spontaneous marketing hands with required strength. Our motto is to serve
our clients and principals up to their desired level.

At present we are representing two Chinese and one Indian companies as their exclusive partner.
Our expanded business with foreign delegation is impressive and we are enjoying cordial
cooperation.

Adhering to the principal of “Quality, Service and Credit” the firm will continue its job with
reliable service of high quality and fulfillment of business commitment.

We hope our upgrading performance as well as rich business figures in every step.
Profile of E & A Construction
(up dated up to June, 2006)

Organogram
Proprietor
General Manager (Admin) Manager (Finance) General Manager (Technical)
Manager (HRD) Chief Accountant Asstt. Asstt. Engineer
Engineer (Civil)
(Electrical)
Communication Office Accounts Officer Sub-Asstt. Sub-Asstt.
Executive Executive Engineer Engineer
(Electrical) (Civil)
Computer Office Cashier Site Site Executive
Operator Assistant Executive (Civil)
(Electrical)
Profile of E & A construction
(up dated up to June, 2006)

Company Details at a glance:

Company Name : M/S. E&A Construction


Type : Proprietorship.
Name of Proprietor : Md. Sarwar Ezaz
Established : 1993.
Location : Trader.
Nature of business : Importer, Supplier, Bidder and Construction
Firm.
Name of enlisted organization : BPDB, DESA, REB, WAPDA, R&H, LGED, DGDP,
Education Engineering Dept., District Council (DC).
Value of work : 100 Million (DESA, BPDB, EPZ etc.)
(Completed for last 03 years)
Value of work in hand : 400 Million
Bankers Name : Eastern Bank Limited, Gulshan Branch, Dhaka.
Phone:
Trust Bank Limited, Gulshan Branch, Dhaka.
Phone: 8815594, 8828088.
Phone No. : 8116363, 9128614
Fax No. : 9110207
E-mail : mohibul_eanda@yahoo.com,
Shabnam_eanda@yahoo.com
Profile of E & A Construction
up dated up to June, 2006

FINANCIAL STATEMENT FOR LAST FIVE


YEARS
SL.
Year 2001 2002 2003 2004 2005
No.
1 Total assets 83,98,967/- 1,11,43,599/- 98,69,203/- 1,04,30,543/- 1,46,30,621/-

2 Current asset 72,28,470/- 96,91,455/- 71,85,814/- 79,29,253/- 1,17,80,694/-


Current
3 6,63,405/- 27,36,316/- 10,69,984/- 98,560/- 25,54,048/-
liabilities
Profit before
4 25,99,272/- 25,50,628/- 22,95,324/- 24,26,752/- 56,48,120/-
Taxes
Profit after
5 19,92,454/- 19,81,721/- 17,98,993/- 19,17,564/- 43,33,590/-
Taxes

FINANCIAL STATEMENT FOR LAST FIVE


YEARS
(In Million US$)
SL.
Year 2001 2002 2003 2004 2005
No.
1 Total assets 0.182 0.241

2 Current asset 0.157 0.210


Current
3 0.011 0.047
liabilities
Profit before
4 0.056 0.055
Taxes
Profit after
5 0.043 0.043
Taxes
Profile of E & A Construction
(up dated up to June, 2006)

List of ongoing projects


Nam Date
Sl.
e of Total of
N Name of work Work Order No
Orga Value Comp
o
n. letion
Construction of
1st and 2nd floor Work order no:
of existing one BEPZA/CE/IEPZ/C BEPZ 2,05,04,32 Ongoi
01
storied factory C-69/112 A 6.37 ng.
building at IEPZ, Date: 15.05.2006
Paksey, Pabna.
Extension of 3rd
floor (Building
No-5) of Existing
four storied Work order no:
BEPZ 1,56,15,57 Ongoi
02 foundation three BEPZA/CE/DEPZ/
A 6.32 ng.
storied factory CR/333/107
building at Dhaka Date: 14.05.2006
EPZ Extension
Area.
Development of
Drain repair both
Work order no:
side of main
BEPZ/CE/DEPZ/C BEPZ 16,38,643. Ongoi
03 road, footpath of
R/330/113 A 66 ng
West side of old
Date: 15.05.2006
zone at Dhaka
EPZ.
Laxmipur office
Building. 9-Town Work order No: 9-
Ongoi
04 Power Town/ Feni-3/111 PDB 15,75,596
ng
Distribution Date: 28/03/04
Project Division-3
05 Modernization of Work order: EED 1,60,59,87 Ongoi
Existing 20 XEN/EED/CHAND, 2.89 ng.
polytechnic ZONE/1151/15
Institute and
Establishment of
New 18
Polytechnic
Institute.
Maintenance of Work order No:
33/11 KV sub DESCO/CS/Bid
39,84,580. Ongoi
06 station, 11 KV Notice No: DESA
90 ng.
switching 08/2005/2006/67
stations (MSS) 5
Total=
5,95,78,599.24
Profile of E & A Construction
(up dated up to June, 2006)

Work completed for last 05 years

Work/Supply Executed By M/S. E &A


Construction For The Year 2001

Name
Sl. Date of
Work of Work
N Name of Work comple
Order No. Organ Value
o. tion
.
XEN/Div-
Work order fort
6/BL-
rehabilitation of flood
30/4.02/200 50,15,942. 15.01.2
1 damaged line under DESA
1/27 03 001
Basundhara – Baridhara
Dt:
33 Kv overhead feeder.
15.01.01 .
BEPZA/CE-
Construction work of “C”
11/99/559 BEPZA 56,48,032. 15.07.2
2 type building in Dhaka
Dt. 98 001
EPZ Residential Area.
12/10/2000
Name
Sl. Date of
Work of Work
N Name of Work comple
Order No. Organ Value
o. tion
.
Construction work of 2 BEPZA/CE-
Storied zone service 11/19/593 BEPZA 1,99,84,49 09.11.2
3
building at IEPZ, Dt. 9.01 001
Pakshey, Pabna. 23.10.2000
Construction of
Boundary wall and XEN/Civil/99
Sewerage Drain at /2.05/66. 52,43,247. 31/11/2
4 DESA
residential area of DPH Date:22/08/ 61 001
Paribagh under civil 99
works div., DESA.
Conversion work of
residential building as
office building of Ex.En./DD-4/
commercial director s 2001/2.05/39 24,29,371.
5. DESA 23.06.01
dept. I Khilgaon 33/11 KV Date: 04
Sub-station under Greater 14.03.2001
Dhaka Electric Supply
Project.
Construction of 2nd & 3rd
Ex.En./DD-5/
floor at Paribagh DPH 1000
2001/2.01/27 34,45,915. 07.08.20
6. sq.ft. Residential area DESA
Date: 46 01
unser Greater Dhaka
31.01.2001
Electric supply Project.
Extension work of Jinjira
Facilitie 16,62,500. 24.12.20
7. P.M. Pilot Girls High
s Dept. 00 01
School;.
Ex.En./DD-
Repair, service and
5/
supply of spare parts for
2001/2.01/1 13,02,032. 07.02.2
8. air-condition system at DESA
20 55 002
ground, 2nd & 3rd floor in
Date:
DESA office Profile of E & A Construction
30.05.2001
(up dated up to June, 2006)
Name
Sl. Date of
Work of Work
N Name of Work comple
Order No. Organ Value
o. tion
.
Tender
Enquiry
No:23/ER-
Supply of 11KV 9,09,990.0 25/09/2
9. 3/Lighting DESA
Lightning Arrester. 0 001
Arrester
Dt:23.05.20
01
Tender
Supply of Jointing Enquiry No.
10 17,69,576.
materials and 30/O&M/ DESA
. 50
termination kits. Fuse &
Access.
Tender
Enquiry no.
11 Supply of Lighting 245/2001/R 28,20,000. 23/09/2
BPDB
. Arrester. ev./Lot-2 00 001
Dt:
21.05.2001
Barind
Tenser
ra
Enquiry No.
Multipl
Barins/Raj/
12 Supply of 11 KV Pin e 11,34,000. 12/02/2
13/2001-
. Insulator Develo 00 002
2002
p.
Dt:
Author
12.11.2001
ity
Total=5,13,65,
107.18
Profile of E & A Construction
(up dated up to June, 2006)

Work/Supply Executed By M/S. E &A


Construction For The Year 2002

Name
Sl Date of
Work Order of Work
. Name of Work complet
No. Orga Value
N ion
n.
o.
23/ER-
Supply of 11 kV 3/Lighting
9,09,990.0 09.01.
1 Lighting Arrester (1000 Arrester DESA
0 2002
Nos.) Dt.
11.09.2001
25/O&M/ DOF
Supply of 10.5 kV
& LA 14,39,625. 13.02.
2 Lighting Arrester (1500 DESA
Dt. 00 2002
Nos.)
16.10.2001
Construction work of
1000 Sft complete
XEN.Civil/01/
residential building
2.05/66 1,89,98,238. 15.02.20
3 with 5-storied DESA
Dated: 00 02
foundation at DPH
02/08/01
Paribagh area under
DESA.
Name
Sl Date of
Work Order of Work
. Name of Work complet
No. Orga Value
N ion
n.
o.
BMDA/BDEP-
Supply of 11 kV Pin BMD 11,34,000. 31.03.
4 50/2001 Dt.
Insulator with Pin. A 00 2002
31.12.2001
30/O&M/Fuse
Supply of Jointing
&
materials and Fuse & 17,69,576. 10.06.20
5 Accessories. DESA
Accessories ( For Lot- 50 02
Dated:
1)
10.02.2002
Supply of 11 kV Pin 35/ Phase-
Insulator with Pin and IV/Insulator 80,37,000. 17.06.
6 DESA
11 kV Disc Insulator Dt. 00 2002
with Fittings 17.02.2002
32/Phase-IV/
Supply of 11 kV DOF,
DOF 35,68,200. 17.06.
7 11 kV Fuse and 9 kV DESA
Dt. 00 2002
Surge Arrester.
17.02.2002
Supply of 11 kV Pin
Pur-18T/66/
Insulator with Pin & 30,29,775. 08.10.
8 2001 BPDB
Disc Insulator with 00 2002
Dt. 10.06.02
fittings Profile of E & A Construction
(up dated up to June, 2006)

Name
Sl Date of
Work Order of Work
. Name of Work complet
No. Orga Value
N ion
n.
o.
Construction of
Boundary wall and XEN/Civil/99/
Sewerage Drain at 2.05/66. 52,43,247. 31/11/20
9. DESA
residential area of DPH Date:22/08/9 61 01
Paribagh under civil 9
works div., DESA.
Name
Sl Date of
Work Order of Work
. Name of Work complet
No. Orga Value
N ion
n.
o.
Total=
4,41,29,652.
11

Work/Supply Executed By M/S. E &A


Construction For The Year 2003

Name
Sl. Date of
Work of Work
N Name of Work comple
Order No. Organ Value
o. tion
.
BEPZA/CE-
Construction of
12/03/350. 35,13,129. 20/06/2
1. boundary wall at main BEPZA
Dt: 93 003
custom fencing.
22/02/03
Work No:
33/11 KVA , 20/28 MVA PS-3 Pur-
2,70,00,00 20/03/0
2. & 10/14 MVA Power 2/20 DESA
0.00 3
Transformer Supply Date:20/11/
2002
Construction work of
3000 Sft 5-Storied XEN/civil/01
residential building at /2.03/493 DES 1,36,63,41 20.04.2
3.
Kamlapur 33/11 kv Sub- Dt: A 2.00 003
station area under 22/10/2002
DESA.
Electricity network
XEN/DD-
development work at
4/03-
Chashara crossing to 56,45,457. 17.05.2
4. 04/2.05/16. DESA
Killarpole crossing under 18 003
Dated:
S&D division,
07/02/04.
Narawangang , DESA
Name
Sl. Date of
Work of Work
N Name of Work comple
Order No. Organ Value
o. tion
.
Total=
4,98,21,999.11
Profile of E & A Construction
(up dated up to June, 2006)

Work/Supply Executed By M/S. E &A


Construction For The Year 2004

Nam
Sl Date of
Work Order e of Work
. Name of Work complet
No. Orga Value
N ion
n.
o.
Construction of 33/11 KV Work Order
S/S Control room of No.: 9 Town
laxmipur with others Elec. BPDB 70, 15/02/04
relevent works under Feni Supp.Proj.BBPD 31,
01 713
group-3, 9-town B/2003Admin-
electricity 23/ 1922. .00
/distribution/supply project Dated:
division-3, BPDB. 01/07/2003
Work Order
Construction of Electricity No.: 9 38,03,085
Supply office building at Town/Feni- .00 04/09/04
02 Laxmipur under 9-Town 3/Work Order- BPDB
Pow. Distr. Project, Division- 7/2004/109.
3, BPDB, Feni. Dated:
28/03/2004.
03 Work Order EED 15/10/04
Construction work of No.: 60,55,711
Laxmipur Women hostel XEN/EED/Chad/ .00
building at Laxmipur . Zone/713,
Dated :
05/11/2003.

Renewal & Rehabilitation of


11 KV/0.4 Kv line
distribution sub-station for Work Order
supplying of 11/0.4/0.235 No.: 9 Town/ 15,55,773 05/08/0
KV line at progoti road, Feni-3/Work .00 4
BP
04 baishmara road and Last Order-
DB
portion of Ramgoti road 7/2004/114
(Partial) of Dokkhin Dated:
temohoni feeder laxmipur 28/03/2004
town under 9-town Pow.
Distri. Project BPDB, Feni.
Renewal & Rehabilitation of
11 KV/0.4 Kv line
Work Order
distribution sub-station for 15,75,596 01/09/0
No.: 9 Town/
11K/0.4/0.235 KV line .00 4
Feni-3/Work
05 Supply at Dokkhin Bazar,
Order- BPDB
. Puraton Adalat area and
7/2004/111
Mobarak colloni area of
Dated:
laxmipur town under 9-
28/03/2004
town Pow. Distri. Project
BPDB, Feni.

Profile of E & A Construction


(up dated up to June, 2006)

Nam
Date of
Sl. Work Order e of
Name of Work Work Value completi
N No. Orga
on
o. n.
PS-3/-2/15
Supply of 33/11 KV 20/28 3,96,00,00 07/06/20
06 Date: DESA
MNA Power transformer. 0.00 05
07/12/2004
Construction of security
9-Town/Feni-
wall, 9- Town Laxmipur 1,04,465.0 26/02/20
07 3/W.O – PDB
33/11KV sub station switch 0 05
7/2004/420
yard & construction area.
Notification of electricity
distribution network
XEN/DD-4/03-
development from chaser
04/2.01/25 3,98,462.0 23/06/20
08 crossing to killolpur PDB
Date: 0 05
crossing under
17/05/04
Narayangang sales and
distribution area.
Total=
5,41,24,805.0
0

Profile of E & A Construction


(up dated up to June, 2006)

Work/Supply Executed By M/S. E &A


Construction For The Year 2005
Sl Nam Date
. Work Order e of Work of
Name of Work
N No. Orga Value compl
o. n. etion
Work Order
Construction of 600 Sft No.: Tongi 80
2-units MW
01 3-storied building at GTPS/2004/363.
Tongi under Tongi 80 BPDB 54,80,521. 04/02/0
Dated: 80 4.
MW GTPS Project..
02/06/2004.
Construction of Work Order No: EED 1,60,59,87 28/12/0
Acadimic Building X- 2.89 5
02 (Part-2) at Laksmipur EN/EED/CHAND/
ZONE/1151/15
Polytechnic Institute.
Dated:28/12/04
Construction of
9-Town/Feni- 14/05/2
Boundary wall vertical
3/W.O-7/05/87 1,96,370.0 00
03 extension at 9- Town, PDB
Date: 0 5
Laxmipur Division-3,
16/04/2005
Feni.
Repair of Boundary
9 Town/ Feni- 14/05/2
wall in 9-Town , 1,99,320.0
04 3/W.O-7/05/88 PDB 00
Laxmipur Division-3, 0
16/04/2005 5
Feni.
Construction of Main 20/05/2
security gate & water 9-Town/Feni- 00
supply at office 3/W.O-7/05/95 1,92,112.5
05 PDB 5
building and sub Date:23/04/200 0
station in 9-Town 5
Laxmipur, Feni.
Construction of Guard
9-Town/Feni- 25/05/2
wall at residential area
3/W.O-7/05/106 1,99,705.0 00
06 & office area in 9-Town PDB
Date:27/04/200 0 5
Laxmipur, Division-3,
5
Feni.
Construction of 27/06/2
residential Building in 9 00
Town, Laxmipur, 9-Town/Feni-
24,00,000. 6
07 Division-3, sels & 3/W.O-7/05/316 PDB
Division-3 Feni Dt: 18/10/2005 00
Sales & Distribution
division.
Total=
2,47,27,902.19
Profile of E & A Construction
(up dated up to June, 2006)

List of enlistment in various organizations

Sl. Name of Dept. Status of Enlistment Validity


No.
01 Dhaka Electric Supply Authority (DESA) “A” Class July’ 2007
02 Power Development Board (BPDB) “A” Class July’ 2007
03 Roads & Highway Department (R&H) G/2 Category July’ 2007
04 Water Development Board (WDB) G/2 Category July’ 2007
05 Local Government Eng. Dept. (LGED) Special Class July’ 2007
06 Facilities Dept. “A” Class July’ 2007
07 District Council (DC) “A” Class July’ 2007
08 Directorate General Defense Purchase (DGDP) July’ 2007
09 Electrical A, B, C July’ 2007

Organogram
Proprietor
General Manager (Admin) Manager (Finance) General Manager (Technical)
Manager (HRD) Chief Accountant Asstt. Asstt. Engineer
Engineer (Civil)
(Electrical)
Communication Office Accounts Officer Sub-Asstt. Sub-Asstt.
Executive Executive Engineer Engineer
(Electrical) (Civil)
Computer Office Cashier Site Site Executive
Operator Assistant Executive (Civil)
(Electrical)

Profile of E & A Construction


(up dated up to June, 2006)

Technical Personnel of the firm

Position Name Qualifications Years of Years of


Experien Experien
ce ce
(General) (In
proposed
position)
Project Manager Md. Abdul Barek B.Sc. Engg. 14 10
(Civil.)
Project Manager Tapan Kumar B.Sc. Engg. 06 04
Sarker (Civil.)
Project Engineer Mohammed Diploma Engg. 08 05
Emdadul karim (Civil)
Asst. Engineer Md. Liton Azad Diploma Engg. 06 05
(Civil) (Civil)
Asst. Engineer Md. Maruf Hossain B.Sc. Engg. 01 01
(Elec.) (Elec.)
Astt. Engineer Md. Nuruzzaman Diploma Engr 14 10
(Elec)
Sub-Asst. Engineer Md. Masudur Diploma Engg. 04 03
(Civil) Rahman (Civil)
Sub-Asst. Engineer Abdul Based Miah Diploma Engg. 10 05
(Civil) (Civil)
Plumber
Saydur Rahman Class-Vlll 06 05
Khan
Md. Mahfujul Class- lX 09 05
Haque
Md. Iftekharul Class-Vlll 10 08
Ahmed
Profile of E & A Construction
(up dated up to June, 2006)

List of Office equipment and logistics


of E&A Construction
Sl. Quantit
No.
Description Model/Name y
Remarks
Office Location of 8/1 (3rd Floor), Aurangazeb
Road, Mohammadpur, Dhaka-1207.
S
p
01 3000 sft. In Order
a
c
e
Computer Intel Pentium I & III, Laptop (ACER)
02 4 Nos. “
with printer Pentium III with HP Deskjet 610 c
Printer-Canon Laser LBP 1120, HP
03 Printer Deskjet 610C, Canon BJC 265 SP, 4 Nos. “
Canon S200SPX
UMAX Astra 2100s,
04 Scanner 2 Nos. “
Canon N640P
Photo Copier Toshiba-1370
05 1 Nos. “
Machine
Internet BOL (2 Nos.), VHSNET (1 No),
06 4 Nos. “
Connection ProshikaNet (1 No)
07 Fax Machine Olympia OX 500 1 Nos. “
08 Air Cooler American Air, General, Singer 4 Nos. “
Office Chair Table, Conference chair/table
09 40 Nos. “
Furniture sets, computer table and others
10 Genertors YongDong, 2 KVA 2 Nos. “
a) 8116363
b) 9128614
11 Telephone 4 Nos. “
c) 9110207
d) 9711381
a) Toyota (Jeep) 1500 cc (1999)
Dhaka-Metro-Ga-15-6790
b) Toyota (Platz) 1300 cc (Car)
12 Motor Car 3 Nos. “
Dhaka-Metro-Ga-15-1259
c) Toyota (Micro bus) 2430 cc (1997)
Dhaka-Metro-Ga-11-3858
Toyota (1.5 Ton) 1995
13 Pick Up 1 Nos. “
Dhaka-Metro-Ma-1049
Honda-125 cc
14 Motor Cycle LML-150 cc 3 Nos. “
DELIM-100 cc
Profile of E & A Construction
(up dated up to June, 2006)

Sister Concern of E&A Construction


1. SEMP Trading Co.
8/1 (3rd Floor), Aurangazeb Road,
Mohammadpur,
Dhaka-1207.

2. Consortium of Razon Associates and E&A Construction


82 (2nd Floor), Outer Circular Road,
Moghbazar,
Dhaka-1217.

3. Priti International
47-A, Balaram Bose Lane
(1st Floor),
Kolkata,
India.

4. SUMEC.

5. LONGGUANG.

6. Other (Battery and Companies).

Legal Documents

Profile of E & A Construction


(up dated up to June, 2006)
 Tread License.

 Vat Certificate.

 TIN.

 IRC/ERC.

 ABC License.

 Other Certificate.
Financial Document

 Bankers Name:

 Eastern Bank:
Phone No:
Profile of E & A Construction
 Trust Bank:
(up dated up to June, 2006)
Phone No:

 Bank Solvency : Attached

 Bank Statement: Attached

 Liquid Assets : Attached

 Auditors Report: Attached

 Bank Guarantee: Attached