HCMC-BRT1-FDD-V02A-FB01-006 01 FOOTBRIDGE KM 0+077 PLAN LOCATION OF BRIDGE MẶT BẰNG VÀ ĐỊNH VỊ CỦA CẦU
HCMC-BRT1-FDD-V02A-FB01-010 01 FOOTBRIDGE KM 0+077 GENRAL ARRANGEMENT OF NEW STAIR BỐ TRÍ CHUNG CẦU THANG MỚI
HCMC-BRT1-FDD-V02A-FB01-012 01 FOOTBRIDGE KM 0+077 REINFORCEMENT OF NEW STAIR CỐT THÉP CẦU THANG XÂY MỚI (1/3)
HCMC-BRT1-FDD-V02A-FB01-013 01 FOOTBRIDGE KM 0+077 REINFORCEMENT OF NEW STAIR CỐT THÉP CẦU THANG XÂY MỚI (2/3)
HCMC-BRT1-FDD-V02A-FB01-014 01 FOOTBRIDGE KM 0+077 REINFORCEMENT OF NEW STAIR CỐT THÉP CẦU THANG XÂY MỚI (3/3)
HCMC-BRT1-FDD-V02A-FB01-023 01 FOOTBRIDGE KM 0+077 ARRANGEMENT OF ROOF OF BRIDGE BỐ TRÍ MÁI CẦU CHÍNH
HCMC-BRT1-FDD-V02A-FB01-025 01 FOOTBRIDGE KM 0+077 TYPICAL OF ROOF OF BRIDGE CHI TIẾT MÁI CẦU CHÍNH
HCMC-BRT1-FDD-V02A-FB01-028 01 FOOTBRIDGE KM 0+077 ARRANGEMENT OF ROOF OF STAIR BỐ TRÍ MÁI CẦU THANG
HCMC-BRT1-FDD-V02A-FB01-030 01 FOOTBRIDGE KM 0+077 TYPICAL OF ROOF OF STAIR CHI TIẾT MÁI CẦU THANG
HCMC-BRT1-FDD-V02A-FB01-033 01 FOOTBRIDGE KM 0+077 ARRANGEMENT OF STAIR HANDRAIL BỐ TRÍ CHUNG LAN CAN CẦU THANG
HCMC-BRT1-FDD-V02A-FB01-034 01 FOOTBRIDGE KM 0+077 TYPICAL DETAILS OF HANDRAIL CHI TIẾT MÁI LAN CAN
HCMC-BRT1-FDD-V02A-FB01-039 01 FOOTBRIDGE KM 0+077 INSTRUCTION FOR PAINTING AREA CHỈ DẪN CHO SƠN
HCMC-BRT1-FDD-V02A-FB01-042 01 FOOTBRIDGE KM 0+077 CONSTRUCTION METHOD BIỆN PHÁP THI CÔNG (1/2)
HCMC-BRT1-FDD-V02A-FB01-043 01 FOOTBRIDGE KM 0+077 CONSTRUCTION METHOD BIỆN PHÁP THI CÔNG (2/2)
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
DRAWING LIST
district 1, 2, 4, 5, 6, 8 CHECKED BY
DANH MỤC BẢN VẼ LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-001 _ 01 THIÕT KÕ 03/2020
GENERAL NOTE
GHI CHÚ CHUNG
A- GENERAL
1. UNLESS OTHERWISE SPECIFIED THESE NOTES ARE APPLICABLE TO ALL DRAWINGS FOR PEDESTRIAN BRIDGE.
AND RESPECTIVE SUBSTRUCTURE..
2. IN DRAWINGS, ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
3. ALL DIMENSIONS ARE IN 'MM' AND LEVELS IN 'M' UNLESS SPECIFIED OTHERWISE.
4. THESE NOTES ARE TO BE FOLLOWED IN CONJUNCTION WITH DESIGN MANUAL, WORKS SPECIFICATIONS AND EMPLOYER'S
REQUIREMENT
5. REFERENCE MADE TO ANY DRAWING SHALL REFER TO THE LATEST REVISION OF THE SAID DRAWING.
6. THE SCALES INDICATED ON THE DRAWINGS ARE FOR A3 SIZE.
A- CHUNG
1. NGOẠI TRỪ KHI CÓ CÁC QUY ĐỊNH KHÁC CÁC GHI CHÚ NÀY SẼ ĐƯỢC ÁP DỤNG CHO CẦU ĐI BỘ VÀ KẾT CẤU PHẦN DƯỚI.
2. TRONG CÁC BẢN VẼ, PHẢI THEO CÁC KÍCH THƯỚC ĐƯỢC THỂ HIỆN.
3. TẤT CẢ CÁC KÍCH THƯỚC ĐƯỢC TÍNH BẰNG 'MM' VÀ CÁC CAO ĐỘ ĐƯỢC TÍNH BẰNG 'M' TRỪ KHI CÓ QUI ĐỊNH KHÁC.
4. CÁC GHI CHÚ NÀY ĐƯỢC THÔNG NHẤT VỚI SỔ TAY THIẾT KẾ, CHỈ DẪN CÁC CÔNG TÁC VÀ YÊU CẦU CỦA CHỦ ĐẦU TƯ
5. THAM KHẢO BẤT KỲ BẢN VẼ NÀO CŨNG PHẢI THỰC HIỆN TRÊN PHIÊN BẢN CUỐI CÙNG CỦA BẢN VẼ ĐÓ.
6. CÁC TỶ LỆ THỂ HIỆN TRÊN BẢN VẼ SỬ DỤNG CHO KHỔ A3
C- CONSTRUCTION LOADS
1. CONTRACTOR SHALL CHECK ALL KIND OF IMPACT ON PERMANENT STRUCTURE DUE TO CONSTRUCTION METHOLODGY AND TEMPORARY STRUCTURES
2. FOR DETAILED CONSTRUCTION METHODOLOGY REFER RELEVANT DRAWINGS.
3. THE CONTRACTOR NEEDS TO CHECK THE STABILITY AND THE EFFECT OF HIS EQUIPMENTS ON THE ENVIRONMENT, ESPECIALLY THE
STABILITY OF THE TRANSPORTER, THE LIFTING CRANE, AND THEIR IMPACT ON THE EXISTING ROAD AND UTILITIES.
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
GENERAL NOTE
district 1, 2, 4, 5, 6, 8 CHECKED BY
GHI CHÚ CHUNG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(1/2) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-003 _ 01 THIÕT KÕ 03/2020
GENERAL NOTE
GHI CHÚ CHUNG
L
CỐT ĐAI VÀ GIẰNG D
(Type 2) 32 40 48 56 64 108 120 132 150 224 256 288 STIRRUP AND TIE
(LOẠI 2) CỐT ĐAI VÀ GIẰNG
(Type 2) 48 60 72 84 96 216 240 264 300 336 384 432
(LOẠI 2)
GENERAL
TỔNG QUÁT
(Type 1) 48 60 72 84 96 108 120 132 150 168 192 216
L (LOẠI 1)
BAR DIMENSIONS D
STIRRUP AND TIE
CÁC KÍCH THƯỚC THANH CỐT ĐAI VÀ GIẰNG 75 75 75 84 96 108 120 132 150 168 192 216
- THE DIMENSIONS ARE GIVEN ON THE OUTSIDE FIBER OF THE REBAR (SEE BELOW) (Type 2)
(LOẠI 2)
- CÁC KÍCH THƯỚC ĐƯA RA CHO THỚ BÊN NGOÀI CỦA THANH CỐT THÉP (XEM DƯỚI ĐÂY)
- THE TOTAL LENGTHS ARE CALCULATED ON THE BASIS OF THE CENTERLINE.
- TỔNG CÁC CHIỀU DÀI ĐƯỢC TÍNH TRÊN CƠ SỞ ĐƯỜNG TIM.
(ISO 3766:2004 - METHOD B) GENERAL
(ISO 3766:2004 PHƯƠNG PHÁP B) L TỔNG QUÁT
65 65 65 65 65 72 80 88 100 112 128 144
(Type 1)
- THE BENDING ANGLES ARE GIVEN IN DEGREES. (LOẠI 1)
- CÁC GÓC UỐN ĐƯỢC GHI THEO ĐƠN VỊ ĐỘ. D
STIRRUP AND TIE
CỐT ĐAI VÀ GIẰNG 65 65 65 65 65 72 80 88 100 112 128 144
(Type 2)
(LOẠI 2)
NOTE:
GHI CHÚ :
- THESE TABLES SHOW BENDING DIAMETER AND STANDARD
HOOKS SHAPE WHICH TO BE USED FOR REBAR DETAILING.
- CÁC BẢNG NÀY THỂ HIỆN ĐƯỜNG KÍNH CONG VÀ HÌNH DẠNG CÁC MÓC
TIÊU CHUẨN ĐƯỢC SỬ DỤNG TRONG CHI TIẾT THANH.
- D - HIGH ADHESION STEEL REINFORCEMENT
- D - CỐT THÉP DÍNH BÁM CAO
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
GENERAL NOTE
district 1, 2, 4, 5, 6, 8 CHECKED BY
GHI CHÚ CHUNG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(2/2) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-004 _ 01 THIÕT KÕ 03/2020
PLAN AND LOCATION OF BRIDGE KM0+077
TD2 7
CBH1
6 5 H1 4 D1 3 2 1 DPA
1A HIGHT WAY
QUỐC LỘ 1A
BRT
BRT
TC4
P5 TD5
CR1 TC5
15960
Align
17m
1 2 3
BRT
TO LONG AN
HƯỚNG ĐI LONG AN
H7 18 19 20 21 H8 22 23 24 25
Ñoùng daûi
ExistingFoot Bridge 01
phaân caùch COORDINATES OF PIER
Km 0+077
POINT E (M) N (M)
1 592828.8794 1185637.0196
2 592827.8288 1185630.8230
3 592826.6822 1185624.0595
+8.715
4700
4700
+2.690
30615 30410
+0.700 0 10 20 30
-0.30
-2.00
1
GEOLOGICAL SYMBOL
2
KÝ HIỆU ĐỊA CHẤT
1
THIS IS FILL SOIL LAYER: THE MAIN COMPONENTS OF
THIS LAYER ARE SILTY SAND, BRICK, STONE, GRAVEL
LỚP ĐẤT PHỦ, THÀNH PHẦN CHÍNH LÀ CÁT BÙN, GẠCH, ĐÁ, SỎI.
2
BORED PILE D800, L=28M
CỌC KHOAN NHỒI D800, L=28M
ORGANIC CLAY, GREENISH GREY, BROWNISH GREY (OH)
1 SÉT HỮU CƠ, XÁM XANH, XÁM NÂU
1. The bored hole STA-BH1 was used for design2 which has distanceSILTY about 30m to
SAND, GREENISH the
GREY, center
MEDIUM DENSE,of pile cap.
SATURATION WITH WATER (SM)
In next stage, it is necessary to implement one bored hole at center of pile cap to confirm actual geological
CÁT BÙN, XÁM XANH, CHẶT VỪA, BÃO HÒA NƯỚC.
-17.10
conditions and the length of piles. The depth of implement
11 bored hole should be deeper 5.0m to the tip of
REFERENCE BOREDHOLE LOG STA-BH1 OF STATION
piles. LỖ KHOAN ĐỊA CHẤT THAM KHẢO STA-BH1 CỦA NHÀ CHỜ XE BUÝT
6
NOTES:
4 GHI CHÚ:
1: THE DESIGN HOLE IS TO USE A STA-BH1 DRILL HOLE ABOUT 30M FROM THE PILE CAP. AT THE
CONSTRUCTION STAGE, IT IS NECESSARY TO DRILL AT THE PILE POSITION TO CHECK AGAIN,
3 THE DEPTH OF THE HOLE MUST BE AT LEAST 5M DEEPER THAN THE PILE SHOE LEVEL.
1: LỖ KHOAN ĐƯỢC THIẾT KẾ LÀ DÙNG LỖ KHOAN STA-BH1 CÁCH BỆ KHOẢNG 30M. Ở BƯỚC THI CÔNG CẦN TIẾN
HÀNH KHOAN TẠI VỊ TRÍ CỌC ĐỂ KIỂM TRA LẠI, CHIỀU SÂU LỖ KHOAN PHẢI SÂU HƠN CAO ĐỘ MŨI CỌC ÍT NHẤT 5M.
-25.80 6
-27.300
16
18
-29.30
+8.715 +8.705 B
FALL 10 FALL 10
A
62 393 125
580
1355 463
18@150
=2700
A STAIRCASE PIER D500
TRỤ CẦU THANG D500
B
+6.005 225 650 500 650 225
2250
=2700 6300
SECTION B-B
18@150
A
PIER P2
TRỤ P2
Trao đổi vs (MẶT CẮT B-B)
SCALE: 1/50
D500 Nghĩa kiểm tra D500
+3.305
TỶ LỆ: 1/50
2250
lại tên cọc trong
Bored Pile BP3 - 225 1800 225
450 450
bảng tính SCT
900
D800, L=28.0m
560
cọc.
62300 218
+2.385
BORED PILE D800, L=28M
580
Bored Pile BP1 - CỌC KHOAN NHỒI D800, L=28M
1000
1000
D1000 D1000
D800, L=28.0m
225 650 500 650 225
+0.700 +0.700 -25.615 2250
BORED PILE D800, L=28M BORED PILE D800, L=28M
CỌC KHOAN NHỒI D800, L=28M CỌC KHOAN NHỒI D800, L=28M
-27.300 -27.300 900 1740
"WABO" TWO PART
2640
SILICONE SEALANT
3500 6285
18105
Bored Pile6580
BP2 - 1740 L =3.35m
DETAIL "A"
D800, L=28.0m CHI TIẾT "A"
"WABO" TWO-PART
SILICONE SEALANT
225
2250
1800
225
POLYETHYLENE 10
BACKING ROD
DETAIL "A"
3500 6285 6580 1740
CHI TIẾT "A"
18105 SCALE: 1/1
TỶ LỆ: 1/1
125
D16 D10@200 f'c=35 MPa (CYLINDRICAL)
D16 10 10
1025
CONCREATE COVER FOR BEAM: 40mm.
900
07
D16@200 D16@200 CONCREATE COVER FOR PILE, PILE CAPS: 75mm.
08 09 09
06 (varies) (varies) 2. LỚP BẢO BẢO VỆ THÉP CẦU THANG: 25mm.
LỚP BẢO BẢO VỆ THÉP DẦM: 40mm.
LỚP BẢO BẢO VỆ THÉP CỌC, ĐÀI CỌC: 75mm.
D16@200 D16@200 D16@200 3. REINFORCEMENT SHALL CONFORM ASTM A615, GRADE 60
04 09 04 06
(varies) 3. CỐT THÉP PHẢI PHÙ HƠP VỚI TIÊU CHUẨN ASTM, LOẠI 60
SECTION 1-1
SECTION 1-1 2 1
SCALE: 1/40
TỶ LỆ: 1/40
D16@200
06 09 D16 7054 3 21.16 33.436
1/2 SECTION 3-3
1/2 SECTION 3-3
5@200
1 1
10 D10 2684 1 2.68 4.241
D16@200
1/2 SECTION 4-4
05 SCALE: 1/40 D ≤ 10 : 12.217 Kg CONCRETE (BÊ TÔNG): 4.69 m3
TỶ LỆ: 1/40
155
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
REINFORCEMENT OF NEW STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
CỐT THÉP CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(1/3) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-012 _ 01 THIÕT KÕ 03/2020
D10@600
REINFORCEMENT OF NEW STAIR B
18
CỐT THÉP CẦU THANG XÂY MỚI
1
58 109 158 8@200=1600 158 109 58
D16@200 A
04
D16@200 D16@200
04 02 20
160 60
D16@200 07 11
218
15
20
28
@2 08 12
00
580
=5
150
60
1 0
300
06 10
60 150
05 09
62
D10@600 2 D10@600 D16@200
17 17 A 03 01
D10@200
B 19
D16@200
02 225 1800 225
21 22 @100
D16@200 2250
D16@200 13
03 22 21
SECTION 1-1
MẶT CẮT 1-1
SCALE: 1/20
TỶ LỆ: 1/20
D20 D10@600
16 18 1
2
D16 DETAIL 1 20
D10@200 12 28
19 CHI TIẾT 1 @2
00
=5
60
D20 SECTION A-A 0
11
D20 MẶT CẮT A-A D16@200
09 SCALE: 1/40 53 02
0
TỶ LỆ: 1/40
D10@600
17
D16 1
10
D16@200 D16@200
14 01
53
0
60
0
D10@200 60
19 0
125
07 D20
05
14
53
580
D16
150
0
393
06
14
D10@200
60 150
23 66
0
09 70
0
62
D10
24
D10@600 D10@200
18 03 21 19 60
0
100 8@200=1600 100
225 1800 225 70
0
2250
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
REINFORCEMENT OF NEW STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
CỐT THÉP CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(2/3) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-013 _ 01 THIÕT KÕ 03/2020
REINFORCEMENT OF NEW STAIR
CỐT THÉP CẦU THANG XÂY MỚI
NOTES:
GHI CHÚ:
1. CONCRETE GRADE FOR REINFORCEMENT STAIRCARE
f'c=35 MPa (CYLINDRICAL)
1. CẤP BÊ TÔNG CHO CAU THANG f'c = 35MPa (HÌNH TRỤ)
2. CONCREATE COVER FOR STAIRCASE: 25mm.
CONCREATE COVER FOR BEAM: 40mm.
CONCREATE COVER FOR PILE, PILE CAPS: 75mm.
2. LỚP BẢO BẢO VỆ THÉP CẦU THANG: 25mm.
LỚP BẢO BẢO VỆ THÉP DẦM: 40mm.
LỚP BẢO BẢO VỆ THÉP CỌC, ĐÀI CỌC: 75mm.
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
REINFORCEMENT OF NEW STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
CỐT THÉP CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(3/3) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-014 _ 01 THIÕT KÕ 03/2020
1000
DETAIL PILE CAP OF PIER STAIRCASE
250 500 250 CHI TIẾT ĐÀI CỌC TRỤ CẦU THANG
CONSTRUCTION JOINT
100
MỐI NỐI THI CÔNG
1000
PILES TRIMMING
ĐẬP ĐẦU CỌC
150
REINFORCEMENT SCHEDULE OF PILE CAP
D20
002 THỐNG KÊ CHO ĐÀI CỌC CẦU THANG
BORED PILE D800 DIVISION : 12
CỌC KHOAN NHỒI D800 D12@150 PHÂN CHIA : 12 NO. DIAMETER LENGTH QUANTITY TOTAL LENGTH TOTAL WT.
004 CTC : 93.2 SỐ HIỆU ĐƯỜNG KÍNH (MM) CHIỀU DÀI (MM) SỐ THANH TỔNG CHIỀU DÀI (M) TỔNG KL
D12@150
003
D20
002 DIVISION : 16
D20 PHÂN CHIA : 16
001 CTC : 158.2
660
STARTER BAR
D12@150 THÉP CHỜ TỪ CỌC
004
2 2
NOTES:
GHI CHÚ:
155
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
PIER OF STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
TRỤ CẦU THANG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(1/2) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-016 _ 01 THIÕT KÕ 03/2020
PIER OF STAIR
TRỤ CẦU THANG
1 1
240 D20
300
001
DIVISION : 12
D12@150
25
PHÂN CHIA : 12
002
CTC : 93.2
SECTION 1-1
MẶT CẮT 1-1
2 2 SCALE 1:25
TỶ LỆ 1:25
D20
001
D12@150 DIVISION : 12
002 D12@150 PHÂN CHIA : 12
002 CTC : 93.2
16 D20
D12@200
001
SECTION 2-2
MẶT CẮT 2-2
STAIRCASE PIER HEIGHT
SỐ HIỆU ĐƯỜNG KÍNH (MM) CHIỀU DÀI (MM) SỐ THANH TỔNG CHIỀU DÀI (M) TỔNG KL
PIER 1: H1 = 6592 MM
PIER 2: H1 = 3892 MM
D12@100
002
1000
660
CHỈ DẪN TRỤ CẦU THANG 1. TẤT CẢ KÍCH THƯỚC TRONG BẢN VẼ LÀ mm
2 CONCRETE GRADE FOR COLUMN f'c=35 MPa
2. CẤP BÊ TÔNG CHO TRỤ f'c = 35MPa (HÌNH TRỤ)
PILE CAP D1000 PIER HEIGHT PIER - H1 (m) ELEVATION A (m) 3. CLEAR COVER FOR PIER : 50mm.
ĐÀI CỌC TRÒN D1000 TRỤ CHIỀU CAO TRỤ (m) CAO ĐỘ A (m) CLEAR COVER FOR PILE CAP : 75mm
3. LỚP BẢO VỆ CHO TRỤ : 50MM.
PIER 1 6592 + 1.700 LỚP BẢO VỆ CHO ĐÀI CỌC : 75mm
PIER 2 3892 + 1.700 4. ALTERNATED LAP SPLICE MAY BE USED FOR MAIN LONGITUDINAL
REINFORCEMENT D20 , LAP SPLICE LENGTH SHALL BE ≥ 660 MM
4. ĐOẠN NỐI CHỒNG SO LE SỬ DỤNG CỐT THÉP CHÍNH VỚI
CHIỀU DÀI ĐOẠN NỐI THEO QUY ĐỊNH CỦA D20, VỚI CHIỀU DÀI ≥ 660MM
PIER OF STAIR
TRỤ CẦU THANG
SCALE 1:25
TỶ LỆ 1:25
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
PIER OF STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
TRỤ CẦU THANG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(2/2) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-017 _ 01 THIÕT KÕ 03/2020
PILE OF STAIR
CỌC CẦU THANG BP1 BP2 BP3
THE PARAMETER OF PILES / BẢNG SỐ LIỆU CỌC NOTES :
GHI CHÚ :
PILE CUT-OFF LEVEL TYPE OF PILE LAYOUT
CAO ĐỘ ĐẬP ĐẦU CỌC P1 P2 P3 1. CONCRETE OF PILE: f'c=30 MPa (CYLINDER)
03 BỐ TRÍ LOẠI CỌC
1. CƯỜNG ĐỘ BÊ TÔNG CỌC : f'c=30 MPa ( HÌNH TRỤ)
D (mm) 800 800 800 2. REINFORCEMENT YIELD STRENGTH : fy=420 MPa
150
D10@2000
ELEV.A (m) +0.700 +0.700 +0.700 Update lại cao độ này
2 CƯỜNG ĐỘ CHẢY CỦA CỐT THÉP : fy=420 MPa
8@100=800
SONIC TUBES 005 CAO ĐỘ A (m) 3. MINIMUM CONCRETE COVER : c=75mm
700
ELEV. A ỐNG SIÊU ÂM ELEV.B (m) -27.300 -27.300 -27.300
3. LỚP BÊ TÔNG BẢO VỆ TỐI THIỂU : c=75 mm
CAO ĐỘ A
CAO ĐỘ B (m) 4. LAP SPLICE METHOD IS ONLY INDICATION
PILE LENGTH: H(m) 4. BIỆN PHÁP NỐI CHỒNG CỐT THÉP CHỈ MANG TÍNH BIỂU THỊ
150
28 28 28
D12@175
004
800
DIVISION 12
PHÂN CHIA 12
C.T.C 156
REINFORCEMENT SCHEDULE
THỐNG KÊ CỐT THÉP
01
SECTION A-A BAR
MẶT CẮT A-A SHAPE QUANTITY / SPACING BAR DIA
MARK NO. HÌNH
SỐ LƯỢNG / KHOẢNG CÁCH ĐƯỜNG
SCALE : 1/10 CỐT THÉP SỐ DẠNG KÍNH
TỶ LỆ: 1/10
H_PILE
A A 01 VARIES D22
- -
02 @2000 D28
03 @100 D12
04 @175 D12
1 CORING TUBE
1 ỐNG LẤY MẪU LÕI 05 @2000 D10
STEEL PIPES : 114MM(OUTER),
04 CÁC ỐNG THÉP : 114mm(BÊN NGOÀI), @2000 D10
06
2 SONIC TUBES T=3.5MM
2 ỐNG SIÊU ÂM T=3.5mm
STEEL PIPES: 60MM(OUTER), (THICKNESS IS INDICATIVE)
CÁC ỐNG THÉP: 60MM (BÊN NGOÀI) (BỀ DÀY CHỈ MANG TÍNH BIỂU THỊ)
T=3.5MM
T=3.5MM
12-D22
01 THICKNESS IS INDICATIVE,
BỀ DÀY CHỈ MANG TÍNH BIỂU THỊ
1000
200
REINFORCEMENT ULTRASONIC PILE
NAME N. PILE D. PILE L. TOTAL CONCRETE
TÊN SỐ CỌC D. CỌC (MM) TỔNG DÀI (M) BÊ TÔNG (M3) 10 < D ≤ 18 (KG) D > 18 (KG) TOTAL (KG) Din=107.3x3.5 (M) Din=60.5x2.3 (M)
ELEV. B
CAO ĐỘ B DETAIL AT PILE BOTTOM P1 1 800 28 14.58 350.92 1158.58 1509.50 28.05 57.7
200
CHI TIẾT TẠI ĐÁY CỌC P2 1 800 28 14.58 350.92 1158.58 1509.50 28.05 57.7
SCALE : 1/20
TỶ LỆ: 1/20
P3 1 800 28 14.58 350.92 1158.58 1509.50 28.05 57.7
ELEVATION VIEW TOTAL 3 0 84 43.73 1052.77 3475.73 4528.49 84.15 173.1
MẶT ĐỨNG
SCALE: 1/100 Update lại tên các cọc:
TỶ LỆ: 1/100
BP1,2,3
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
PILE OF STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
CỌC CẦU THANG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-019 _ 01 THIÕT KÕ 03/2020
ARRANGEMENT OF ROOF OF BRIDGE
BỐ TRÍ MÁI CẦU CHÍNH
67550
113 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2413 2500 2413 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 113
1800 625
4850
625 1800
NEW STAIRCASE
CẦU THANG X Y MỚI SUMMARY QUANTITY
TỔNG HỢP KHỐI LƯỢNG MÁI CẦU THANG
PLAN VIEW OF ROOF COLUMN NO. BAR SHAPE QUANTITY UNIT
MẶT BẰNG CỘT MÁI CHE SỐ HIỆU HÌNH D NG KHỐI LƯỢNG Đ N VỊ
SCALE: 1/200
TỶ LỆ: 1/200
001 125X125X4.5 2669.78 kg
A
STEEL COVER SHEET
TÔN LỢP
575 DETAIL C
3715 575 CHI TIẾT C
TRANSVERSE
575
407 247
575 BEAM 125X125 ,t=4.5
003
575 DẦM NGANG 125X125 ,t=4.5
575
265
524
TRANSVERSE
BEAM 125X125, t=4.5
DẦM NGANG 125X125, t=4.5 004 PURLIN 75X50 ,t=2.3
XÀ GỒ 75X50 ,t=2.3 BRACING 125X125 ,t=4.5 002
THANH GIẰNG 125X125 ,t=4.5
~ L ~
COLUMN 125X125 ,t=4.5 001
1650
CỘT 125X125 ,t=4.5
3550
3550
2896
DETAIL B
SECTION A-A
867
TYPICAL ELEVATON CHI TIẾT B
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
ARRANGEMENT OF ROOF OF BRIDGE
district 1, 2, 4, 5, 6, 8 CHECKED BY
BỐ TRÍ MÁI CẦU CHÍNH LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-023 _ 01 THIÕT KÕ 03/2020
TYPICAL OF ROOF OF BRIDGE
TRANSVERSE
CHI TIẾT MÁI CẦU CHÍNH
BOLTS M12 STEEL COVER SHEET BEAM 125X125 ,t=4.5 PURLIN 75X50 ,t=4.5 BOLTS M12 B STEEL COVER SHEET
BULONG M12 TÔN LỢP DẦM NGANG 125X125 ,t=4.5 XÀ GỒ 75X50 ,t=4.5 BULONG M12 TÔN LỢP
20
20
35
35
15 20
SECTION B-B DETAIL C
20
MẶT CẮT B-B CHI TIẾT C
SCALE 1:5 SCALE 1:5
TỶ LỆ 1:5 TỶ LỆ 1:5
TRANSVERSE STEEL PLATE 8mm
BEAM 125X125 ,t=4.5 PURLIN 75X50 ,t=4.5 BẢN THÉP 8mm
DẦM NGANG 125X125 ,t=4.5 XÀ GỒ 75X50 ,t=4.5
35 88 88 35 B
C C 1: DRILL HOLES FOR STARTER BAR ( BAR 001 )
D12@60 1: KHOAN LỖ ĐẶT THÉP CHỜ ( THANH 001)
004
2: INSTALL STARTER BAR USING EPOXY MORTAR
2: LẮP THÉP CHỜ , SỬ DỤNG KEO EPOXY
3: INSTALL OTHER BARS , PLACE FORMWORK AND CAST CONCRETE
94
D12 3: LẮP THÉP CÒN LẠI , LẮP VÁN KHUÔN , ĐỔ BÊ TÔNG
001
D D
60
CONCRETE D12@90
60
D12 002
PEDESTAL 003
BÊ TÔNG BỆ
94
001 002 003 004
85
BOLTS M16 4 4.00
35
BOLTS M16
75
BULONG M16 QUANTITY OF PEDESTAL: 56
D12@75
001
205
360
135
125
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
TYPICAL OF ROOF OF BRIDGE
district 1, 2, 4, 5, 6, 8 CHECKED BY
CHI TIẾT MÁI CẦU CHÍNH LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-025 _ 01 THIÕT KÕ 03/2020
ARRANGEMENT OF ROOF OF NEW STAIR
SUMMARY QUANTITY BỐ TRÍ MÁI CẦU THANG XÂY MỚI
TỔNG HỢP KHỐI LƯỢNG MÁI CẦU THANG
COLUMN TYPE III
BAR SHAPE QUANTITY UNIT CỘT LOẠI III TO DISTRICT 1
SỐ HIỆU HÌNH DẠNG KHỐI LƯỢNG Đ N VỊ ĐI QUẬN 1
5.00 %
001 125X125X4.5 1045.44 kg 1750 COLUMN TYPE II
11 CỘT LOẠI II
22
002 125X125X4.5 866.20 kg
62 A
003 125X125X4.5 667.44 kg 18 .5
23 %
004 75X50X2.3 262.97 kg
COLUMN TYPE I
TOTAL BOX STEEL 125x125x4.5 2579.08 kg 16 CỘT LOẠI I
30
TOTAL BOX STEEL 75x50x4.5 262.97 kg DETAIL C 2241
CHI TIẾT C 16
STEEL COVER SHEET 73.94 m2 40
COLUMN TYPE II
CỘT LOẠI II
STEEL PIPE D200, t = 5MM 54.10 kg
DETAIL B 18 6
CHI TIẾT B 23 2.5
PLATE D210 t=5mm 13.59 kg %
DETAIL B
NOTES : CHI TIẾT B 38.4°
GHI CHÚ :
1: ALL DIMENSIONS ON DRAWING ARE mm. A
1: TẤT CẢ KÍCH THƯỚC TRÊN BẢN VẼ LÀ mm.
2: REFER TO DWG HCMC-BRT1-DFD-V02A-FB01-030 FOR TYPICAL DETAILS PIER 1 PIER 2
2: THAM CHIẾU BẢN VẼ HCMC-BRT1-DFD-V02A-FB01-030 CHI TIẾT ĐIỂN HÌNH TRỤ 1 TRỤ 2
DETAIL A 2180
1960
BRACING 125X125 ,t=4.5 002
THANH GIẰNG 125X125 , t=4.5
2575
0
23
SECTION A-A
MẶT CẮT A-A
365
SCALE: 1/50
TỶ LỆ: 1/50
215
DETAIL B DETAIL C
CHI TIẾT B CHI TIẾT C
SCALE: 1/25 SCALE: 1/25
TỶ LỆ: 1/25 TỶ LỆ: 1/25
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
ARRANGEMENT OF ROOF OF NEW STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
BỐ TRÍ MÁI CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-028 _ 01 THIÕT KÕ 03/2020
2080 TYPICAL OF ROOF OF NEW STAIR
CHI TIẾT MÁI CẦU THANG XÂY MỚI
33.3°
38.4°
3026
2965
2865
295
5
2580
2597
233
168
5 190 5
5 190 5
70
70
70
93 93
93 93
93 93
354
354
354
354
354
354
190
190
190
32 32
32
45
45
45
93 93 93 93 93 93
STEEL PIPE D200, t = 5MM STEEL PIPE D200, t = 5MM STEEL PIPE D200, t = 5MM
1 2 2
ANCHORAGE BOLT M22 ANCHORAGE BOLT M22 ANCHORAGE BOLT M22
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
TYPICAL OF ROOF OF NEW STAIR
district 1, 2, 4, 5, 6, 8 CHECKED BY
CHI TIẾT MÁI CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-030 _ 01 THIÕT KÕ 03/2020
ARRANGEMENT OF NEW STAIR HANDRAIL
BỐ TRÍ CHUNG LAN CAN CẦU THANG XÂY MỚI
95 1900 50 1240 50 1200 50 1200 50 1200
1095
A
NOTES:
GHI CHÚ:
1: ALL DIMENSIONS ON DRAWING ARE MM
1: TẤT CẢ KÍCH THƯỚC TRONG BẢN VẼ LÀ MM
2: REFER TO DRAWING HCMC-BRT1-DFD-V02A-FB01-034 FOR DETAIL HANDRAIL
2: THAM CHIẾU BẢN VẼ HCMC-BRT1-DFD-V02A-FB01-034 CHI TIẾT LAN CAN
DETAIL 1
CHI TIẾT 1
95 1900 50 1240 50 1200 50 1200 50 1200 50 1470 50 1240 50 1200 50 1200 50 1200 50 1470 50 795
95 1900 50 1240 50 1200 50 1200 50 1200 50 1470 50 1240 50 1200 50 1200 50 1200 50 1470 50 795
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
ARRANGEMENT OF NEW STAIR HANDRAIL
district 1, 2, 4, 5, 6, 8 CHECKED BY
BỐ TRÍ CHUNG LAN CAN CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-033 _ 01 THIÕT KÕ 03/2020
1 TYPICAL DETAILS OF NEW STAIR HANDRAIL
CHI TIẾT MÁI LAN CAN CẦU THANG XÂY MỚI
BOX STEEL 50X50X2.3 50 L 50
001 50 100 50 L-400 50 100 50
THÉP HỘP 50X50X2.3
50 100 50
50 100 50
BOX STEEL 50X50X2.3
THÉP HỘP 50X50X2.3
STEEL GRID
LƯỚI THÉP SUMMARY QUANTITY OF HANDRAIL
TỔNG HỢP KHỐI LƯỢNG LAN CAN
1095
SỐ HIỆU HÌNH DẠNG CHIỀU DÀI ĐƠN VỊ
745
745
BOX STEEL 50X50X2.3
1200
1200
002
THÉP HỘP 50X50X2.3 001 BOX 50x50x2.3 344.17 kg
100 50
100 50
BOLTS D14 104 item
105
105
DETAIL 2
NOTES:
GHI CHÚ:
ALL DIMENSIONS ON DRAWING ARE MM
TẤT CẢ KÍCH THƯỚC TRONG BẢN VẼ LÀ MM
190
176
90 10 90
14 13
BOLT D14 18 15 31 50 31 15 18
38 15 38 38 15 38 BU LÔNG D14
31
BOLT D14
BU LÔNG D14 BOX STEEL 50X50X2.3
THÉP HỘP 50X50X2.3
FULL PENETRATION
FULL PENETRATION WELDING CONNECTION
166
50
2 WELDING CONNECTION 2 ĐƯỜNG HÀN XUYÊN
ĐƯỜNG HÀN XUYÊN
12
12
31
13 14
38 14 38 38 14 38
3 90 10 90
190
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
TYPICAL DETAILS OF NEW STAIR HANDRAIL
district 1, 2, 4, 5, 6, 8 CHECKED BY
CHI TIẾT MÁI LAN CAN CẦU THANG XÂY MỚI LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-034 _ 01 THIÕT KÕ 03/2020
INSTRUCTION FOR PAITING AREA
CHỈ DẪN CHO SƠN
AREA PAINT FOR STAIRCASE AREA PAINT FOR COLUMN & PIER
DIỆN TÍCH SƠN CHO CẦU THANG DIỆN TÍCH SƠN CHO CỘT VÀ TRỤ
PAINTING SURFACE
BỀ MẶT SƠN
PAINTING SURFACE
BỀ MẶT SƠN
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
INSTRUCTION FOR PAINTING AREA
district 1, 2, 4, 5, 6, 8 CHECKED BY
CHỈ DẪN CHO SƠN LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-039 _ 01 THIÕT KÕ 03/2020
LOẠI A ( THI CÔNG TRỤ TRÊN CẠN VÀ DÙNG VÒNG VÂY CỌC VÁN THÉP)
TYPE A ( PIER ON THE GROUND AND USE STEEL SHEET PILE) CRANE 25T
CẦN CẨU 25T
CONCRETING BACKET
STEP 1: PREPARATORY WORKS BULLDOZER STEP 4: CONSTRUCTION OF PILE CAP
GẦU ĐỔ BT WATER PUMP
- LOCATING THE CENTER OF PIER. MÁY ỦI 1. PUMP WATER FROM FOUNDATION HOLE.
MÁY BƠM NƯỚC
- LEVELING THE CONSTRUCTON SITE OF PIER 2. BREAKING CONCRETE AT TOP OF PILES, CLEAN THE HOLE
- SUPPLY MATERIALS AND MACHINES TO THE CONSTRUCTION SITE. 3. INSTALLING FORMWORK, REINFORCEMENT AND POURING
CONCRETE OF PILE CAP.
BƯỚC 1: CÔNG TÁC CHUẨN BỊ
- ĐỊNH VỊ TIM TRỤ.
BƯỚC 4: THI CÔNG BỆ TRỤ
- SAN ỦI MẶT BẰNG THI CÔNG TRỤ
CDTC 1. HÚT NƯỚC HỐ MÓNG.
- TẬP KẾT VẬT TƯ THIẾT BỊ TỚI CÔNG TRƯỜNG. 2. ĐẬP ĐẦU CỌC, VỆ SINH HỐ MÓNG
3. LẮP DỰNG CỐT THÉP, VÁN KHUÔN VÀ ĐỔ BT BỆ TRỤ
500
CONCRETING BACKET
GẦU ĐỔ BT
STELL PLATE 6000X1500X20
Lov
THÉP ĐỆM 6000X1500X20
CASING PIPE RAILING
ỐNG VÁCH LAN CAN
STEP 3: DRIVING STEEL SHEET PILE, EXCAVATING FOUNDATION FLOOR
1. DRIVING STEEL SHEET PILE BY VIBRATIVE HAMMER. VÁN LÁT SÀN
2. INSTALLING BRACES. AGITATOR TRUCK
3. EXCAVATING FONDATION HOLE UNTIL THE DESIGN LEVEL . XE CHỞ BT
4. PUMP WATER, POUR LEAN CONCRETE LAYER. ELE2 STEEL STAIRS
THANG THÉP
BƯỚC 3: ĐÓNG CỌC VÁN THÉP, ĐÀO HỐ MÓNG.
TIP OF PIPE WATER PUMP
1. ĐÓNG CỌC VÁN THÉP XUNG QUANH HỐ MÓNG BẰNG BÚA RUNG.
MŨI CỌC BƠM NƯỚC
2. LẮP DỰNG KHUNG CHỐNG.
3. ĐÀO ĐẤT HỐ MÓNG ĐẾN CAO ĐỘ THIẾT KẾ.
B=Bb+2600
4. BƠM HÚT NƯỚC, ĐỔ BÊ TÔNG LÓT MÓNG.
1000 300
WATER PUMP
MÁY BƠM NƯỚC
CDVT
A=Ab+2600
0
Ab
80
D
ELE4 STEEL SHEET PILE
300 1000
Lvt
CỪ VÁN THÉP
ELE1
Dlot Lc
NOTES:
150
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
CONSTRUCTION METHOD
district 1, 2, 4, 5, 6, 8 CHECKED BY
BIỆN PHÁP THI CÔNG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA
(1/2) A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-042 _ 01 THIÕT KÕ 03/2020
CONSTRUCTION METHOD
B ỆN PH P TH C NG
500
1300 800 1300
I- S L CA AT N KHỐ L NG Đ T HỐ MÓNG
1 A M m2 25.92
2 S Đ m3 54.17
3 B Đ m3 49.19
ELEVATION 4 S C B m3 1.80
MẶT ĐỨNG
SCALE: 1/100 II- SH T P P LASS N 1S T R N TM NG CỌC N TH P LASS N 1B NG 1 LẦN
T LỆ 1 1
1 S L ,L C 43.834
B=Bb+2600 2 Đ C m 558.00
4 S H C 18.00
3 I300x145
III- C NSTRUCT NPL TH C NG CỌC KH AN NH
1000 300
1 T C m 88.29
2 Bentonite m3 44.38
A=Ab+2600
m 18.00
0
3 P Ố
Ab
80
3.00
D
4 L H 18.00
I300x145
300 1000
2
5 BR AK NG C NCR T AT T P PL Đ P B T NG ĐẦU CỌC M 3.15
I300x145
1
PLAN VIEW
MẶT BẰNG
SCALE: 1/100
T LỆ 1 1
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION RA NG NAM T NB N team leader TIM MARTIN SCAL T LỆ
ĐAĐ M
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
CONSTRUCTION METHOD
district 1, 2, 4, 5, 6, 8 CHECKED BY
B ỆN PH P TH C NG LE DANG KHOA RMAT KH
& Binh tan KIÓM TRA
(2/2) A3
GUIDING ROD
THANH DẪN HƯỚNG
SHOVLE
MÁY XÚC
PHÁ BỎ LAN CAN CẦU CHÍNH TẠI VỊ TRÍ TIẾP GIÁP CẦU THANG đ đ
HANDRAIL OF STAIR
LAN CAN CẦU THANG
ROOF OF STAIRCASE
MÁI CẦU THANG
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
CONSTRUCTION SEQUENCE
district 1, 2, 4, 5, 6, 8 CHECKED BY
TRÌNH TỰ THI CÔNG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-046 _ 01 THIÕT KÕ 03/2020
BILL OF QUANTITY
THỐNG KÊ SỐ LƯỢNG
SUMMARY QUANTITY OF FOOT BRIDGE KM 0+077 SUMMARY QUANTITY OF FOOT BRIDGE KM 0+077
BẢNG TỔNG HỢP KHỐI LƯỢNG CẦU ĐI BỘ KM 0+077 BẢNG TỔNG HỢP KHỐI LƯỢNG CẦU ĐI BỘ KM 0+077
NO. ITEMS UNIT QUANTITY NOTE NO. ITEMS UNIT QUANTITY NOTE
STT H NG M C Đ N VỊ KHỐI LƯỢNG GHI CH STT H NG M C Đ N VỊ KHỐI LƯỢNG GHI CH
I- CÔNG TÁC THÁO DỠ CHUẨN BỊ THI CÔNG IV- HANDRAIL OF STAIRCASE - LAN CAN CẦU THANG
Phá bỏ bê tông lan can vị trí xây dựng cầu thang mới 1 Box steel - Thép hộp (50x50x2.3)mm kg 685.07
Phá bỏ giàn thép trồng cây leo trên cầu 2 Grid steel - Lưới thép m2 15.92
Chuẩn bị mặt bằng và đảm bảo an toàn giao thông 3 Bolts M14 - Bu-lông M14 item 104
II- BORED PILE D800 - CỌC KHOAN NHỒI D800 m 84 4 Plate 166X90X12 mm - Tấm thép kê kg 73
1 Concrete of pile - Bê tông cọc m3 43.73 V- ROOF STRUCTURE - KẾT CẦU MÁI
2 Crushed - Bê tông đập đầu cọc m3 1.28 1 Kết cấu mái cầu chính
3 Reinforcement - Cốt thép kg 4528.49 Box steel - (125x125x4.5)mm kg 9562.34
10 ≤ D ≤ 18 kg 1052.77 Box steel - (70x50x2.3)mm kg 4610.63
D > 18 kg 3475.73 Tole roof - Mái tôn m2 501.90
4 Pipe steel - Ống thép Din= 107.3x3.5 mm m 84.15 Eares - Lam trang trí m 135.10
5 Pipe steel - Ống thép Din= 60.5x2.3 mm m 173.10 2 Concrete pedestal - Bệ bê tông liên kết mái
6 Concrete grout - Vữa bơm lấp lỗ thí nghiệm m3 1.26 Concrete - Bê tông m3 1.92
7 Bolt - Cóc nối thép (Bu lông M16, L=300 mm) cái 216.00 Reinforcement - Cốt thép (D<18) ton 701.42
III- NEW STAIRCASE - CẦU THANG XÂY MỚI Formwork - Ván khuôn m2 16.31
1 Pile cap of stair pier - Đài cọc cầu thang nos/cái 2 3 Roof of staircase - Mái cầu thang
a Concrete - Bê tông m3 1.61 Box steel - (125x125x4.5)mm kg 2579.08
b Reinforcement - Cốt thép kg 262.84 Box steel - (70x50x2.3)mm kg 262.97
10 ≤ D ≤ 18 kg 31.05 Steel cover sheet - Mái tôn m2 73.94
D > 18 kg 231.78 Steel pipe D200 - Thép ống D200 kg 54.10
c Formwork - Ván khuôn m2 6.59 Plate D210, t=5mm - Thép tấm kg 13.59
2 Pier of staircase - Trụ cầu thang nos/cái 2 Plate t=10mm - Thép tấm kg 23.28
a Concrete - Bê tông m3 2.06 Plate D345, t=15mm kg 110.08
b Reinforcement - Cốt thép kg 439.08 Bolts M22 - Bu-lông M22 item 40
10 ≤ D ≤ 18 kg 97.80 V- CONSTRUCTION METHODE
D > 18 kg 341.27 REFER TO DWG HCMC-BRT1-DFD-V02A-FB01-043
c Formwork - Ván khuôn m2 16.46 THAM CHIẾU BẢN VẼ HCMC-BRT1-DFD-V02A-FB01-043
3 Slab of staircase - Bản cầu thang
a Concrete - Bê tông m3 18.61
b Reinforcement - Cốt thép kg 2801.54
10 ≤ D ≤ 18 kg 2404.21
D > 18 kg 397.32
c Formwork - Ván khuôn m2 78.18
d Finishing layer - Lớp hoàn thiện m2 40.07
4 Painting m2 101.23
PROJECT NAME / Tªn dù ¸n PROJECT LOCATION DRAWING NAME / TÊN BẢN VẼ team leader TIM MARTIN SCALE / TỶ LỆ
ĐỊA ĐIỂM
FOOTBRIDGE FB01 - KM 0+077 trëng dù ¸n AS SHOWN
BILL OF QUANTITY
district 1, 2, 4, 5, 6, 8 CHECKED BY
THỐNG KÊ SỐ LƯỢNG LE DANG KHOA FORMAT / KHỔ
& Binh tan KIÓM TRA A3
Version: 01 DRAWING NUMBER / SỐ BẢN VẼ DESIGNED BY BUI THANH PHUOC DATE / NGÀY
phiªn b¶n: 01 HCMC-BRT1-FDD-VO2A-FB01-050 _ 01 THIÕT KÕ 03/2020