Checklist for Economiser / FFS
APIL-NCR-PPP-CHKL-006
Inlet Header Drawing
June 2008
Name : Name :
Format No. :
Checklist for Economiser / FFS
APIL-NCR-PPP-CHKL-006
Inlet Header Drawing
June 2008
20. Check and ensure that all the parts are identified
by mark nos. and included in the material list
along with the quantity and material specification.
21. Check the drawing no. is as per drawing list.
22. Check provision of lugs for hangers for top
supported boilers.
23. Check whether additional length has been
provided on all the nozzle as per the following
standard.
a. Cutting allowance : 15 mm for nozzle
up to 3”
: 20 mm for nozzle above
3”
b. Hydro. test allowance : 40 mm (Excluding
end pl. thk.)
The total length shall be rounded off to nearest 5
mm.
Also check header length is given considering 20
mm allowance on each cutting edge
24. Ensure that all details for the fabrication of header
are available in drawing.
25. Check whether bending radius is given for the
stubs which are having bends.
26. Check whether the pad material is of similar /
equivalent pipe material.
27. If thermowell is provided check whether the
thermowell bottom is extended upto the centerline
of header.
Checked by Approved by Date: Sh. 2 of 3
Signature : Signature :
Name : Name :
Format No. :
Checklist for Economiser / FFS
APIL-NCR-PPP-CHKL-006
Inlet Header Drawing
June 2008
Name : Name :