3.0 INSTALLATION
Alignment and plumbs
are maintained in
Prior to start
Visual Project Specification horizontal and vertical Inspection Request
3.1 Surface preparation installation of Floor I I W
Inspection Sec 09‐30‐10 Part3.0 IFC Drawing and Quality checklist
and Wall Tiles
approved shop
drawing
Alignment and plumbs
are maintained in
Prior to start
Installation of Floor and Wall Visual Project Specification horizontal and vertical Inspection Request
3.2 installation of tile I I W
Tiles Inspection Sec 09‐30‐10 Part3.0 IFC Drawing and Quality checklist
grout
approved shop
drawing
Page 1 of 2
Project Title: CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT
Contract No.: W912ER18C0015 Revision No.: 00
Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD. ITP No. : NICE-CIV-ITP-010
LEGENDS:
S– Surveillance W – Witness I – Inspection
R – Documents Review T – Test H – Mandatory Hold Point
Prepared By Sub Contractor Review By Contractor Client
Naba International Commercial Enterprises Ltd Al Ayuni Contracting
Date:22 April 2020 Date: