Project Title: CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT

Contract No.: W912ER18C0015 Revision No.: 00


Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD. ITP No. : NICE-CIV-ITP-010

INSPECTION AND TEST PLAN : TILE WORKS


INSPECTION
INSPECTION TEST REQUIREMENTS REFERENCE DOCUMENTS
SL VERIFYING RESPONSIBILTY
ACTIVITY PHASE Test or REMARKS
No. DOCUMENTS Sub US Corps
Inspection Stage / Frequency Spec/Standards/Codes Acceptance Criteria Cntrctr
Cntrctr
of Engr.
Performed

1.0 MATERIAL SUBMITTAL


Review Material &
Product Data Project Specification Project Specification Approved Material
1.1 Floor and Wall Tiles Test Certificates from I I/R R/W
& Sample Sec 09‐30‐10 Part1.2 Sec 09‐30‐10 Part2 Test Report
the manufacturer
Review Material &
Product Data Project Specification Project Specification Approved Material
1.2 Tile Grout and Adhesives Test Certificates from I R R
& Sample Sec 09‐30‐10 Part1.2 Sec 09‐30‐10 Part2 Test Report
the manufacturer

2.0 MATERIAL RECEIVING


 Product Data
Test Report Project Specification
2.1 Material Receiving Inspection On delivery  Test Report  MRIR I w R
Delivery Note Sec 09‐30‐10 Part1.4
 Delivery Note

3.0 INSTALLATION
 Alignment and plumbs
are maintained in
Prior to start
Visual Project Specification horizontal and vertical  Inspection Request
3.1 Surface preparation installation of Floor I I W
Inspection Sec 09‐30‐10 Part3.0  IFC Drawing and  Quality checklist
and Wall Tiles
approved shop
drawing
 Alignment and plumbs
are maintained in
Prior to start
Installation of Floor and Wall Visual Project Specification horizontal and vertical  Inspection Request
3.2 installation of tile I I W
Tiles Inspection Sec 09‐30‐10 Part3.0  IFC Drawing and  Quality checklist
grout
approved shop
drawing

Page 1 of 2
Project Title: CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT
Contract No.: W912ER18C0015 Revision No.: 00
Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD. ITP No. : NICE-CIV-ITP-010

INSPECTION AND TEST PLAN : TILE WORKS


INSPECTION
INSPECTION TEST REQUIREMENTS REFERENCE DOCUMENTS
SL VERIFYING RESPONSIBILTY
ACTIVITY PHASE Test or REMARKS
No. DOCUMENTS Sub US Corps
Inspection Stage / Frequency Spec/Standards/Codes Acceptance Criteria Cntrctr
Cntrctr
of Engr.
Performed

4.0 Cleaning and Protection


 Project Specification
Visual Project Specification Sec09‐30‐10 Part3.7  Inspection Request
4.1 Cleaning and Protection Prior to hand over I W S
Inspection Sec09‐30‐10 Part3.7  Manufacturer’s  Quality checklist
recommenndation

LEGENDS:
S– Surveillance W – Witness I – Inspection
R – Documents Review T – Test H – Mandatory Hold Point
Prepared By Sub Contractor Review By Contractor Client
Naba International Commercial Enterprises Ltd Al Ayuni Contracting
Date:22 April 2020 Date:

Page 2 of 2