Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CODE 1 : REJECTED
CODE 2 : REVIEWED WITH COMMENTS
By Sachilal Kunnoth at 3:40 pm, Apr 14, 2018 CODE 3 : NO COMMENTS
ISSUED FOR
6 11-Apr-18 K. H. Kim S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
5 01-Apr-18 K. H. Kim S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
4 14-Aug-16 B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
3 02 FEB 16 B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
2 02 FEB 16 B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
1 20 JAN 16 B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
ISSUED FOR
0 9 DEC 15 B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
CONSTRUCTION
A 2 OCT 15 ISSUED FOR REVIEW B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
Joint Venture of Hyundai Engineering & Construction Co., Ltd., GS Engineering & Construction Corp., SK Engineering &
Construction Co., Ltd., and Hyundai Engineering Co., Ltd.,
Note :
a) Revision bar(vertical line) shall be placed in the right hand margin to indicate where the changes has been made
b) PRPD = Prepared by, CHKD = Checked by, REVD = Reviewed by, APPRD = Approved by
INSPECTION AND TEST PLAN AT SITE
FOR FIELD FABRICATION TANK
REVISION HISTORY
TABLE OF CONTENTS
1. I T P
2. ATTACHMENTS
Form No. ITRF-MS-0002-09 ; Vacuum Box , Air leak & Penetrating Oil Test Record .
Form No. ITRF-MS-0002-12 ; Release Note for foundation of Field Fabrication Tank .
Form No. ITRF-MS-0002-15 ; Inspection Report of Pad Elevation & Anchor Bolt Projection.
INSPECTION AND TEST PLAN AT SITE FOR FIELD FABRICATION TANK
Section A. Definition of Inspection Points Section B. Applicable Specification, Codes and Standards
QC : CONTRACTOR's QC 2342-AA00-JSS-6300-05
EMPLOYER :STATE COMPANY FOR OIL PROJECTS (SCOP) Personnel and/or their Inspection Representative e.g. Third party Inspection Company IONE-AA00-PE-CO-0010
Inspection and testing activities conducted by Construction. These include the monitoring of installation and Construction's internal
I inspections and tests before and during the witnessing of the inspections and tests by QC and/or Company and/or EMPLOYER
IONE-AA00-PE-QA-0004
Subcontractor's Inspection Representative(s). IONE-AA00-PE-QA-0005
Also, these include the review of related certificates and preparation of the documentations and reports related to the activities.
At Hold Point, the Construction shall not carry out the specified inspector(s)/test(s) without the attendance of those parties
where "H" is indicated at "Inspected by" in ITP. IONE-AA00-WPS-0003
The Construction shall notify QC of inspections(s)/test(s) via submittal of "Request For Inspection" notification form. This IONE-AA00-WPS-0004
shall be submitted a minimum of 48 hours for site works, 72 hours for weekend prior to proposed date and time of
H inspection(s)/test(s) activity. QC shall verify readness for inspection prior to forwarding "Request For Inspection" notification form IONE-AA00-WPS-0005
Hold Points to EMPLOYER and/or EMPLOYER Inspection Representative(s). This shall be submitted a minumum of 24 hours for site works, API STD. 620-12th Ed., 2013
48 hours for weekend prior to proposed date and time of inspection(s)/test(s) activity.
API STD. 650-12th Ed., 2013
At Witness Point, the Construction shall notify QC of inspections(s)/test(s) via submittal of "Request For Inspection" notification form. ASME BPVC SEC. V, 2013 Ed.
This shall be submitted a minimum of 48 hours for site works, 72 hours for weekend prior to proposed date and time of inspection(s)/test(s)
W activity. CONTRACTOR shall verify readness for inspection prior to orwarding "Request For Inspection" notification form to EMPLOYER ASME BPVC SEC. VIII, 2013 Ed.
Witness Points and/or EMPLOYER Inspection Representative(s). This shall be submitted a minumum of 24 hours for site works, 48 hours for weekend prior ASME BPVC SEC. IX, 2013 Ed.
to proposed date and time of inspection(s)/test(s) activity. If QC and/or EMPLOYER/EMPLOYER/Representative(s) are not in attendance at
proposed inspection(s)/test(s) at date and time notified,
Construction may proceed after confirming whether these parties intend to witness inspection(s) or not.
(W) This is Spot Witness of test(s) or inspection(s) activity by QC and/or EMPLOYER and/or EMPLOYER Inspection Representative(s). The
Spot Witness is surveillance Inspection(s)/test(s). The Construction should notify QC and/or EMPLOYER and/or EMPLOYER Inspection
Representative(s) for surveillance inspections(s)/test(s) as Witness Point, however, the Construction can proceed within these
Spot witness points inspection(s)/test(s) activity with no requirement to confirming whether these pasrties intend to witness inspection(s) or not(But Confirm to
QC). Test reports will be made available for the Review at a later date.
This consists of informal inspection or observation during manufacture and testing. It may be undertaken whilst the inspector is attending
S fore Hold or Witness Points or during separately arranged surveillance on quality plans when visits are arranged solely for this purpose.
Surveillance points
The Construction shall submit to QC and/or EMPLOYER and/or EMPLOYER Inspection Representative(s) for Review the documents prior to
R and/or after the performance of the dedicated activity.
Review Points
INSPECTION AND TEST PLAN AT SITE FOR FIELD FABRICATION TANK
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Acceptance Criteria Form No. Remarks
[Code/std/Spec./Proc.] Const. JV QC TPI EMPLOYER
1 Material Receiving Inspection - IONE-AA00-PE-QA-0029 - Review of Material Test Report IONE-AA00-PE-QA-0004 W W N/A R/S
including Marking & Identification - Damage Check
1.1.a Release Notice for foundation from Civil Follow ITP for Concrete Work and Earth Work ITRF-MS-0002-12 H W N/A R
1.1.b Chipping, Pad elevation & Anchor Bolt check - Applicable Dwg. AISC 303, Section 7.5.1(C) & Section ITRF-MS-0002-15
For Projection , Dimension. (If applicable.) -Work Method Statement 7.6
Doc.No.IONE-AAOO-MS-MS-0014
5 NDT For All Joints - IONE-AA00-PE-QA-0029 - API Standards NDT Reports W/R W/R N/A W/R R (Film and Report)
6 Release of bottom area under shell plate prior - IONE-AA00-PE-QA-0029 - API Standards ITRF-MS-0002-10 R R/(W) N/A R
1st course installation:
7 Vacuum box of tank bottom plates - IONE-AA00-PE-QA-0029 - API Standards ITRF-MS-0002-09 H W N/A S
8 Leak test of shell-to-bottom fillet welds - IONE-AA00-PE-QA-0029 - API Standards & No leaks ITRF-MS-0002-09 H W N/A S
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Acceptance Criteria Form No. Remarks
[Code/std/Spec./Proc.] Const. JV QC TPI EMPLOYER
11 Hardness check(If required) - IONE-AA00-PE-QA-0029 - Max 200HB Hardness Check Report H W N/A S/R
12 Check of shell roundness, verticality, - Approved IFC Drawings - API Standards ITRF-MS-0002-03 H W N/A (W) / R
peaking, banding , Levelness (First shell - IONE-AA00-PE-QA-0029 ITRF-MS-0002-04
course & on completion ) ITRF-MS-0002-05
ITRF-MS-0002-06
13 Pneumatic testing of nozzles and manholes - IONE-AA00-PE-QA-0029 - No leaks ITRF-MS-0002-09 H W N/A S/R
Reinforcing pads weld - API 650 Par. 7.3.4
15 Walk Down & Punch clear - Pressure Test Package - Test Package Preparation ITRF-MS-0002-11 H W N/A W
- IONE-AA00-PE-QA-0029 - Package Boundary & Vent/Drain
check
INSPECTION AND TEST PLAN AT SITE FOR FIELD FABRICATION TANK
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Acceptance Criteria Form No. Remarks
[Code/std/Spec./Proc.] Const. JV QC TPI EMPLOYER
16 Water Filling test of tank : - Pressure Test Package - Test pack clearance ITRF-MS-0002-07 H H N/A W
- Start water filling - IONE-AA00-PE-QA-0029 - Visual Verification (No Leak)
- Check for leakages of shell - Seal MFG recommendation. - Pressure Gauge Calibration
- Check of correct positioning of roof sealing - API Standard . Certificate
mechanism (if present) - Seal MFG recommendation.
- Check guide system mechanism (if present) - API Standard .
- Check rolling ladder correct installation
- Complete water filling
- Flotation Test
18 Internal coating or lining release - Approved IFC Drawings - IONE-AA00-PE-CO-0005 Same Form as per Painting ITP. H W N/A (W)/R W-for Final
Internal coating with lining: - IONE-AA00-PE-CO-0005 - Lining MFG recommendation. Coating / Lining
1.Verification of surface preparation - Lining MFG recommendation.
2. Measurement of dry film thickness
(Intermediate Coat)
3.Weather condition.
4.Choloride Test.
5. Final Coating Inspection
6. Holiday test
Final documentation .
INSPECTION AND TEST PLAN AT SITE FOR FIELD FABRICATION TANK
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Acceptance Criteria Form No. Remarks
[Code/std/Spec./Proc.] Const. JV QC TPI EMPLOYER
20 Final Box up and manhole closure - Approved IFC Drawings - Project Specification ITRF-MS-0002-08 H H H W
- Accessories installation; - IONE-AA00-PE-QA-0029
- internal cleaning - API Standard .
- Manhole closure;
- Gasket check
□ We would like to have your presence for inspection / test according to the following schedule. The under noted work is completed
(Except as noted)
□ This is to inform you that the following inspection / test will be carried out at the schedule time mentioned below :
Attachments : □ Yes, □ No
Remarks
Name
Position
Signature
Date / / / / / /
Original document : Attachment #1C of IONE-AA00-PE-QA-0005
Attachment #2.1-1 REQUEST FOR RECEIVING INSPECTION
Discipline PO No.
Request Date
□ We would like to have your presence for inspection / test according to the following schedule. The under noted work is completed
(Except as noted)
□ This is to inform you that the following inspection / test will be carried out at the schedule time mentioned below :
ITEM DESCRIPTION
Attachments : □ Yes, □ No
Remarks
Name
Position
Signature
Date / / / / / /
Original document : Attachment #2 of IONE-AA00-PE-QA-0004
Attachment #2.2: Receiving Inspection Report
Check Result
No. Inspection Items Remarks
Accept Reject N/A
Conformity/nonconformity between purchase
1
requirements and quality record received
2 Identification and mark of items / materials
□ : Accepted
□ : Rejected
Attachments □ : Yes
□ : No
Notes :
Name
Position
Signature
Date / / / / / /
Original document : Attachment #2 of IONE-AA00-PE-QA-0004
Attachment #2.3: Certificate
Welding Process
Type of Process (Manual/Auto.)
Backing
Base Material
Thickness (Groove/Fillet)
Diameter (Groove/Fillet)
Filler Metal Spec. No
Class
F-No.
Welding Position
Weld Progression(Up/Down)
Type of Gas
Electrical Characteristics
NDT Reports Current
Polarity
Position
Signature
Date
Form No. : ITRF-MS-0002-01
Attachment #2.4B:Nozzle and Manhole Fitup Inspection.
Remarks:
Material Specification Projection Inclination
Nozzle Elevation
ITEM
No.
Size Orientation Fit-Up
(A)
Flange Neck (NZ) (MH) (NZ) (MH)
Position
Signature
Date
MEASUREMENTS DATA
PEAKING (VERTICAL WELD SEAM) BANDING (HORIZONTAL WELD SEAM)
SN JOINT NUMBER REMARKS
A B C A B C
Result Result
(+) (-) (+) (-) (+) (-) (+) (-) (+) (-) (+) (-)
Project : Report No :
Job No : Inspection Date :
Area / Location : Item :
Tank No. : Ref. Dwg No :
45
90
135
180
225
270
315
NOTE:
SHELL PLATE
Measuring Value
300 mm
Name
Position
Signature
Date
Form No. : ITRF-MS-0002-04
Attachment #Attach 2.4E:PLUMBNESS INSPECTION REPORT.
Project : Report No :
Job No : Inspection Date :
Area / Location : Item
Tank No. : Ref. Dwg No :
MARKING VALUE
COORDINATES DIFFERENCE RESULT REMARKS
A B
0°
45°
90°
135°
180°
225°
270°
315°
0o
315o 45o
SHELL PLATE B BOTTOM Check Point
PLUMB BOB
270o 90o
225o 135o
180o
BOTTOM PLATE
Name
Position
Signature
Date
Form No. : ITRF-MS-0002-05
Attachment #Attach 2.4F:LEVELNESS INSPECTION REPORT.
Project : Report No :
Job No : Inspection Date :
Area / Location : Item :
Tank No. : Ref. Dwg No :
0°
45°
90°
135°
180°
225°
270°
315°
0
SKETCH : SCALE
Marking
for
measurement
SHELL PLATE
BOTTOM PLATE
Name
Position
Signature
Date
Form No. : ITRF-MS-0002-06
Attachment #2.4G: WATER FILLING AND SETTLEMENT INSPECTION REPORT
Project : Discipline
Location Item
Drawing No Date
Code /
Report No
Specification
Test Requirement
Test Pressure : Holding Time : Hr
Pressure Gauge No. :
No. Water Level Water Filling Time Holding Time Result Remarks
1 1/4H (25%)
2 1/2H (50%)
3 3/4H (75%)
4 Full (100%)
Settlement Check
Check Stage Check point
Cordinates
Before filling
25%
50%
75%
100%
After Remove
Total Settlement
Result
Comments
Name
Position
Signature
Date
Project : Discipline
Location Item
Drawing No Date
Code /
Report No
Specification
Result
Item to be Check Accept Reject Remark
1 Nozzles are Correctly Located
2 Internal Distributions / Collectors are Correctly Installed
Name
Position
Signature
Date
Report No Discipline
Location Date
Drawing No Item
Code / Specification:
(1) LT: Leak Test ; VB: Vacuum box Test ; OT: Penetrating Oil Test.
Remark :
NAME
POSITION
SIGNATURE
DATE
Form No. : ITRF-MS-0002-09
Attachment #2.4J: NDT SUMMARY SHEET
Report No Discipline
Location Date
Drawing No Tank No
RT
Joint Welder Leak Test
Dia THK Material WPS Visual PT/MT UT PWHT Hardness Note
No No. ( VB / LT / OT)
ACC. RT1 RT 2
Note :
NAME
POSITION
SIGNATURE
DATE
PUNCH LIST
Project Name /No.: Karbala Refinery Project Equipment NO.:
Area: Date:
System No.
Categary Issue by/ Cleared By
No. Tag/Item Description W/d Date Due / Date
(A/B/C) Date /Date
NAME
POSITION
SIGNATURE
DATE
Form No. : ITRF-MS-0002-11
Attachment #2.4L: Release Note for foundation of Field Fabrication Tank
Location Date
With reference to the tank as follow, all inspection and test activities for foundation are
In addition, we inform that all reports related to the inspections are maintained by Civil QC,
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-MS-0002-12
Attachment #2.4M: NON DESTRUCTIVE EXAMINATION RECORD
Position
Signature
Date
Form No. : ITRF-MS-0002-13
Attachment #Attach 2.4N:INTERNAL BOTTOM ELEVATION INSPECTION REPORT
Project : Report No :
Job No : Inspection Date :
Area / Location : Item :
Tank No. : Ref. Dwg No :
Name
Position
Signature
Date
Form No. : ITRF-MS-0002-14
Attachment #2.4O: Inspection report of Pad Elevation & Anchor bolt projection
Page : of
INSPECTION REPORT OF PAD ELEVATION &
ANCHOR BOLT PROJECTION
Date :
Location : Item :
(B)
Projection
EL (A)
FOUNDATION
Signature
Date
Form No. : ITRF-MS-0002-15