Audit Date:08.11.2019 Process :Stores & Waste Management CONCLUSION

45
0
0
0
Auditor:Mrs.Aparna Auditee:Mr.Pradeep
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ EHS Policy Displayed at MP & L area

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Roles,responsibility and authority forLogistics
5.3 2
personnels to achive effective implementation
5.3
documented?
√ evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for MP & L
6.1.2 3
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ and Scrap yard

Do risk assessment procedures cover routine-non routine activities;


6.1.2 4 6,1,2
personnel having access to the workplace (visitors, subcontractors)?
√ Coverd routine & non routuine process

developed an appropriate plan to address the significant aspects, Aspects - Classified as signinicant and HIRA
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and classified as High,Medium and low risks ;
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ Significant aspects -Packing waste generation ;
requirements? High Risk - Working at height

Does the methodology provide input into the determination of the


6 6,1,2 facility requirements, identification of training needs and √ Training defined as one of the control measure
development of operational controls?

Do risk assessment results demonstrate that all the activities and


7 6,1,2
facilities were covered and risks were evaluated?
√ Complaince

8 6,1,2 Does the process link to operational control procedures? √ Complaince

Are results of hazard identification and risk assessments considered


6.1.2 9 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ EHS objectives linked with CEA and HIRA table

determined, and have access to, compliance obligations related to its


6.1.3 10
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ Complaince - Disposal of Hazardous waste

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 11
organisation?
6.1.3
requirements kept up-to-date?
√ Compliance

Page 1 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Stores & Waste Management CONCLUSION

45
0
0
0
Auditor:Mrs.Aparna Auditee:Mr.Pradeep
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process defined enviromental objectives based on Are documented health and safety objectives established for each EHS Objectives defined for year 2019 ;LTC- 0
6.2 12
significant enviromental impacts?
6.2
relevant function?
√ ;Waste Volarisation - 76%

EHS Management programes are evidenced Eg:


Does the process defined a plan to achieve EMS objectives (What is 1)Packing materials reduction;
Are H&S objectives established and they consistent with the
6.2 13 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ 2) Logistics Optimisation ;
system ) - Managemnt Programes 3)Zero recordable case due to slips /Falls MP
& L area

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 14
documented?
6.2
established?
√ EHS Operational master plan - 2019

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 15
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 16
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


17 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 18 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ Servo System for 1800 T IM

Are employees are aware of the importance of the requirements of


7.2 19 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Skill matrix and training records evidenced

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 20 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Display boards /waning signs provided
and the implications of not conforming with these requirements? consequences of departing from procedures?

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 21
towards EMS
7.4
towards OHSAS
√ Suppleir cimmunication through E-mails

Page 2 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Stores & Waste Management CONCLUSION

45
0
0
0
Auditor:Mrs.Aparna Auditee:Mr.Pradeep
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 22 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ complaince
substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 23
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √ Compliance

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as Energy consumption & water consumption
8.1 24
defined in significant aspects report
8.1
defined in risk report
√ reports

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 25
deviations from the policy and the objectives?
8.1
deviations from the policy and the objectives?
√ SOP for Injection moulding

Wastesa are stored separtely and identified


8.1 26 Are waste are collected effectively and identified Are waste are collected effectively and identified √ properly

8.1 27 Oil /water leakages observed Slippery fllor /wet floor condition √ Compliance

8.1 28 All employees wearing required PPE All employees wearing required PPE √ Compliance

29 System to prevent from slips/fall √ Compliance

8.1 30 General cleaniness of shop floor General cleaniness of shop floor √ Compliance

31 Ergonomic risks & mitigations √ compliance

Is adequate Secondary containment system available for all liquid Secondary containment system available scrap
8.1 32
storages
√ yard area

8.1 33 Are waste are disposed as per complaince requirements √ Compliance

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 34 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ On-Site emergency plan avilable
and documented? accidents that can have an impact(s) and how it will respond to them?

Page 3 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Stores & Waste Management CONCLUSION

45
0
0
0
Auditor:Mrs.Aparna Auditee:Mr.Pradeep
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

35 8.2 Does all walks are clearly maked √ Compliance

36 8.2 Does adequate fire fighting equipments avilable √ Compliance

37 Does all emergency evacation doors are marked and freely accessibl;e √ Compliance

38 Does safe assembly point are clearly amrked and easily acessible √ Compliance

39 8.2 Does the ERT member identified properly √ Compliance

Has the process established and implemented a procedure to


Does the process defined what needs to be measured, the frequency
9.1 40
of measurement and the evaluation of results towards EMS?
9.1.1 regularly monitor and measure the key characteristics of its √ Waste Disosal data
operations that have a significant risk?

Does the procedure include documenting information to monitor


41 9.1.1 performance, applicable operational controls and conformity with the √ Waste Disosal data
health and safety objectives and targets?

Does the process ensure that calibrated or verified monitoring and


42 9.1.1
measurement equipment is used and maintained?
√ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 43
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 44 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

10.2 45 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

Page 4 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Canteen & OHC CONCLUSION

23
0
0
0
Auditor:Mr.Pradeep Auditee:Mr.Ramakrishnan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ Policy displayed at various locations

5.2 2 Is the policy made available to all interested parties? 5.2 Is the policy made available to all interested parties? √ Policy sent to all suppliers Via E-mail

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Responsibility & authority for Production
5.3 3
personnels to achive effective implementation
5.3
documented?
√ engineer evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for
6.1.2 4
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ Maintenance

Aspects - Classified as signinicant and HIRA


developed an appropriate plan to address the significant aspects,
classified as High,Medium and low risks ;
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ Significant aspects -Food waste from
canteen;Bio-medical waste from OHC ; High Risk
requirements?
- Slipper floor in canteen, food quality etc

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 6
towards EMS
7.4
towards OHSAS
√ Internal E-mail are evidenced towards EHS

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 7 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ Compliance
substitution, isolation, Engineering.admin control

8.1 8 Are waste are collected effectively and identified 8.1 Are waste are collected effectively and identified √ Dust bins provided at various locations

8.1 9 water leakages observed 8.1 Slippery fllor /wet floor condition √ Daily cleaning checklist evidenced

8.1 10 All employees wearing required PPE 8.1 All employees wearing required PPE √ Compliance

11 8.1 System to prevent from slips/fall √ Compliance

8.1 12 General cleaniness of shop floor 8.1 General cleaniness of shop floor √ Compliance

13 8.1 Ergonomic risks & mitigations √ Compliance

Page 5 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Canteen & OHC CONCLUSION

23
0
0
0
Auditor:Mr.Pradeep Auditee:Mr.Ramakrishnan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 14 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ Compliance
and documented? accidents that can have an impact(s) and how it will respond to them?

15 8.2 Does all walks are clearly maked √ Compliance

16 8.2 Does adequate fire fighting equipments avilable √ Compliance

17 8.2 Does all emergency evacation doors are marked and freely accessibl;e √ Compliance

18 8.2 Does safe assembly point are clearly amrked and easily acessible √ Compliance

19 8.2 Does the ERT member identified properly √ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 20
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 21 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

22 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 23 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Compliance
environmental performance? environmental performance?

Page 6 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Training / Office /Admin CONCLUSION

32
0
0
0
Auditor:Mr.Nithyanantham Auditee:Mrs.Aparana
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ Policy displayed at various locations

5.2 2 Is the policy made available to all interested parties? 5.2 Is the policy made available to all interested parties? √ Policy sent to all suppliers Via E-mail

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Responsibility & authority for Production
5.3 3
personnels to achive effective implementation
5.3
documented?
√ engineer evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for
6.1.2 4
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ Maintenance

Aspects - Classified as signinicant and HIRA


developed an appropriate plan to address the significant aspects,
classified as High,Medium and low risks ;
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ Significant aspects -Food waste from
canteen;Energy consumption for admin, ;
requirements?
High Risk - Electric shock,Erogonomics etc

Are results of hazard identification and risk assessments considered


6.1.2 6 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ Timer for street lights

Does the process defined enviromental objectives based on Are documented health and safety objectives established for each
6.2 7
significant enviromental impacts?
6.2
relevant function?
√ Printing Paper reduction

Has the process identified the competency requirements for effective Are competence requirements are defined - Gap identified and
7.2 8
implementation of EMS
7.2
fuillfilled ( Training needs, plan, achievement and effectiveness)
√ EHS competence mapping

Are employees are aware of the importance of the requirements of


7.2 9 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Regular training conducted

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 10 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Regular training conducted
and the implications of not conforming with these requirements? consequences of departing from procedures?

Do training procedures take into account differing levels of Do training procedures take into account differing levels of
7.2 11
responsibility, ability, literacy and risk?
7.2
responsibility, ability, literacy and risk?
√ EHS Skill matrix evidenced for all employees

Are training needs are identified and trainings are provided to satisfy Are training needs are identified and trainings are provided to satisfy
7.2 12
competence needs?
7.2
competence needs?
√ EHS Skill matrix evidenced for all employees

16/4/2019 - Thermography training ; 20/8/2019 -


7.2 13 Are training records are maintained? 7.2 Are training records are maintained? √ ERT training

Page 7 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Training / Office /Admin CONCLUSION

32
0
0
0
Auditor:Mr.Nithyanantham Auditee:Mrs.Aparana
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 14
towards EMS
7.4
towards OHSAS
√ Internal E-mail are evidenced towards EHS

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 15 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ Compliance
substitution, isolation, Engineering.admin control

8.1 16 Are waste are collected effectively and identified 8.1 Are waste are collected effectively and identified √ Dust bins provided at various locations

8.1 17 Oil /water leakages observed 8.1 Slippery fllor /wet floor condition √ Daily cleaning checklist evidenced

8.1 18 All employees wearing required PPE 8.1 All employees wearing required PPE √ Compliance

19 8.1 System to prevent from slips/fall √ Compliance

8.1 20 General cleaniness of shop floor 8.1 General cleaniness of shop floor √ Compliance

21 8.1 Ergonomic risks & mitigations √ Compliance

Is adequate Secondary containment system available for all liquid


8.1 22
storages
√ Compliance

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 23 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ Compliance
and documented? accidents that can have an impact(s) and how it will respond to them?

24 8.2 Does all walks are clearly maked √ Compliance

25 8.2 Does adequate fire fighting equipments avilable √ Compliance

26 8.2 Does all emergency evacation doors are marked and freely accessibl;e √ Compliance

Page 8 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Training / Office /Admin CONCLUSION

32
0
0
0
Auditor:Mr.Nithyanantham Auditee:Mrs.Aparana
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

27 8.2 Does safe assembly point are clearly amrked and easily acessible √ Compliance

28 8.2 Does the ERT member identified properly √ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 29
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 30 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

31 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 32 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Compliance
environmental performance? environmental performance?

Page 9 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Tool Maintenance CONCLUSION

38
0
0
0
Auditor:Mr.Vasantha Kumar Auditee:Mr.Devendran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ EHS Policy Displayed at mainteance area

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Roles,responsibility and authority for Mainteance
5.3 2
personnels to achive effective implementation
5.3
documented?
√ Engineer evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for Tool
6.1.2 3
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ Maintenance

Do risk assessment procedures cover routine-non routine activities;


6.1.2 4 6,1,2
personnel having access to the workplace (visitors, subcontractors)?
√ Coverd routine & non routuine process

developed an appropriate plan to address the significant aspects, Aspects - Classified as signinicant and HIRA
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and classified as High,Medium and low risks ;
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ Significant aspects -Oil leakage ; High Risk - Slips,
requirements? Manual tool handling

Does the methodology provide input into the determination of the


6 6,1,2 facility requirements, identification of training needs and √ Training defined as one of the control measure
development of operational controls?

Do risk assessment results demonstrate that all the activities and


7 6,1,2
facilities were covered and risks were evaluated?
√ Complaince

8 6,1,2 Does the process link to operational control procedures? √ Complaince

Are results of hazard identification and risk assessments considered


6.1.2 9 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ EHS objectives linked with CEA and HIRA table

determined, and have access to, compliance obligations related to its Complaince - Handling of used oil & oil soaked
6.1.3 10
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ waste

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 11
organisation?
6.1.3
requirements kept up-to-date?
√ Compliance

Page 10 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Tool Maintenance CONCLUSION

38
0
0
0
Auditor:Mr.Vasantha Kumar Auditee:Mr.Devendran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process defined enviromental objectives based on Are documented health and safety objectives established for each EHS Objectives defined for year 2019 ;Energy
6.2 12
significant enviromental impacts?
6.2
relevant function?
√ -2.04 per kg;

Does the process defined a plan to achieve EMS objectives (What is


Are H&S objectives established and they consistent with the
6.2 13 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ Runner reduction
system ) - Managemnt Programes

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 14
documented?
6.2
established?
√ EHS Operational master plan - 2019

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 15
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 16
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


17 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 18 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ Servo System for 1800 T IM

Are employees are aware of the importance of the requirements of


7.2 19 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Skill matrix and training records evidenced

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 20 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Display boards /waning signs provided
and the implications of not conforming with these requirements? consequences of departing from procedures?

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 21
towards EMS
7.4
towards OHSAS
√ Display boards /waning signs provided

Page 11 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Tool Maintenance CONCLUSION

38
0
0
0
Auditor:Mr.Vasantha Kumar Auditee:Mr.Devendran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 22 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ Compliance
substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 23
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √ Compliaince

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as
8.1 24
defined in significant aspects report
8.1
defined in risk report
√ Compliaince

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 25
deviations from the policy and the objectives?
8.1
deviations from the policy and the objectives?
√ Compliaince

8.1 26 Are waste are collected effectively and identified Are waste are collected effectively and identified √ Complaince

8.1 27 Oil /water leakages observed Slippery fllor /wet floor condition √ Complaince

8.1 28 All employees wearing required PPE All employees wearing required PPE √ Complaince

29 System to prevent from slips/fall √ Complaince

8.1 30 Ergonomic hazards elimination √ EOP provided for handling

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 31 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ On-Site emergency plan avilable
and documented? accidents that can have an impact(s) and how it will respond to them?

32 8.2 Does adequate fire fighting equipments avilable √ Compliance

Materials stored infront Emergency door exist


33 Does all emergency evacation doors are marked and freely accessibl;e √ near operator usage area.
Safe assembly point No 2 at noth direction was
34 Does safe assembly point are clearly amrked and easily acessible √ bloked with scrap trollys

35 8.2 Does the ERT member identified properly √ Complaince

Page 12 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Tool Maintenance CONCLUSION

38
0
0
0
Auditor:Mr.Vasantha Kumar Auditee:Mr.Devendran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 36
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 37 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

38 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

Page 13 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Plant Engineering CONCLUSION

45
0
0
0
Auditor:Mr.Alphones Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ EHS Policy Displayed at at shop floor

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Roles,responsibility and authority for Fire Guard
5.3 2
personnels to achive effective implementation
5.3
documented?
√ evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for DG/
6.1.2 3
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ Compressor/ETP

Do risk assessment procedures cover routine-non routine activities;


6.1.2 4 6,1,2
personnel having access to the workplace (visitors, subcontractors)?
√ Coverd routine & non routuine process

Aspects - Classified as signinicant and HIRA


developed an appropriate plan to address the significant aspects, classified as High,Medium and low risks ;
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and Significant aspects -Emission from DG;Energy
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ consumption,Sludge from ETP waste water from
requirements? paint booth ; High Risk - Electric shock,work at
heigh etc.

Does the methodology provide input into the determination of the


6 6,1,2 facility requirements, identification of training needs and √ Training defined as one of the control measure
development of operational controls?

Do risk assessment results demonstrate that all the activities and


7 6,1,2
facilities were covered and risks were evaluated?
√ Complaince

8 6,1,2 Does the process link to operational control procedures? √ Complaince

Are results of hazard identification and risk assessments considered


6.1.2 9 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ EHS objectives linked with CEA and HIRA table

determined, and have access to, compliance obligations related to its Complaince - Emission limits for DG, treated
6.1.3 10
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ water quality for ETP etc

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 11
organisation?
6.1.3
requirements kept up-to-date?
√ Compliance

Page 14 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Plant Engineering CONCLUSION

45
0
0
0
Auditor:Mr.Alphones Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

EHS Objectives defined for year 2019 ;LTC- 0 ;


Does the process defined enviromental objectives based on Are documented health and safety objectives established for each
6.2 12
significant enviromental impacts?
6.2
relevant function?
√ LTCR& RCR-0 Energy -2.04 per kg; Water- 4.4
Ltrs/Kg ;

EHS Management programes are evidenced Eg:


Does the process defined a plan to achieve EMS objectives (What is
Are H&S objectives established and they consistent with the 1)50 % recovery of spent solvent ;
6.2 13 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ 2)Zero recordable case due to slips /Falls in
system ) - Managemnt Programes
cooling tower

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 14
documented?
6.2
established?
√ EHS Operational master plan - 2019

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 15
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 16
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


17 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 18 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ Servo System for 1800 T IM

Are employees are aware of the importance of the requirements of


7.2 19 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Skill matrix and training records evidenced

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 20 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Display boards /waning signs provided
and the implications of not conforming with these requirements? consequences of departing from procedures?

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 21
towards EMS
7.4
towards OHSAS
√ Display boards /waning signs provided

Page 15 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Plant Engineering CONCLUSION

45
0
0
0
Auditor:Mr.Alphones Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 22 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ Complaince
substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 23
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √ Complaince

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as Energy consumption & water consumption
8.1 24
defined in significant aspects report
8.1
defined in risk report
√ reports

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 25
deviations from the policy and the objectives?
8.1
deviations from the policy and the objectives?
√ OCP for DG oepration

8.1 26 Are waste are collected effectively and identified Are waste are collected effectively and identified √ Complaince

8.1 27 Oil /water leakages observed Slippery fllor /wet floor condition √ Complaince

8.1 28 All employees wearing required PPE All employees wearing required PPE √ Complaince

29 System to prevent from slips/fall √ Complaince

8.1 30 General cleaniness of shop floor General cleaniness of shop floor √

31 Ergonomic risks & mitigations √ Working Flatforms provided for all height works

Is adequate Secondary containment system available for all liquid Secondary containment system evidenced for oil
8.1 32
storages
√ storage

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 33 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ On-Site emergency plan avilable
and documented? accidents that can have an impact(s) and how it will respond to them?

34 8.2 Does all walks are clearly maked √ Compliance

Page 16 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Plant Engineering CONCLUSION

45
0
0
0
Auditor:Mr.Alphones Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

35 8.2 Does adequate fire fighting equipments avilable √ Compliance

36 Does all emergency evacation doors are marked and freely accessibl;e √ Compliance

37 Does safe assembly point are clearly amrked and easily acessible √ Compliance

38 8.2 Does the ERT member identified properly √ Compliance

Has the process established and implemented a procedure to


Does the process defined what needs to be measured, the frequency
9.1 39
of measurement and the evaluation of results towards EMS?
9.1.1 regularly monitor and measure the key characteristics of its √ Daily Energy & water consumption reports
operations that have a significant risk?

Does the procedure include documenting information to monitor


40 9.1.1 performance, applicable operational controls and conformity with the √ Daily Energy & water consumption reports
health and safety objectives and targets?

Does the process ensure that calibrated or verified monitoring and


41 9.1.1
measurement equipment is used and maintained?
√ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 42
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 43 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

Are proposed corrective actions are reviewed through risk


44 10.2
assessment?
√ Compliance

45 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

Page 17 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Maintenance CONCLUSION

42
1
0
0
Auditor:Mr.Pradeep Auditee:Mr.Sathish Kumar
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ EHS Policy Displayed at mainteance area

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Roles,responsibility and authority for Mainteance
5.3 2
personnels to achive effective implementation
5.3
documented?
√ Engineer evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for
6.1.2 3
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ Maintenance

Do risk assessment procedures cover routine-non routine activities;


6.1.2 4 6,1,2
personnel having access to the workplace (visitors, subcontractors)?
√ Coverd routine & non routuine process

developed an appropriate plan to address the significant aspects, Aspects - Classified as signinicant and HIRA
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and classified as High,Medium and low risks ;
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ Significant aspects -Oil leakage ; High Risk -
requirements? Electric shock,Manual tool handling

Does the methodology provide input into the determination of the


6 6,1,2 facility requirements, identification of training needs and √ Training defined as one of the control measure
development of operational controls?

Do risk assessment results demonstrate that all the activities and


7 6,1,2
facilities were covered and risks were evaluated?
√ Complaince

8 6,1,2 Does the process link to operational control procedures? √ Complaince

Are results of hazard identification and risk assessments considered


6.1.2 9 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ EHS objectives linked with CEA and HIRA table

determined, and have access to, compliance obligations related to its Complaince - Handling of used oil & oil soaked
6.1.3 10
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ waste

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 11
organisation?
6.1.3
requirements kept up-to-date?
√ Compliance

Page 18 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Maintenance CONCLUSION

42
1
0
0
Auditor:Mr.Pradeep Auditee:Mr.Sathish Kumar
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process defined enviromental objectives based on Are documented health and safety objectives established for each EHS Objectives defined for year 2019 ;Energy
6.2 12
significant enviromental impacts?
6.2
relevant function?
√ -2.04 per kg;

Does the process defined a plan to achieve EMS objectives (What is EHS Management programes are evidenced Eg:
Are H&S objectives established and they consistent with the
6.2 13 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ 1) 15 % reduction in electricity in
system ) - Managemnt Programes 1800 T IM ;

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 14
documented?
6.2
established?
√ EHS Operational master plan - 2019

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 15
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 16
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


17 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 18 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ Servo System for 1800 T IM

Are employees are aware of the importance of the requirements of


7.2 19 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Skill matrix and training records evidenced

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 20 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Display boards /waning signs provided
and the implications of not conforming with these requirements? consequences of departing from procedures?

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 21
towards EMS
7.4
towards OHSAS
√ Display boards /waning signs provided

Page 19 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Maintenance CONCLUSION

42
1
0
0
Auditor:Mr.Pradeep Auditee:Mr.Sathish Kumar
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 22 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?

substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 23
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as
8.1 24
defined in significant aspects report
8.1
defined in risk report
√ Energy consumption & Oil consumption reports

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 25
deviations from the policy and the objectives?
8.1
deviations from the policy and the objectives?
√ SOP for Injection moulding

8.1 26 Are waste are collected effectively and identified Are waste are collected effectively and identified √ Complaince

8.1 27 Oil /water leakages observed Slippery fllor /wet floor condition √ Complaince

8.1 28 All employees wearing required PPE All employees wearing required PPE √ Complaince

29 System to prevent from slips/fall √ Complaince

Instead of push buttons palm buttons can be


8.1 30 Ergonomic hazards elimination √ replaced

Is adequate Secondary containment system available for all liquid Secondary containment system availabel for oil &
8.1 31
storages
√ grease storage area

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 32 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ On-Site emergency plan avilable
and documented? accidents that can have an impact(s) and how it will respond to them?

33 8.2 Does adequate fire fighting equipments avilable √ Compliance

Materials stored infront Emergency door exist


34 Does all emergency evacation doors are marked and freely accessibl;e √ near operator usage area.
Safe assembly point No 2 at noth direction was
35 Does safe assembly point are clearly amrked and easily acessible √ bloked with scrap trollys

Page 20 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Maintenance CONCLUSION

42
1
0
0
Auditor:Mr.Pradeep Auditee:Mr.Sathish Kumar
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

36 8.2 Does the ERT member identified properly √


Has the process established and implemented a procedure to
Does the process defined what needs to be measured, the frequency
9.1 37
of measurement and the evaluation of results towards EMS?
9.1.1 regularly monitor and measure the key characteristics of its √ Daily Energy & Oil consumption reports
operations that have a significant risk?

Does the process ensure that calibrated or verified monitoring and


38 9.1.1
measurement equipment is used and maintained?
√ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 39
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 40 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

Are proposed corrective actions are reviewed through risk


41 10.2
assessment?
√ Compliance

42 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 43 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Compliance
environmental performance? environmental performance?

Page 21 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Moulding/Paintshop & Assembly CONCLUSION

38
2
6
0
Auditor:Mr.Nithyanandhan/Mrs.Aparna Auditee:Mr.Ashok/Mr.Ragu/Mr.Selva
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 1
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ EHS Policy Displayed at shop floor

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Roles,responsibility and authority for Moulding
5.3 2
personnels to achive effective implementation
5.3
documented?
√ Engineer evidenced.

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of CEA Table & HIRA table evidenced for Moulding,
6.1.2 3
cycle perspective?
6,1,2
risks established and is the methodology defined?
√ HMI assembly & Q5 assembly

Do risk assessment procedures cover routine-non routine activities;


6.1.2 4 6,1,2
personnel having access to the workplace (visitors, subcontractors)?
√ Coverd routine & non routuine process

Aspects - Classified as signinicant and HIRA


developed an appropriate plan to address the significant aspects, classified as High,Medium and low risks ;
compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and Significant aspects -Emission fro paint
6.1.2 5
technological options and its financial, operational and business
6,1,2
identification of those that are to be eliminated or controlled?
√ booth;Energy consumption, paint waste, waste
requirements? water from paint booth ; High Risk - Electric
shock,Manual handling of trolly etc

Does the methodology provide input into the determination of the


6 6,1,2 facility requirements, identification of training needs and √ Training defined as one of the control measure
development of operational controls?

Do risk assessment results demonstrate that all the activities and


7 6,1,2
facilities were covered and risks were evaluated?
√ Complaince

8 6,1,2 Does the process link to operational control procedures? √ Complaince

Are results of hazard identification and risk assessments considered


6.1.2 9 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?
√ EHS objectives linked with CEA and HIRA table

Complaince - Waste water from paint booth,


determined, and have access to, compliance obligations related to its
6.1.3 10
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ Emission from paint booth , VOC emission in Glue
coating etc

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 11
organisation?
6.1.3
requirements kept up-to-date?
√ Compliance

Page 22 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Moulding/Paintshop & Assembly CONCLUSION

38
2
6
0
Auditor:Mr.Nithyanandhan/Mrs.Aparna Auditee:Mr.Ashok/Mr.Ragu/Mr.Selva
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

EHS Objectives defined for year 2019 ;LTC- 0 ;


Does the process defined enviromental objectives based on Are documented health and safety objectives established for each
6.2 12
significant enviromental impacts?
6.2
relevant function?
√ LTCR& RCR-0 Energy -2.04 per kg; Water- 4.4
Ltrs/Kg ;Waste - 76 % volisation

EHS Management programes are evidenced Eg:


1)50 % recovery of spent solvent ;
Does the process defined a plan to achieve EMS objectives (What is
Are H&S objectives established and they consistent with the 2) 15 % reduction in electricity in 1800 T IM ;
6.2 13 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ 3)10 % reduction in paint consumption per cycle
system ) - Managemnt Programes
4)Zero recordable case due to slips /Falls in
cooling tower

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 14
documented?
6.2
established?
√ EHS Operational master plan - 2019

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 15
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 16
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


17 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 18 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ Servo System for 1800 T IM

Are employees are aware of the importance of the requirements of


7.2 19 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?
√ Skill matrix and training records evidenced

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 20 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and √ Display boards /waning signs provided
and the implications of not conforming with these requirements? consequences of departing from procedures?

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 21
towards EMS
7.4
towards OHSAS
√ Display boards /waning signs provided

Page 23 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Moulding/Paintshop & Assembly CONCLUSION

38
2
6
0
Auditor:Mr.Nithyanandhan/Mrs.Aparna Auditee:Mr.Ashok/Mr.Ragu/Mr.Selva
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 22 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?

substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 23
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as Energy consumption & water consumption
8.1 24
defined in significant aspects report
8.1
defined in risk report
√ reports

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 25
deviations from the policy and the objectives?
8.1
deviations from the policy and the objectives?
√ SOP for Injection moulding

Plastic lumbs are not stored in identified bins in


8.1 26 Are waste are collected effectively and identified Are waste are collected effectively and identified √ 1800T & 550 T Injection moulding machine

Oil Leakage observed in 2700 T Injection


8.1 27 Oil /water leakages observed Slippery fllor /wet floor condition √ moulding machine

Cut resistance gloves not used by employee at


8.1 28 All employees wearing required PPE All employees wearing required PPE √ Mobils IP line while handling knife

29 System to prevent from slips/fall √ Working flatforms provided for all heigh works

8.1 30 General cleaniness of shop floor General cleaniness of shop floor √ Dust accumulated in Re-grinding machine panel

31 Ergonomic risks & mitigations √


Is adequate Secondary containment system available for all liquid Secondary containment system not available in
8.1 32
storages
√ paint storage area.

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a Fire protection system in
8.2 33 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ On-Site emergency plan avilable Q5 line cab be improved
and documented? accidents that can have an impact(s) and how it will respond to them? with sprinkler system

34 8.2 Does all walks are clearly maked √ Compliance

Page 24 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Moulding/Paintshop & Assembly CONCLUSION

38
2
6
0
Auditor:Mr.Nithyanandhan/Mrs.Aparna Auditee:Mr.Ashok/Mr.Ragu/Mr.Selva
Opportunities for
Audit Findings Evidences
Improvement
Clause Question
Clause No. Audit Question - OHSMS (ISO 45001:2018)

Compliance

Minor N/C

Major N/C
No. No. Provide reference to documented information to justify Provide suggestions for
Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

35 8.2 Does adequate fire fighting equipments avilable √ Compliance

Materials stored infront Emergency door exist


36 Does all emergency evacation doors are marked and freely accessibl;e √ near operator usage area.
Safe assembly point No 2 at noth direction was
37 Does safe assembly point are clearly amrked and easily acessible √ bloked with scrap trollys

38 8.2 Does the ERT member identified properly √


Has the process established and implemented a procedure to
Does the process defined what needs to be measured, the frequency
9.1 39
of measurement and the evaluation of results towards EMS?
9.1.1 regularly monitor and measure the key characteristics of its √ Daily Energy & water consumption reports
operations that have a significant risk?

Does the procedure include documenting information to monitor


40 9.1.1 performance, applicable operational controls and conformity with the √ Daily Energy & water consumption reports
health and safety objectives and targets?

Does the process ensure that calibrated or verified monitoring and


41 9.1.1
measurement equipment is used and maintained?
√ Compliance

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 42
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 43 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

Are proposed corrective actions are reviewed through risk


44 10.2
assessment?
√ Compliance

45 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 46 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Compliance
environmental performance? environmental performance?

Page 25 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:Emergency Prepardness,Safety audits,Incident
investigations,participations Process : CONCLUSION

29
0
0
0
Auditor:Mr.Ashok Kumar Auditee:Mr.Venkateswaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Process(es) for consultation and participation of workers at all


Safety committee meetings -Sept 2019 , Canteen
applicable levels and functions, and, where they exist, workers’
1 5.4
representatives, in the development, planning, implementation,
√ committee - April 2019 and trainings, Safety day
celebrations, Suggestion system etc.
performance evaluation and actions for

Safety committee meetings -Sept 2019 , Canteen


mechanisms, time, training and resources necessary for consultation
2 5.4
and participation
√ committee - April 2019 and trainings, Safety day
celebrations, Suggestion system etc.

provide timely access to clear, understandable and relevant


3 5.4
information about the OH&S
√ Suggestion system

provision of training at no cost to workers and the provision of


All training are provided at no cost and working
4 5.4 training during working hours, where possible, can remove significant √ hours only
barriers to worker participation.

have processes been established, implemented and maintained to


Does the Process respond to actual emergency situations and
8.2 5 prepare for and respond to potential emergency situations identified 8.2
accidents, and prevent or mitigate associated adverse risks?
√ On-Site Emergency planl; Rev dated 10/04/2019
and documented?

Does the Process periodically review and, where necessary, revise its
Reviewed once in year and last update in April
6 8.2 emergency preparedness and response procedures, in particular, after √ 2019
the occurrence of accidents or emergency situations?

Does the Process also periodically test such procedures where


7 8.2
practicable?
√ Mock drill report dated 20/08/2019

In developing its procedures, has the Process considered the nature


of on-site hazards, e.g., flammable liquids, storage tanks and
8 8.2
compressed gases, and measures to be taken in the event of spillages
√ Compliance
or accidental releases?

In developing its procedures, has the Process considered the most


9 8.2
likely type and scale of an emergency situation or accident?
√ Compliance

In developing its procedures, has the Process considered the most


10 8.2 appropriate method(s) for responding to an accident or emergency √ On-Site Emergency planl; Rev dated 10/04/2019
situation?

In developing its procedures, has the Process considered internal and


11 8.2
external communication plans?
√ On-Site Emergency planl; Rev dated 10/04/2019

In developing its procedures, has the Process considered the action(s)


12 8.2
required to minimize environmental damage?
√ On-Site Emergency planl; Rev dated 10/04/2019

Page 26 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:Emergency Prepardness,Safety audits,Incident
investigations,participations Process : CONCLUSION

29
0
0
0
Auditor:Mr.Ashok Kumar Auditee:Mr.Venkateswaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

In developing its procedures, has the Process considered the


13 8.2 mitigation and response action(s) to be taken for different types of √ On-Site Emergency planl; Rev dated 10/04/2019
accident or emergency situation?
In developing its procedures, has the Process considered the need for
14 8.2 a process for post-accident evaluation to establish and implement √ On-Site Emergency planl; Rev dated 10/04/2019
corrective and preventive actions?

In developing its procedures, has the Process considered the periodic


15 8.2
testing of emergency response procedure(s)?
√ On-Site Emergency planl; Rev dated 10/04/2019

In developing its procedures, has the Process considered the training


16 8.2
of emergency response personnel?
√ ERT training dated 20/08/2019

In developing its procedures, has the Process considered a list of key


17 8.2 personnel and aid agencies, including contact details (e.g. fire √ On-Site Emergency planl; Rev dated 10/04/2019
department, spillage clean-up services)?

In developing its procedures, has the Process considered evacuation


18 8.2
routes and assembly points?
√ Markeing done for all exist and walkways

In developing its procedures, has the Process considered the potential


19 8.2 for an emergency situation(s) or accident(s) at a nearby facility (e.g. √ On-Site Emergency planl; Rev dated 10/04/2019
plant, road, railway line)?

In developing its procedures, has the Process considered the


20 8.2
possibility of mutual assistance from neighbouring Processs?
√ On-Site Emergency planl; Rev dated 10/04/2019

9.2 21 9.2 Does EHS walks planned and scheduled as per procedure? √ Monthly scheduled

Does EHS walks conducted as per defined frequency by qualified


9.2 22 9.2
auditors & all findings are closed effectively with corrective action.
√ EHS walks dated Oct 10 , 2019

23 9.2 Does Safety audit conducted as per plan √ Monthly scheduled

Does EHS walks conducted as per defined frequency by qualified


24 9.2
auditors & all findings are closed effectively with corrective action.
√ EHS walks dated Oct 10 , 2019

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 25
control and correctly deal with the consequences?
10.2
documented?
√ Compliance

Page 27 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:Emergency Prepardness,Safety audits,Incident
investigations,participations Process : CONCLUSION

29
0
0
0
Auditor:Mr.Ashok Kumar Auditee:Mr.Venkateswaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 26 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ Compliance
impact?

Are proposed corrective and preventive actions are reviewed through


27 10.2
risk assessment?
√ Compliance

28 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 29 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Compliance
environmental performance? environmental performance?

Page 28 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:07.11.2019 Process :Compliance Obligations CONCLUSION

8
0
0
0
Auditor:Mr.Ahok Kumar Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does your SMRC determine which of intersted parties requirements Does your SMRC determine which of intersted parties requirements
are to be managed as compliance obligations in order to mitigate are to be managed as compliance obligations in order to mitigate EHS Legal bodies - Meeting the regulations and
4.2 1
adverse risk or exploit beneficial opportunities that can be integrated
4.2
adverse risk or exploit beneficial opportunities that can be integrated
√ ammendments
in the operational planning of the EMS? in the operational planning of the OHSMS?

Complaince Obligations register evidenced Eg:


determined, and have access to, compliance obligations related to its
6.1.3 2
environmental aspects?
6.1.3 Are requirements other than legal requirements identified? √ Air Consent - 1808212400966; Valid 31/03/2020
Factory Licence:KM9618/15 Valid Dec 2019

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 3
organisation?
6.1.3
requirements kept up-to-date?
√ Monthly reviewed and reported to corporate

accounted for these obligations when establishing, implementing, Is relevant information on legal and other requirements is Mothly meetings & Training evienced - Eg:
6.1.3 4
maintaining and continually improving its EMS?
6.1.3
communicated to employees and other interested parties?
√ Hazardous waste management- Aug 2019

Has the process established and implemented a procedure to


9.1.2 5 DOES THE PROCESS INCLUDE 9.1.2 periodically evaluate how well your Process complies with legal √ Monthly reviewed and reported to corporate
requirements?

Are there records of the results of your Process's legal compliance


9.1.2 6 Determination of frequency of evaluation of compliance 9.1.2
evaluations?
√ Monthly reviewed and reported to corporate

Has the process established and implemented a procedure to


9.1.2 7 Evaluation of compliance and undertaking of action if needed? 9.1.2 periodically evaluate how well your Process complies with non-legal √ Monthly reviewed and reported to corporate
(other) requirements?

Are there records of the results of your Process's non-legal (other)


9.1.2 8 Maintenance of knowledge and understanding of its status? 9.1.2
compliance evaluations?
√ Monthly reviewed and reported to corporate

Page 29 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Doc Control , IA & MRM CONCLUSION

28
0

0
0
Auditor:MrRagunanthan Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Has the Process determined defined and documented the scope of its
4.3 1 Does the scope of EMS defined clearly and documented 4.3
H&S management system?

Does the Organisation estabilished, implemented and maintained


4.4 2
EMS
4.3 Has the Process established, documented, implemented and
maintained and continually improved an H&S management system in

accordance with the requirements?

Is the health and safety policy documented and authorized by top


5.2 3 EMS Policy 5.2
management?
√ Corporate EHS Policy evidenced

appropriate – considering knowledge gained from Clause 4


Is the policy is appropriate to the nature and the scale of the Process’s
5.2 4 requirements, as well as the impacts of its activities, products and 5.2
health and safety risks?
√ Compliance
services?

strategic – providing a framework for setting environmental


5.2 5
objectives?
5.2 Does the policy include a commitment to continual improvement? √ Compliance

proactive – by including a commitment to the protection of the Does the policy include a commitment to comply with applicable
5.2 6
environment?
5.2
legislation and other requirements to which the Process subscribes?
√ Compliance

ensures fulfillment of your compliance obligations and to continually


5.2 7
improve your EMS?
5.2 Is the policy implemented? √ Compliance

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 8
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ Display boards available at various places

5.2 9 Is the policy made available to all interested parties? 5.2 Is the policy made available to all interested parties? √ Communicated to suppliers via E-mail

5.2 10 Is the policy periodically reviewed for suitability? 5.2 Is the policy periodically reviewed for suitability? √ Reviewed in each MRM

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Responsibility & Authority for Muolding Engineer
5.3 11
personnels to achive effective implementation
5.3
documented?
√ evidenced.

7.5 12 Does the process have clear document control procedures 4.4.5 Does the process have clear document control procedures √ Evidenced

Does the process have proper Document identification,revision Does the process have proper Document identification,revision
7.5 13
control,status,storage, retrival system in place
7.5
control,status,storage, retrival system in place
√ Evidenced

Are documents are periodically reviewed, revised as necessary and Are documents are periodically reviewed, revised as necessary and
7.5 14
approved by authorized personnel?
7.5
approved by authorized personnel?
√ Evidenced

Page 30 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Doc Control , IA & MRM CONCLUSION

28
0

0
0
Auditor:MrRagunanthan Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

7.5 15 Are current versions available at all relevant locations? 7.5 Are current versions available at all relevant locations? √ Evidenced

Are obsolete docs protected against unintended use; retained ones Are obsolete docs protected against unintended use; retained ones
7.5 16
identified?
7.5
identified?
√ Evidenced

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 17 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
√ Evidenced
substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 18
environmental aspects are addressed considering each life cycle stage
8.1 Do operational control requirements cover all activities and facilities? √ Evidenced

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as
8.1 19
defined in significant aspects report
8.1
defined in risk report

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 20 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential √ ERP available
and documented? accidents that can have an impact(s) and how it will respond to them?

Does the process ensure that calibrated or verified monitoring and


21 9.1.1
measurement equipment is used and maintained?

9.2 22 Does internal audit planned and scheduled as per procedure? 9.2 Does internal audit planned and scheduled as per procedure? √

Does internal audit conducted as per defined frequency by qualified Does internal audit conducted as per defined frequency by qualified
9.2 23
auditors & all findings are closed effectively with corrective action.
9.2
auditors & all findings are closed effectively with corrective action.
√ Yearly once - Nov 2019 schedule evidenced

Has top management reviewed the Process’s health and safety


Has a management review been conducted and recorded covering all
9.3 24
the requirements of the new ISO 14001:2015 standard?
9.3 management system at planned intervals, to ensure its continuing √ Nov 2019 audit schedule evidenced.
suitability, adequacy, and effectiveness?

Monthly MRM conducted and annual MRM as


when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 25
control and correctly deal with the consequences?
10.2
documented?
√ per EHS Agenda conducted - MRM for 2019
planned in Nov 2019

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 26 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ EHS wals reports & action plans
impact?

10.2 27 Are corrective actions are followed up for effective implementation? 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

Page 31 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:08.11.2019 Process :Doc Control , IA & MRM CONCLUSION

28
0

0
0
Auditor:MrRagunanthan Auditee:Mr.Venkateshwaran
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 28 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Monthly MRM EHS slides
environmental performance? environmental performance?

Page 32 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Top Management CONCLUSION

37
0

0
0
Auditor:Mr.Sundar rajan Auditee:Mr.Raghunathan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Has your SMRC determined external and internal issues relevant to its Has your SMRC determined external and internal issues relevant to its Identified idental & external issues ; Eg: External
4.1 1 purpose that could affect its ability to achieve the intended result(s) 4.1 purpose that could affect its ability to achieve the intended result(s) √ issues -Increse in price of resources; Mew
of its EMS? of its OHSMS? technology; Suppleir inability etc.

Does the process identified the interested parties that are relevant to Does the process identified the interested parties that are relevant to Intersted aprties identified - Customers, Business
4.2 2
the EMS?
4.2
the OHSMS?
√ suppliers,,Employees etc

Needs & Expeactation determined - Custoemr:


Does the organisation determine the requirements of these interested Does the organisation determine the requirements of these interested
4.2 3
parties that are relevant to the EMS,
4.2
parties that are relevant to the OHSMS,
√ Incresed life time of product, recyclability,
degreaes packing etc.

which may include regulatory requirements, local, regional or global which may include regulatory requirements, local, regional or global
4.2 4 environmental conditions that can affect, or be affected by, your 4.2 environmental conditions that can affect, or be affected by, your √
SMRC? SMRC?
EHS Legal bodies - Meeting the regulations and
Does your SMRC determine which of those requirements are to be Does your SMRC determine which of those requirements are to be ammendments
managed as compliance obligations in order to mitigate adverse risk managed as compliance obligations in order to mitigate adverse risk
4.2 5
or exploit beneficial opportunities that can be integrated in the
4.2
or exploit beneficial opportunities that can be integrated in the

operational planning of the EMS? operational planning of the OHSMS?

Has the Process determined defined and documented the scope of its
4.3 7 Does the scope of EMS defined clearly and documented 4.3
H&S management system?

Does the Organisation estabilished, implemented and maintained Has the Process established, documented, implemented and
4.4 8 4.3
EMS maintained and continually improved an H&S management system in
accordance with the requirements?

Has Top Management taken accountability for the effectiveness of Has Top Management taken accountability for the effectiveness of
5.1 6
the EMS?
5.1
the OHSMS?
√ Compliance

5.1 7 established the policy and objective in line with strategic direction? 5.1 established the policy and objective in line with strategic direction? √ Corporate EHS Policy evidenced

ensured the EMS processes have been aligned with the business ensured the OHSMS processes have been aligned with the business
5.1 8
objectives?
5.1
objectives?
√ Process Mapping evidenced

Resources are discussed in monthly MRM &


5.1 9 ensured allocation of adequate resources? 5.1 ensured allocation of adequate resources? √ provided. Eg: Thermal imaging camera

directed and supported persons who contribute to the effectiveness directed and supported persons who contribute to the effectiveness Regular monthly meetings conducted with
5.1 10
of the environmental management system?
5.1
of the OHSMS management system?
√ Mangement

supported relevant management roles to demonstrate their supported relevant management roles to demonstrate their
5.1 11
leadership as it applies to their areas of responsibility?
5.1
leadership as it applies to their areas of responsibility?
√ Compliance

Page 33 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Top Management CONCLUSION

37
0

0
0
Auditor:Mr.Sundar rajan Auditee:Mr.Raghunathan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Is the health and safety policy documented and authorized by top


5.2 12 EMS Policy 5.2
management?
√ Corporate EHS Policy evidenced

appropriate – considering knowledge gained from Clause 4


Is the policy is appropriate to the nature and the scale of the Process’s
5.2 13 requirements, as well as the impacts of its activities, products and 5.2
health and safety risks?
√ Compliance
services?

strategic – providing a framework for setting environmental


5.2 14
objectives?
5.2 Does the policy include a commitment to continual improvement? √ Compliance

proactive – by including a commitment to the protection of the Does the policy include a commitment to comply with applicable
5.2 15
environment?
5.2
legislation and other requirements to which the Process subscribes?
√ Compliance

ensures fulfillment of your compliance obligations and to continually


5.2 16
improve your EMS?
5.2 Is the policy implemented? √ Compliance

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 17
are aware of their EMS obligations?
5.2
are aware of their H&S obligations?
√ Display boards available at various places

5.2 18 Is the policy made available to all interested parties? 5.2 Is the policy made available to all interested parties? √ Communicated to suppliers via E-mail

5.2 19 Is the policy periodically reviewed for suitability? 5.2 Is the policy periodically reviewed for suitability? √ Reviewed in each MRM

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and Responsibility & Authority for Muolding Engineer
5.3 20
personnels to achive effective implementation
5.3
documented?
√ evidenced.

EHS Objectives defined for year 2019 ;LTC- 0 ;


Does the process defined enviromental objectives based on Are documented health and safety objectives established for each
6.2 21
significant enviromental impacts?
6.2
relevant function?
√ LTCR& RCR-0 Energy -2.04 per kg; Water- 4.4
Ltrs/Kg ;Waste - 76 % volisation

EHS Management programes are evidenced Eg:


1)50 % recovery of spent solvent ; 2) 15 %
Does the process defined a plan to achieve EMS objectives (What is
Are H&S objectives established and they consistent with the reduction in electricity in 1800 T IM ; 3)10 %
6.2 22 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
√ reduction in paint consumption per cycle 4)Zero
system ) - Managemnt Programes
recordable case due to slips /Falls in cooling
tower

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 23
documented?
6.2
established?
√ EHS Operational master plan - 2019

Page 34 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Top Management CONCLUSION

37
0

0
0
Auditor:Mr.Sundar rajan Auditee:Mr.Raghunathan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 24
intervals?
6.2
documented?
√ EHS Operational master plan - 2019

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 25
circumstances?
6.2
regular and planned intervals?
√ EHS Operational master plan - 2019

Are health and safety management programmes are amended to


26 6.2
address changing circumstances?
√ EHS Operational master plan - 2019

7,1 27 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil √ EHS Operational master plan - 2019

The needs of the environmental management system considering The needs of the Safety management system considering human
28 human resources, natural resources, infrastructure, technology and 7.2 resources, natural resources, infrastructure, technology and financial √ EHS Operational master plan - 2019
financial requirements for the process? requirements for the process?

have top management allocated resources needed and reviewed for have top management allocated resources needed and reviewed for EHS Operational master plan - 2019 & reviewed
7.1 29
adequacy?
7.1
adequacy?
√ in Monthly MRM

Has the process identified the competency requirements for effective Are competence requirements are defined - Gap identified and
7.2 44 7.2
implementation of EMS fuillfilled ( Training needs, plan, achievement and effectiveness)

Are employees are aware of the importance of the requirements of


7.2 45 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 46 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and
and the implications of not conforming with these requirements? consequences of departing from procedures?

Do training procedures take into account differing levels of Do training procedures take into account differing levels of
7.2 47 7.3
responsibility, ability, literacy and risk? responsibility, ability, literacy and risk?

Are training needs are identified and trainings are provided to satisfy Are training needs are identified and trainings are provided to satisfy
7.2 48 7.2
competence needs? competence needs?

7.2 49 Are training records are maintained? 7.2 Are training records are maintained?

Page 35 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date:06.11.2019 Process :Top Management CONCLUSION

37
0

0
0
Auditor:Mr.Sundar rajan Auditee:Mr.Raghunathan
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External) Intenal mails; corporate mails,communication
7.4 30
towards EMS
7.4
towards OHSAS
√ from TNPCB

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as
8.1 58 8.1
defined in significant aspects report defined in risk report

Does the process ensure that calibrated or verified monitoring and


81 9.1.1
measurement equipment is used and maintained?

9.2 31 Does internal audit planned and scheduled as per procedure? 9.2 Does internal audit planned and scheduled as per procedure? √ Yearly once - Nov 2019 schedule evidenced

Does internal audit conducted as per defined frequency by qualified Does internal audit conducted as per defined frequency by qualified
9.2 32
auditors & all findings are closed effectively with corrective action.
9.2
auditors & all findings are closed effectively with corrective action.
√ Nov 2019 audit schedule evidenced.

Has top management reviewed the Process’s health and safety Monthly MRM conducted and annual MRM as
Has a management review been conducted and recorded covering all
9.3 33
the requirements of the new ISO 14001:2015 standard?
9.3 management system at planned intervals, to ensure its continuing √ per EHS Agenda conducted - MRM for 2019
suitability, adequacy, and effectiveness? planned in Nov 2019

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 34
control and correctly deal with the consequences?
10.2
documented?
√ EHS wals reports & action plans

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 35 the nonconformities encountered, including the environmental 10.2
of nonconformities?
√ EHS wals reports & action plans
impact?

36 10.2 Are corrective actions are followed up for effective implementation? √ Compliance

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 37 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance √ Monthly MRM EHS slides
environmental performance? environmental performance?

Page 36 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Has your SMRC determined external and internal issues relevant to its Has your SMRC determined external and internal issues relevant to its
4.1 1 purpose that could affect its ability to achieve the intended result(s) 4.1 purpose that could affect its ability to achieve the intended result(s)
of its EMS? of its OHSMS?

Does your SMRC monitor and review external and internal Does your SMRC monitor and review external and internal
4.1 2 environmental conditions which could affect the SMRC, and which the 4.1 environmental conditions which could affect the SMRC, and which the
SMRC could affect? SMRC could affect?

Does the process identified the interested parties that are relevant to Does the process identified the interested parties that are relevant to
4.2 3 4.2
the EMS? the OHSMS?

Does the organisation determine the requirements of these interested Does the organisation determine the requirements of these interested
4.2 4 4.2
parties that are relevant to the EMS, parties that are relevant to the OHSMS,

which may include regulatory requirements, local, regional or global which may include regulatory requirements, local, regional or global
4.2 5 environmental conditions that can affect, or be affected by, your 4.2 environmental conditions that can affect, or be affected by, your
SMRC? SMRC?

Does your SMRC determine which of those requirements are to be Does your SMRC determine which of those requirements are to be
managed as compliance obligations in order to mitigate adverse risk managed as compliance obligations in order to mitigate adverse risk
4.2 6 4.2
or exploit beneficial opportunities that can be integrated in the or exploit beneficial opportunities that can be integrated in the
operational planning of the EMS? operational planning of the OHSMS?

Has the Process determined defined and documented the scope of its
4.3 7 Does the scope of EMS defined clearly and documented 4.3
H&S management system?

Does the Organisation estabilished, implemented and maintained Has the Process established, documented, implemented and
4.4 8 4.3
EMS maintained and continually improved an H&S management system in
accordance with the requirements?

Has Top Management taken accountability for the effectiveness of Has Top Management taken accountability for the effectiveness of
5.1 9 5.1
the EMS? the OHSMS?

5.1 10 established the policy and objective in line with strategic direction? 5.1 established the policy and objective in line with strategic direction?

ensured the EMS processes have been aligned with the business ensured the OHSMS processes have been aligned with the business
5.1 11 5.1
objectives? objectives?

5.1 12 ensured allocation of adequate resources? 5.1 ensured allocation of adequate resources?

Page 37 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

directed and supported persons who contribute to the effectiveness directed and supported persons who contribute to the effectiveness
5.1 13 5.1
of the environmental management system? of the environmental management system?

supported relevant management roles to demonstrate their supported relevant management roles to demonstrate their
5.1 14 5.1
leadership as it applies to their areas of responsibility? leadership as it applies to their areas of responsibility?

Is the health and safety policy documented and authorized by top


5.2 15 EMS Policy 5.2
management?

appropriate – considering knowledge gained from Clause 4


Is the policy is appropriate to the nature and the scale of the Process’s
5.2 16 requirements, as well as the impacts of its activities, products and 5.2
health and safety risks?
services?

strategic – providing a framework for setting environmental


5.2 17 5.2 Does the policy include a commitment to continual improvement?
objectives?

proactive – by including a commitment to the protection of the Does the policy include a commitment to comply with applicable
5.2 18 5.2
environment? legislation and other requirements to which the Process subscribes?

ensures fulfillment of your compliance obligations and to continually


5.2 19 5.2 Is the policy implemented?
improve your EMS?

Is the policy effectively communicated in the Process and employees Is the policy effectively communicated in the Process and employees
5.2 20 5.2
are aware of their EMS obligations? are aware of their H&S obligations?

5.2 21 Is the policy made available to all interested parties? 5.2 Is the policy made available to all interested parties?

5.2 22 Is the policy periodically reviewed for suitability? 5.2 Is the policy periodically reviewed for suitability?

Does the process have clear roles, responsibility and authority for Are roles, responsibilities and authorities are defined and
5.3 23 5.3
personnels to achive effective implementation documented?

DID ASPECTS & Imapcts DETERMINATION INCLUDE consideration of a life Is a procedure for the identification of hazards and assessment of
6.1.2 25 6,1,2
cycle perspective? risks established and is the methodology defined?

Do risk assessment procedures cover routine-non routine activities;


6.1.2 26 communicated significant aspects throughout your process ? 6,1,2
personnel having access to the workplace (visitors, subcontractors)?

Page 38 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

developed an appropriate plan to address the significant aspects,


compliance obligations and risks and opportunities - considering Does the methodology provide for the classification of risks and
6.1.2 27 6,1,2
technological options and its financial, operational and business identification of those that are to be eliminated or controlled?
requirements?

Does the methodology provide input into the determination of the


28 6,1,2 facility requirements, identification of training needs and
development of operational controls?

Do risk assessment results demonstrate that all the activities and


29 6,1,2
facilities were covered and risks were evaluated?

30 6,1,2 Does the process link to operational control procedures?

Are results of hazard identification and risk assessments considered


6.1.2 31 The results of aspect & imapct considerd for Objectives setting? 6,1,2
while setting health and safety objectives?

determined, and have access to, compliance obligations related to its


6.1.3 32 6.1.3 Are requirements other than legal requirements identified?
environmental aspects?

determined how these compliance obligations apply to the Is the information concerning applicable legislation and other
6.1.3 33 6.1.3
organisation? requirements kept up-to-date?

accounted for these obligations when establishing, implementing, Is relevant information on legal and other requirements is
6.1.3 34 6.1.3
maintaining and continually improving its EMS? communicated to employees and other interested parties?

Does the process defined enviromental objectives based on Are documented health and safety objectives established for each
6.2 35 6.2
significant enviromental impacts? relevant function?

Does the process defined a plan to achieve EMS objectives (What is


Are H&S objectives established and they consistent with the
6.2 36 objective,target,responsibility,time frame , methods & evluation 6.2
commitment to continual improvement?
system ) - Managemnt Programes

Are responsibilities, means and timeframe for achieving objectives are Are programmes for achieving health and safety objectives are
6.2 37 6.2
documented? established?

Page 39 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Are management programmes are reviewed at regular and planned Are responsibilities, means and timeframe for achieving objectives are
6.2 38 6.2
intervals? documented?

Are management programmes are amended to address changing Are health and safety management programmes are reviewed at
6.2 39 6.2
circumstances? regular and planned intervals?

Are health and safety management programmes are amended to


40 6.2
address changing circumstances?

7,1 41 Have sufficient and adequate resources been allocated to fulfil 7.1 Have sufficient and adequate resources been allocated to fulfil

The needs of the environmental management system considering The needs of the Safety management system considering human
42 human resources, natural resources, infrastructure, technology and 7.2 resources, natural resources, infrastructure, technology and financial
financial requirements for the process? requirements for the process?

have top management allocated resources needed and reviewed for have top management allocated resources needed and reviewed for
7.1 43 7.1
adequacy? adequacy?

Has the process identified the competency requirements for effective Are competence requirements are defined - Gap identified and
7.2 44 7.2
implementation of EMS fuillfilled ( Training needs, plan, achievement and effectiveness)

Are employees are aware of the importance of the requirements of


7.2 45 Has trainings are planned, Executed and effectiveness monitored 7.2
the H&S management system?

has your process ensured that persons working under its influence are Are employees are aware of the H&S consequences of their work
7.3 46 aware of its policy, aspects and impacts, their contribution to the EMS 7.3 activities, benefits of improved personal performance, and
and the implications of not conforming with these requirements? consequences of departing from procedures?

Do training procedures take into account differing levels of Do training procedures take into account differing levels of
7.2 47 7.3
responsibility, ability, literacy and risk? responsibility, ability, literacy and risk?

Are training needs are identified and trainings are provided to satisfy Are training needs are identified and trainings are provided to satisfy
7.2 48 7.2
competence needs? competence needs?

7.2 49 Are training records are maintained? 7.2 Are training records are maintained?

Page 40 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the process have communication system (Internal & External) Does the process have communication system (Internal & External)
7.4 50 7.4
towards EMS towards OHSAS

7.5 51 Does the process have clear document control procedures 4.4.5 Does the process have clear document control procedures

Does the process have proper Document identification,revision Does the process have proper Document identification,revision
7.5 52 7.5
control,status,storage, retrival system in place control,status,storage, retrival system in place

Are documents are periodically reviewed, revised as necessary and Are documents are periodically reviewed, revised as necessary and
7.5 53 7.5
approved by authorized personnel? approved by authorized personnel?

7.5 54 Are current versions available at all relevant locations? 7.5 Are current versions available at all relevant locations?

Are obsolete docs protected against unintended use; retained ones Are obsolete docs protected against unintended use; retained ones
7.5 55 7.5
identified? identified?

have you determined the controls to ensure your significant


Are operations and activities associated with risks where control
8.1 56 environmental aspects are addressed considering Elimination, 8.1
measures need to be applied are identified?
substitution, isolation, Engineering.admin control

Have you determined the controls to ensure your significant


8.1 57 8.1 Do operational control requirements cover all activities and facilities?
environmental aspects are addressed considering each life cycle stage

Does the process provide evidence that controls are implemented as Does the process provide evidence that controls are implemented as
8.1 58 8.1
defined in significant aspects report defined in risk report

Do documented procedures exist where their absence could lead to Do documented procedures exist where their absence could lead to
8.1 59 8.1
deviations from the policy and the objectives? deviations from the policy and the objectives?

8.1 60 Are operating criteria stipulated in the procedures? 8.1 Are operating criteria stipulated in the procedures?

Are the product life cycle assessment carried out in


8.1 61
Design,manufacturing,transport,use and disposal

have processes been established, implemented and maintained to Has the Process established, implemented and maintained a
8.2 62 prepare for and respond to potential emergency situations identified 8.2 procedure(s) to identify potential emergency situations and potential
and documented? accidents that can have an impact(s) and how it will respond to them?

Page 41 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

Does the Process respond to actual emergency situations and


63 8.2
accidents, and prevent or mitigate associated adverse risks?

Does the Process periodically review and, where necessary, revise its
64 8.2 emergency preparedness and response procedures, in particular, after
the occurrence of accidents or emergency situations?

Does the Process also periodically test such procedures where


65 8.2
practicable?

In developing its procedures, has the Process considered the nature


of on-site hazards, e.g., flammable liquids, storage tanks and
66 8.2
compressed gases, and measures to be taken in the event of spillages
or accidental releases?

In developing its procedures, has the Process considered the most


67 8.2
likely type and scale of an emergency situation or accident?

In developing its procedures, has the Process considered the most


68 8.2 appropriate method(s) for responding to an accident or emergency
situation?

In developing its procedures, has the Process considered internal and


69 8.2
external communication plans?

In developing its procedures, has the Process considered the action(s)


70 8.2
required to minimize environmental damage?

In developing its procedures, has the Process considered the


71 8.2 mitigation and response action(s) to be taken for different types of
accident or emergency situation?
In developing its procedures, has the Process considered the need for
72 8.2 a process for post-accident evaluation to establish and implement
corrective and preventive actions?

In developing its procedures, has the Process considered the periodic


73 8.2
testing of emergency response procedure(s)?

In developing its procedures, has the Process considered the training


74 8.2
of emergency response personnel?

In developing its procedures, has the Process considered a list of key


75 8.2 personnel and aid agencies, including contact details (e.g. fire
department, spillage clean-up services)?

Page 42 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

In developing its procedures, has the Process considered evacuation


76 8.2
routes and assembly points?

In developing its procedures, has the Process considered the potential


77 8.2 for an emergency situation(s) or accident(s) at a nearby facility (e.g.
plant, road, railway line)?

In developing its procedures, has the Process considered the


78 8.2
possibility of mutual assistance from neighbouring Processs?

Has the process established and implemented a procedure to


Does the process defined what needs to be measured, the frequency
9.1 79 9.1.1 regularly monitor and measure the key characteristics of its
of measurement and the evaluation of results towards EMS?
operations that have a significant risk?
Does the procedure include documenting information to monitor
80 9.1.1 performance, applicable operational controls and conformity with the
health and safety objectives and targets?

Does the process ensure that calibrated or verified monitoring and


81 9.1.1
measurement equipment is used and maintained?

Has the process established and implemented a procedure to


9.1.2 82 DOES THE PROCESS INCLUDE 9.1.2 periodically evaluate how well your Process complies with legal
requirements?

Are there records of the results of your Process's legal compliance


9.1.2 83 Determination of frequency of evaluation of compliance 9.1.2
evaluations?

Has the process established and implemented a procedure to


9.1.2 84 Evaluation of compliance and undertaking of action if needed? 9.1.2 periodically evaluate how well your Process complies with non-legal
(other) requirements?

Are there records of the results of your Process's non-legal (other)


9.1.2 85 Maintenance of knowledge and understanding of its status? 9.1.2
compliance evaluations?

9.2 86 Does internal audit planned and scheduled as per procedure? 9.2 Does internal audit planned and scheduled as per procedure?

Does internal audit conducted as per defined frequency by qualified Does internal audit conducted as per defined frequency by qualified
9.2 87 9.2
auditors & all findings are closed effectively with corrective action. auditors & all findings are closed effectively with corrective action.

Has top management reviewed the Process’s health and safety


Has a management review been conducted and recorded covering all
9.3 88 9.3 management system at planned intervals, to ensure its continuing
the requirements of the new ISO 14001:2015 standard?
suitability, adequacy, and effectiveness?

Page 43 of 44
EMS (ISO 14001:2015) & OHSMS(ISO 45001:2018) Internal audit checklist
Audit Date: Process : CONCLUSION

0
0
0
0
Auditor: Auditee:
Opportunities for
Audit Findings Evidences
Improvement

Compliance
Clause Question

Minor N/C

Major N/C
Clause No. Audit Question - OHSMS (ISO 45001:2018) Provide reference to documented information to justify Provide suggestions for
No. No. Audit Question - EMS (ISO 14001:2015)

OFI
the finding process improvement

when nonconformance occurs, does the organisation take steps to Are the causes of nonconformities are investigated and results
10.2 89 10.2
control and correctly deal with the consequences? documented?

Are corrective actions appropriate to the significance of the effects of


Are appropriate corrective actions developed to eliminate the causes
10.2 90 the nonconformities encountered, including the environmental 10.2
of nonconformities?
impact?

Are proposed corrective and preventive actions are reviewed through


91 10.2
risk assessment?

92 10.2 Are corrective actions are followed up for effective implementation?

does your process continually improve the suitability, adequacy and does your process continually improve the suitability, adequacy and
10.3 93 effectiveness of the environmental management system to enhance 10.3 effectiveness of the Health & Safety management system to enhance
environmental performance? environmental performance?

Page 44 of 44