COMPANY PRESENTATION

INTRODUCTION OF GREENCELLS GROUP

Business Agile international PV down-


Business model with maximum of flexibility Sound financials and no long-term debt
stream company covering
 project development,
 engineering, procurement,
construction (EPC),
 operation and
maintenance (O&M)
of utility-scale solar PV power
plants
Founded 2007
Ownership Privately owned by Global footprint – activities in >20 countries Strong international track record of > 1.45GW
management
HQ Saarbrücken, Germany
Staff 73 employees
Track More than 1,450 MW
record developed and/or built
Revenue EUR 41M in 2016, EUR 76M in
2017
STRICTLY CONFIDENTIAL UNDER NDA 2
ENGINEERING, PROCUREMENT & CONSTRUCTION AT A GLANCE

MWp
180
EPC 59,0%

135
GC 38,0%
90
SUB 3,0%
45
SPLIT OF TURNOVER
IN 2016 (APPROX.) 0 ‘05-’07 2009 2011 2013 15/16 17/18

Since 2008 Greencells has Greencells is a debt free company, Always fast to market:
completed owned by its management, and won Since entering the UK market in
113 power plants until the end of the 12th Deloitte 2014, Greencells has installed more
March 2018, amounting to Technology Award. than 300 MWp – and thus acquired
1290 MWp installed capacity. a 15% market share (utility scale)
We expect earnings of during this period.
more than $80mn. this year.
WHAT WE DO

1. CO-DEVELOPMENT

2. ENGINEERING

3. PROCUREMENT

4. CONSTRUCTION

5. OPERATION &
MAINTENANCE

PLAN. BUILD. RUN.


GREENCELLS’ USP ADDRESSES THE NEEDS OF THE GLOBAL PV INDUSTRY

MAXIMUM OF FLEXIBILITY PREMIER QUALITY AROUND THE GLOBE CONTINUOUS COST REDUCTIONS

Greencells’ business approach is Greencells develops and builds high- Having thrived as a company during
focused on offering a maximum of quality PV plants in emerging markets times of crisis in the German PV
flexibility with a highly modular scope around the globe by: industry, Greencells has always
of services: Greencells offers exactly  Injecting its vast PV experience focused on lean operations and
those downstream services that cater early in the development process continuous reduction of cost by
best to the individual project’s or  Strict quality management streamlining of processes, increasing
customer’s needs the flexibility and optimizing
 Complementing local workforce
with experienced Greencells Greencells’ business model
installation staff
STRICTLY CONFIDENTIAL UNDER NDA 5
PROJECT DEVELOPER AND EPC ARE KEY ROLES IN CREATING PV PLANTS

Covered by Greencells Not covered by Greencells


PV DOWNSTREAM INDUSTRY STRUCTURE WITH KEY ACTIVITIES
DEVELOP BUILD RUN
Early-stage Late-stage Engineering Procurement Construction O&M Owning
development development

The roles “project developer”, “EPC” and “O&M provider” are segmented in further sub-roles, often offered by different actors. In the PV
industry, business models and activities covered by different PV downstream players differ widely, despite having the same role.

 Identifying and securing land  Designing and optimizing the PV  Technical operations:
 Identifying power offtaker plant for the specific site Monitoring, preventive
maintenance and repairing
 Conducting site studies
defects
 Arranging permits  Selecting and procuring
 Commercial operations:
components, mainly PV modules,
Reporting and accounting
 Negotiating power purchasing agreement (PPA) inverters and mounting structures
 Selecting suppliers, mainly EPC
 Planning and arranging grid connection  Earthworks and preparation of site  Providing equity
 Financing development  Mechanical construction  Earning profits of plant
 Finding an investor to sell to  Electrical installation

Greencells offers a highly modular scope of services, covering whatever combination of downstream activities is optimal for
the individual project
6
OUR DOWNSTREAM PLATFORM

Order to deliver turn-key Delivers


Past: system as EPC or GC COD

Standard
Project Owner Project
EPC

Open interface to 3rd party


Today: EPCs

OUR KEY
CAPABILITIES PLAN BUILD RUN
& SERVICES

Market Co- Construction: O&M + M&A


Intelligence Development EPC / EPC Light / GC Build-Operate-Transfer

Downstream Platform for Corporate Partners:  Module manufacturers


 Cell Manufacturers
 Utilities / Integrators
 Financial Investors / IPPs
RISK IS MANAGED THROUGH A DISCIPLINED BUSINESS DEVELOPMENT APPROACH

LEAD QUALIFICATION AND BUSINESS DEVELOPMENT PROCESS


access to a huge network
Greencells’ business partners
Process Start of projects and developers Lead
through market presence
for 15 years, existing peers
1. & intelligent market
research S S
Opportunities
Commercial / Utility Scale
can participate at any stage:
Gate to be passed in Industrial
2. order to qualify as lead
Quality Classification Co-
Bids
 Early-stage codevelopment
gates EPC Development EPC
(RFPs)
3.
Allocation according to
segment definitions
Projects  Late-stage codevelopment
Quick Test
Account team, internal S S PCP
lead PCP
S S  Project right acquisition
meeting, sales calls, Go / lead Go / Go /
4. planning, travels, follow- No-Go PCP
lead
No-Go No-Go  Construction bridge finance
Qualification ups

Not just “opportunity” Promising EPC Realistic Projects Promising Bids Promising EPC
 Module supply
Qualified Lead
 …
Sales calls, meetings, Project Pipeline
research, pre-pare
5. Pursuit approval Project Bid
Basic Planning Basic Planning
Development Preparation
Subject to project / deal S SProject Board, SPAA, Project S
PAA, Project
size, structure and LoA’s
corporate warranties SVB Board, LoA’s Board, LoA’s
6. Approval

M Project realisation Downstream platform for


7. Offer process PLAN – BUILD - RUN
Process End business partners

S Subprocess within Greencells

M Other main process within Greencells


8
GREENCELLS IS MORE THAN JUST AN EPC PROVIDER

One stop shop for solar projects

The entirety of the EPC


system integration,
plus:

• Planning Consultancy

• Financial Advisory

• Know-how transfer to
investor staff

• excellent ESS & Grid


integration
GREENCELLS COVERS ENTIRE PV PROJECT VALUE CHAIN

→ Greencells provides own → Greencells identifies ready-to-build


Operation, Maintenance and sites where permitting processes are
Management. We offer a wide Project straightforward and network
range of services such as Development connection points are available close
preventative and corrective fault by.
intervention, monitoring and → The company undertakes own
reporting, as well as asset Co-development
developing effort, closes framework
management and direct power & brokerage
agreements with developers, utilities
sales. and, where appropriate, with solar
power operators.

Long-term
O&M security Steady power EPC or GC
generation execution

Turnkey systems

• During construction phase, Greencells is responsible for designing, planning and managing the entire construction process.
• After exhaustive tests according to German standards the system is handed over either to a third party owner or the partner utility -
operated and maintained by Greencells.
GREENCELLS’ RELIABLE REALISATION ORGANIGRAM PROVIDES HIGH FLEXIBLITY

GREENCELLS SECURES LOCAL VALUE CREATION, BUT ENSURES QUALITY AND SPEED OF THE CONSTRUCTION.

Project and site management

Local content/local services Civil works / construction Electric installation / commissioning / monitoring Procurement

Workforce recruitment 1 Construction leader Electrical leader Logistic services

Local site security Foremen for civil works / Foremen for electric Installation / commissioning / Technical advisor /
ramming / mounting monitoring owners engineer

Supply of machinery 2 Teams1 5 Teams1 3 Teams1 2 teams1 2 teams1 Greencells


(5–8 (2–4 (7–10 (7–10 workers) (3–5 workers)
workers) workers) workers)
Local partner/external

Mixed
1) Either Greencells or local partner, depending on individual project

11
DEVELOPMENT OF HIGH-QUALITY PROJECTS IN INTERNATIONAL PV MARKETS

PLAN BUILD RUN

“As a project developer, Greencells leads the project from its inception to the construction stage.”

ACTIVITIES DIFFERENTIATION EXAMPLES

Co-development  Ensuring quality in emerging PV markets: Greencells has developed / built 107 projects and
 Working with local well-connected early-stage With proven processes and vast experience has a significant pipeline under development.
developers as partners with PV projects, Greencells helps local Some examples are:
developers in new PV markets to develop
 Supporting the local partners in technical
projects that meet highest international  Egypt:
aspects and ensuring highest quality
quality standards (Co)-Development of 60 MWp
standards in early-stage development
Late-stage development  Build as permitted: Providing the technical
design early on in the approval procedures,
 Acquiring project rights or contributing late- avoids changes of the construction permit and  Bangladesh:
stage development in co-development thus streamlines the development process Development of 2 projects with
projects 130 MWp together with a local
 High quality pipeline: Following clearly set developer and the IFC
 Greencells covers the full spectrum of late-
quality gates, Greencells ensures a high quality
stage development, including securing a
throughout its pipeline and thus is a trusted
bankable power purchasing agreement (PPA),
partner for investors
planning and negotiation of grid connection,
finding an investor and financing project
development based on set quality gates

12
FAST, RELIABLE CONSTRUCTION OF PV POWER PLANTS AT LOW COST

PLAN BUILD RUN

“Greencells constructs high-quality power plants in various roles, whatever is best suited for the individual project.”

ACTIVITIES DIFFERENTIATION EXAMPLES

Greencells takes various roles in building PV  Strong track record: 1 GW of international Greencells has constructed more than 1 GWp of PV
plants: being a turnkey EPC, a general contractor experience and track record allows Greencells power plants around the globe. Some examples
or offering only mechanical installation to optimize the technical design to reduce cost are:
 Turn-key EPC: Offering a turnkey PV plant, and improve yield
including technical design, selection and  Full scope: High flexibility in scope offered,  Cottbus I, II, III:
procurement of components, construction and often act even as subcontractor for other EPCs 167 MWp – largest project
commissioning, all backed by performance of Greencells in Germany
 Full transparency: In selected projects,
guarantees Greencells is offering open-book contracts
 General contractor (GC): Constructing the PV giving full transparency to its customers
power plant based on the plans of the EPC  Experienced workforce at low cost:  Rose & Crown:
with components purchased by the EPC Greencells has highly trained Romanian 30 MWp – largest project
 Mechanical works: Offering only mechanical workers that bring experience in constructing of Greencells in England
installation to other EPCs or general PV plants and build plants across Europe
contractors  Local content: Outside Europe, Greencells
supplementing teams of eight local workers –  Sweihan 1.2 GWp:
thereby having a high local content – with one Selected as GC for 290 MWp;
experienced Greencells employee to improve supplying mounting
quality of construction structures for full 1.2 GWp of
project in Abu Dhabi/UAE
13
FLEXIBLE OPERATIONS & MAINTAINANCE SERVICES FOR ASSET OWNERS

PLAN BUILD RUN

“Greencells provides the full operations and maintenance package in markets where they can attain a critical mass of projects.”

ACTIVITIES DIFFERENTIATION EXAMPLES

 Monitoring: 24/7 plant monitoring from  Selected markets: Greencells provides O&M  Greencells provides O&M services for a total of
central control room in Romania to identify services only in markets where they have 320 MWp across 24 PV power plants in the UK
changes in performance and malfunctions sufficient projects to attain economies of scale,
 Greencells provides its O&M services for major
early on currently only in the UK
PV asset owners in the UK, including:
 Reporting: Of performance to asset owners  Low cost base: Monitoring operations in
Romania results in low cost base for the labor-
 Preventive and corrective maintenance:
intense monitoring
Schedule, arrange and manage electrical and
mechanical maintenance works, including  Full flexibility for asset owners: Greencells
management and storage of spare parts, as offers to cover a wide range of O&M services
well as management of warranty claims and customers can decide which aspects to
outsource to Greencells and which aspects to
 Field services: Greenkeeping of the site, e.g.,
cover inhouse
grass cutting, hedge trimming, and cleaning of
the modules if accumulated soiling sufficiently
decreases the output of the PV plant
 Availability guarantee provision: Guarantees
up to 84% performance ratio for PV Systems
and 99% availability backing the owners’
financial models

14
LATEST CLIENTS & FINANCING REFERENCES

COUNTRY SIZE IN MWP CLIENT INVESTOR BANK SCOPE


Toggam Farm
Greenheath Forest Heath Roundshield CO-DEV.
UK 12,9
Ltd., UK Council, UK (mezzanine) EPCM

Coombeshead
Meryll Lynch /
Belltown Belltown
UK 9,6 Bank of EPCM
Power, UK Power, UK
America
Hawkers Farm Roundshield
NEXT Energy NEXT Energy
UK 11,8 (mezzanine) EPCM
Capital, UK Capital, UK
Macquarie (longterm)
Lwyndu Farm
NEXT Energy NEXT Energy
UK 8 NIBC BANK, NL EPCM
Capital, UK Capital, UK

Cockhill Farm
NEXT Energy NEXT Energy
UK 20,2 NIBC BANK, NL EPCM
Capital, UK Capital, UK
LATEST CLIENTS & FINANCING REFERENCES

COUNTRY SIZE IN MWP CLIENT INVESTOR BANK SCOPE


Roundponds
Buckland Buckland
UK 13,1 Close Brothers EPCM
Capital, UK Capital, UK

Reden Mine Vereinigte


GER 8 RAG, GER RE:Cap, CH Volksbank Saar, EPC
DE
ROC 1.2 sites
Macquarie
UK 80 N/A NESF EPC
RBS (2 sites)

Dej Mountain
RO 5,87 UniSUN, CN UniSUN, CN n/a EPC

COTTONWOOD
CO-DEV.
US 4,2 Blue Planet LG CAPITAL full equity
EPCM

16
PRODUCTIVITY – 15 DISPERSED PROJECTS IN UK ONLY IN Q1 / 17

Project Size MWp Construction Start Energisation date Days to Completion Lisburn
Carrowdore 6 03/11/2016 20/02/2017 93
Lisburn 20.5 03/11/2016 27/02/2017 99
Henley 5 04/12/2016 10/03/2017 82
Eaglescliff 5 13/02/2017 26/03/2017 35
Swanland 5 06/01/2017 22/03/2017 64
Hill Farm 4.985 25/01/2017 22/03/2017 48
Axe View 5 06/03/2017 27/03/2017 18
Manor Wasing 5 23/01/2017 28/03/2017 55
Flixborough 5 20/02/2017 29/03/2017 32
Siddick Workington 5 10/02/2017 29/03/2017 40 Siddick Workington
Pottersbar 5 19/12/2016 26/02/2017 59
Pickhill Bridge 3.63 23/01/2017 05/03/2017 35
Farm
Forest Farm 3 14/12/2016 05/02/2017 45
Meadowly (Upper) 5 27/01/2017 31/03/2017 54
Bryncyrnau Isaf 5 03/02/2017 31/03/2017 48
Sub-Total 88.115

average construction speed: 1 MW a day – Peak speed: 2 MW a day… in 15 projects in parallel…


ACTUAL PIPELINE GLOBALY

ACTUAL PROJECTS IN GREENCELLS PIPELINE


Country Netherlands Country Poland
Size 80 MWp (5 projects) Size 6 MWp (6 projects)
Status Late-stage Status under construction Country Hungary
Greencells' role Codeveloper & EPC Greencells' role EPC Size 200 MWp (6 projects)
Country France Status Late-stage (FIT)
Size 170 MWp (18 projects) Greencells' role EPC
Status Late-stage (FIT)
Greencells' role Codeveloper
Country Albania
Size 125 MWp
Status CFD scheme
Greencells' role Co-Dev EPC

Country USA / North Carolina Country Bangladesh


Size 20+26 MWp (PPA / ITC) 2 Projects Size 2 x 50 MWp (2 projects) + 100 MWp
Status Ready-to-build Status Late-stage (PPA)
Greencells' role EPC Greencells' role Codeveloper & EPC + EPC

Country UK - Greencells Portfolio


Size 150 MWp (4 projects)
Status Shovel-ready (synthetic PPA)
Greencells' role EPC
Country Vietnam
Country Spain - Greencells Portfolio
Size 50 MWp
Size 150 MWp (3 projects)
Status Late-stage (FIT)
Status Late-stage (FIT)
Greencells' role EPC
Greencells' role Codeveloper & EPC
Country Egypt
Size 60 MWp (FIT) + 120 MWp
Country Chile
Status Ready-to-build
Size 43 MWp + 96 MWp (1 project)
Greencells' role EPC / CC in a JV
Status Ready-to-build (PPA)
Greencells' role EPC

Country Nigeria Country Philippines / Mindanao


Country Malaysia
Size 130 MWp (1 project) Size 32 MWp (PPA)
Size 45 MWp (PPA)
Status Ready-to-build (PPA) Status Under construction
Status Late-stage (FIT)
Greencells' role EPC Greencells' role EPC
Greencells' role Codeveloper & EPC

STRICTLY CONFIDENTIAL UNDER NDA 18


COMPANY STRUCTURE – MANAGEMENT LEVEL

Total staff:
73 employees and
>250 workers1
Andreas Hoffmann Marius Kisauer
CEO CFO/COO

Business Development & Sales Branch Offices Legal Corporate Finance Firmwide

Thomas Freyberg Florian Johänntgen Stefan Riel Stefan Horn Ardeshir Arian Ric Hallikeri Dan Cirstoc James Tyson Cyrill Reidelstürz Patrick Clemens
Global Head of Head of Sales Managing Director Managing Director Managing Director Managing Director Managing Director General Counsel SVP – Corporate CTO
Business APAC APAC USA MEA CEE Finance
Development

Business and Supporting Units

Business Unit (E) Business Unit (P) Business Unit (C) Business Unit (M) Business Unit (OM) Support Unit Support Unit Support Unit
Electrical + Strategic Construction Project Management+ Operations Controlling, Legal / HR / Mgtm. IT / Marketing
Civil Engineering Purchasing Management Quality Management & Maintenance Accounting, Treasury Assistance
14 Employees 14 Employees 11 Employees 9 Employees 8 Employees 10 Employees 3 Employees 4 Employees

Enzo Klepper Boris Radloff Dan Ludusan James Ricketts Costin Nicha Thorsten Günther Nicole Schubotz/ HR Georg Curta & Mihalcea
Head of Design & Head of Purchasing Head of Construction Head of Project- & Head of O&M Head of Financial Oksana Chines/ CoS Juraviea
Engineering Quality Management Control IT
STRICTLY CONFIDENTIAL UNDER NDA 19
1) Group wide - as of 2017-06-26 – workers only have short-term contract terms for employment
REFERENCES

Greencells Group operates its


own construction business
Unit with more than 500
employees. This allows us to
allocate resources in order to
meet demanding timelines
Kencot Hill Issacea Rochefort du Gard Hamburg
Located in England Located in Romania Located in France Located in Germany
Operating since 2014 Operating since 2012 Operating since 2013 Operating since 2011
37 MWp capacity 9 MWp capacity 25 MWp capacity 25 MWp capacity

Our construction
performance is up to 2 MWp
built per day.

Ford Farm Nancy Mainz Littlebourne


Located in France Located in France Located in Germany Located in England
Operating since 2016 Operating since 2011 Operating since 2010 Operating since 2014
11,5 MWp capacity 21 MWp capacity 123 kWp capacity 17 MWp capactiy
REFERENCES

Greencells uses only TIER1


components for the entire
design, which guarantees a
yearly degradation of not
more than 0,5%.

Rose & Crown Metz Herchenbach Laceby Farm


Located in England Located in France Located in Germany Located in England
Operating since 2016 Operating since 2011 Operating since 2013 Operating since 2016
30 MWp capacity 19 MWp capacity 5,5 MWp capacity 10 MWp capacity

Greencells guarantees up to
84% performance ratio for PV
Systems and 99% availability,
backed by AAA bonds (e.g.
SwissRe, R&V, Allianz, HDI,
CoFace)

Karlstadt Halberstadt Cottbus I,II,III Carnemough


Located in Germany Located in Germany Located in Germany Located in England
Operating since 2010 Operating since 2012 Operating since 2013 Operating since 2014
19 MWp capacity 18 MWp capacity 167 MWp capacity 4 MWp capactiy
GREENCELLS WORKS VERY EFFICIENTLY: 15 DISPERSED UK PROJECTS ONLY IN Q1

Project Size MWp

Greencells works very efficiently and has a track Carrowdore 6

record of meeting ambitious timelines Lisburn


Henley
21
5
Eaglescliff 5

In Q1/2017, Greencells worked on 15 dispersed projects in the UK Swanland


Hill Farm
5
5

88 MWp. Over these projects with an


Axe View 5
in parallel totaling Manor Wasing 5
Flixborough 5

average size of 5.9 MWp Greencells achieved an average construction Siddick Workington 5
Pottersbar 5

1 MWp per day, in peak times even


speed of Pickhill Bridge Farm
Forest Farm
4
3

2 MWp per day. Meadowly (Upper)


Bryncyrnau Isaf
5
5
Total 881

1) Sum does not add up due to rounding error

22
ENGINEERING EXCELLENCE

1. DESIGN FOCUS on Total Cost of Ownership (TCO)


The design of our power plants is optimized so as to obtain the best ratio between
CAPEX + OPEX / YIELD over the whole lifecycle of the asset.

2. TECHNICAL PROJECT
Greencells’ award-winning designs create power plants which are able to provide:
reactive power, load balancing and up to multiple Mega Watt hours storage capacity.

3. QUALITY MANAGEMENT
- up to 10 years overall guarantee
- Wrapping up different warranties for different parts
- Laboratory testing and certifications for key components
- Supply Chain Management

PLAN. BUILD. RUN.


www.greencells.com