Sei sulla pagina 1di 1

1 2 3 4 5 6 7 8 9 10 11

A
STO. PWD
HE
SHE

LANDING

FHC
LANDING CLASSROOM CLASSROOM CLASSROOM CLASSROOM FHC

FE FE FE FE
B UP DN DN UP

2 SECOND & THIRD FLOOR FIRE PROTECTION PLAN


FP-1 SCALE 1:100 M.

1 2 3 4 5 6 7 8 9 10 11

A
PWD PWD
HE
SHE
FHC

LANDING CLASSROOM CLASSROOM CLASSROOM CLASSROOM

ENGINE

JP FP
DIESEL
FE FE FE FE
B UP UP

C
UP UP

1 GROUND FLOOR FIRE PROTECTION PLAN


FP-1 SCALE 1:100 M.

REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS
MANUEL D. TORRES PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD
STANDARD THREE-STOREY GROUND FLOOR, SECOND FLOOR & THIRD FLOOR 57
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING FIRE PROTECTION PLAN FP-1
POSITION: MECHANICAL ENGINEER 63
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 12 CLASSROOMS )
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17)

Potrebbero piacerti anche