TELANGANA STATE POWER GENERATION CORPORATION LIMITED

VIDYUT SOUDHA :: HYDERABAD - 500082

Daily Generation Report : 22-08-2020

Capacity Daywise generation in MU 1st to 22nd Aug 1st Apr to 22nd Aug
Station Unit
(MW) 20-08-20 21-08-20 22-08-20 Gen (MU) PLF (%) Gen (MU) PLF (%)

Thermal Power Stations

Unit 9 250.0 3.90 30.24 22.91 335.17 38.79


Kothagudem - V
Unit 10 250.0 3.13 4.91 78.87 59.75 702.82 81.35

Kothagudem - VI Unit 11 500.0 9.25 10.84 9.66 217.00 82.20 1406.64 81.40

Kothagudem - V & VI Station 1000.0 13.15 13.97 14.57 326.12 61.76 2444.63 70.74

Kothagudem - VII Unit 12 800.0 9.27 8.16 17.06 313.72 74.27 2248.07 81.31

Kakatiya - I 500.0 106.09 40.19 938.76 54.33

Kakatiya - II 600.0 179.75 56.74 1292.82 62.35

Total Kakatiya - I & II 1100.0 285.84 49.22 2231.58 58.70

Bhadradri Unit 1 270.0 4.46 3.23 3.61 100.50 70.50 362.10 71.64

Unit 2 0.02

Unit 3

Unit 4

Station 270.0 4.46 3.23 3.61 100.50 70.50 362.12 71.64

Ramagundam - B 62.5 0.04 0.89 18.29 55.42 38.35 17.75

TSGENCO Thermal 3232.5 26.9 25.4 36.13 1044.47 61.20 7324.75 68.18

Hydro Power Stations

Priyadarshini Jurala 234.0 2.38 2.28 2.25 57.26 112.16

Lower Jurala 240.0 54.99 119.31

Srisailam Left 900.0 19.25 399.27 676.56

Nagarjunasagar 815.6 7.08 14.95 13.33 44.11 62.37

Nagarjunasagar Left Canal 60.0 0.33 0.38 0.44 4.78 6.93

Pulichintala 120.0 1.17 3.95 7.95

Singur 15.0

Nizamsagar 10.0

Pochampad 36.0 3.14 10.45

Peddapalli Mini Hydro 9.2 0.19 0.35

Palair Mini Hydro 2.0

TSGENCO Hydro 2441.8 29.05 17.61 17.19 567.68 996.08

TSGENCO Solar 1.0 0.47

TSGENCO Total 5675.3 55.96 42.97 53.33 1612.22 8321.36

Outage of Thermal Units

Kakatiya # 1 (500 MW) is under reserve shutdown from 11:26 on 15/08/20


Kakatiya # 2 (600 MW) is under reserve shutdown from 14:26 on 16/08/2020
Ramagundam # B (62.5 MW) was under outage due to coal feeding problem from 01:55 on 20/08/20 to 05:27 on 22/08/20
Kothagudem # 9 (250 MW) is under outage due to external fault from 20:31 on 20/08/20 and converted to reserve shutdown 21:31 on 20/08/20

Outage of Hydro Units

Priyadarshini Jurala HEP # 5 (39 MW) is under outage due to tripped on reverse power from 13:15 on 16/10/19
Nagarjunasagar HES # 8 (100.8 MW) is under LC for arresting oil leakage from GT B-Phase and for inspection of stator and rotor from 15:41 on 14/02/20
Pulichintala # 4 (30 MW) is under LC for attending turbine shaft alignment works from 13:22 on 08/05/20
Nagarjunasagar HES # 3 (100.8 MW) was under LC for rectification of oil lift pump problem from 07:50 on 10/08/20 to 17:56 on 22/08/20
Srishailam LBHES (6x900 MW) is not available due fire catch in power house from 22:52 on 20/08/20
Nagarjunasagar HES # 6 (100.8 MW) is under outage due to tripped on differential protection from 13:31 on 22/08/20

MIS / TSGENCO