Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TENDER DOCUMENT
Tender No: CE-CON-B-S-TN-2020-11 Closing Date/Time: 28/07/2020 14:30
GM_CONST acting for and on behalf of The President of India invites E-Tenders against Tender No CE-CON-B-S-TN-2020-11 Closing
Date/Time 28/07/2020 14:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers
are not allowed against this tender, and any such manual offer received shall be ignored.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.
1. NIT HEADER
Construction of UG Tunnel No. 5 (Approx. length - 165m) at Ch. 14.310 km to 14.475 km,
Cut & Cover Tunnel No. 2B (Approx. length - 130m) at Ch. 10.870 km to 11.000 km, C&C
No. 2C (Approx. length - 135m) at Ch. 11.160 km to 11.295 km, C&C No. 2D (Approx. length
- 300m) at Ch. 13.480 km to 13.780 km, Balance works of C&C No. 5A (Approx. length -
160m) at Ch. 14.610 km to 14.770 km and Balance works of UG Tunnel No. 3 (Approx.
Name of Work
207m UG Excavation & 242m Lining) at Ch. 13.228 km -13.470 km & UG Tunnel No. T4
(UG Excavation - 28m & Lining - 228.5m) at Ch. 13.849 km to 14.078 km including all
related ancillary works, Protection works, construction of side drains, etc in between stations
Bairabi and Hortoki in connection with Construction of New BG Railway Line Bairabi-
Sairang(Mizoram)
Bidding type Two Stage Reverse Auction
Tender Type Open Bidding System Two Packet System
Tender Closing Date Time 28/07/2020 14:30 Date Time Of Uploading Tender 09/06/2020 15:34
Pre-Bid Required No Pre-Bid Query Date Time Not Applicable
Advertised Value 1386021858.46 Tendering Section HQ TENDER
Bidding Style Single Rate for Each Schedule Bidding Unit
Earnest Money (Rs.) 7080200.00 Validity of Offer ( Days) 60
Tender Doc. Cost (Rs.) 25000.00 Period of Completion 18 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 26/06/2020 Yes
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Capital (Works)
2. SCHEDULE
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Schedule A-Execution of NFUSSOR-2010 Items of works as per Annexure-I Above/
66661419.62
andanyother Items of works of Chapter-I of NFUSSOR Below/Par
Please see Item Breakup for details. 181886547.40 (-) 63.35 66661419.62
1 Description:- Annexure-I (Earthwork etc.) and any other Items of works of Chapter-1 of N.F.Railways USSOR-
2010,which are not covered in Annexure-I, but required for successful completion of work.
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Schedule B-Execution of NFUSSOR-2010 Items of works as per Annexure-II andanyother Above/
979904.34
Items of works of Chapter-II of NFUSSOR2010. Below/Par
Please see Item Breakup for details. 1044451.44 (-) 6.18 979904.34
2 Description:- Annexure-II (Hiring of Multiutility Vehicle etc.) and any other Items of works of Chapter-II of
N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-II, but required for successful completion of
work.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Schedule C-Execution of NFUSSOR-2010 Items of works as per Annexure-III Above/
318611109.85
andanyother Items of works of Chapter-IV of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 308671875.46 3.22 318611109.85
3 Description:- Annexure-III (Curing Compound & Supply of Reinforcement etc ) and any other Items of works of
Chapter-IV of N.F.Railways USSOR-2010, which are not covered in Annexure-III,but required for successful
completion of work.
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Schedule D-Execution of NFUSSOR-2010 Items of works as per Annexure-IV Above/
3407013.71
andanyother Items of works of Chapter-XVII of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 3224811.84 5.65 3407013.71
4 Description:- Annexure-IV (Water Stop Etc.) and any other Items of works of Chapter-XVII ofN.F.Railways
USSOR- 2010, which are not covered in Annexure-IV, but required for successful completion of work.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Schedule E-Execution of NFUSSOR-2010 Items of works as per Annexure-V Above/
89643659.28
andanyother Items of works of Chapter-XIX of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 80017548.23 12.03 89643659.28
5 Description:- Annexure-V (Concrete Work etc.) and any other Items of works of Chapter-XIX of N.F.Railways
USSOR- 2010,which are not covered in Annexure-V, but required for successful completion of work.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Schedule F-Execution of NFUSSOR-2010 Items of works as per Annexure-VI Above/
38763253.69
andanyother Items of works of Chapter-XXII of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 35338913.02 9.69 38763253.69
6 Description:- Annexure-VI (Miscleneous Concerete work etc.) and any other Items of works of Chapter-XXII of
N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-VI, but required for successful completion of
work
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Schedule G-Execution of NFUSSOR-2010 Items of works as per Annexure-VII Above/
272186541.61
andanyother Items of works of Chapter-XXV of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 250609098.25 8.61 272186541.61
7 Description:- Annexure-VII (Supply of Materials etc.) and any other Items of works of ChapterXXV
ofN.F.Railways USSOR- 2010, which are not covered in Annexure-VII, but required for successful completion of
work.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule H-Execution of NS Items of works as per Annexure-VIII 27775514.40
Below/Par
Please see Item Breakup for details. 27775514.40 AT Par 27775514.40
8
Description:- Annexure-VIII (Earthwork in Excavation/Cutting & filling for Cut & Cover tunnel.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule I-Execution of NS Items of works as per Annexure-IX 102128310.00
Below/Par
Please see Item Breakup for details. 102128310.00 AT Par 102128310.00
9
Description:- Annexure-IX(UG Tunneling & Excavation )
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule J-Execution of NS Items of works as per Annexure-X 89199013.00
Below/Par
Please see Item Breakup for details. 89199013.00 AT Par 89199013.00
10
Description:- Annexure-X (Rock Bolts, Tunnel Supports etc.)
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule K-Execution of NS Items of works as per Annexure-XI 262445843.50
Below/Par
Please see Item Breakup for details. 262445843.50 AT Par 262445843.50
11
Description:- Annexure-XI (Shotcreting etc.)
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule L-Execution of NS Items of works as per Annexure-XII 87597591.11
Below/Par
Please see Item Breakup for details. 87597591.11 AT Par 87597591.11
12
Description:- Annexure-XII (Supply of tunnel supports items,Drainage composite etc )
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Code
Above/
Schedule M-Execution of NS Items of works as per Annexure-XIII 23079666.05
Below/Par
Please see Item Breakup for details. 23079666.05 AT Par 23079666.05
13
Description:- Annexure-XIII (Drainage pipe and Grouting items )
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Schedule N-Execution of NFUSSOR-2010 Items of works as per Annexure-XIV Above/
2662637.98
andanyother Items of works of Chapter-VIII of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 2514294.60 5.90 2662637.98
14 Description:- Annexure-XIV (Steel work etc.) and any other Items of works of Chapter-VIII of
N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-XIV, but required for successful completion of
work.
S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit
Schedule O-Execution of NFUSSOR-2010 Items of works as per Annexure-XV and any Above/
880380.32
other Items of works of Chapter-XXI of NFUSSOR-2010. Below/Par
Please see Item Breakup for details. 702786.24 25.27 880380.32
15 Description:- Annexure-XV (Pipe Railing work etc.) and any other Items of works of Chapter-XXI of
N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-XV, but required for successful completion of
work.
3. ITEM BREAKUP
Schedule A-Execution of NFUSSOR-2010 Items of works as per Annexure-I andanyother Items of works of
Schedule
Chapter-I of NFUSSOR
Annexure-I (Earthwork etc.) and any other Items of works of Chapter-1 of N.F.Railways USSOR- 2010,which are
Item- 1
not covered in Annexure-I, but required for successful completion of work.
S No. Item Description of Item Unit Qty Rate Amount
No
7 013140 Removal of excavated/slip earth/ debris/ malba from cum 26000.00 109.88 2856880.00
the site of works to any other place outside Railway
land/premises, including all excavations, handling,
re-handling, loading, unloading and leading, etc. all
labour and material as a complete job. Removal of
Earth (all kinds of soils)/ROCKS, BOULDERS
including mud/slush, slipped earth in catch water
drains, side drains, over berms in cutting, water way
of bridges, over coping of toe/breast/retaining walls
etc. including crossing of nallah, railway tracks,
making/repairing approach roads if required, all
lead, lift, ascent, descents, or any other obstruction.
Earth spoils to be dumped outside the cutting or
railway embankments as per direction of Engineer in
charge
Turfing / planting, including all lead and lift, and
watering as required until properly rooted, with. Note
- Initially payment of only 40% will be made. Balance
60% will be paid only after 3 months of maintenance
period if the turfing is properly rooted.
8 014051 Turfing with sods, 10cm thick and 20 cm square 100 Sqm 1400.00 10076.10 141065.40
closely laid
9 014130 Supplying and laying of Woven Geotextile made Sqm 1300.00 120.38 156494.00
from polypropylene multifilament yarn, having
minimum mass of 220 GSM & ultimate tensile
strength of 40 kN/m with puncture resistance of 600
N and apparent opening size of 150 microns and
laying at interface of sub-grade and blanketing layer,
including transportation, contractor's labour, lead
and lift complete as per directions of Engineer-in-
charge
Total 181886547.40
Schedule B-Execution of NFUSSOR-2010 Items of works as per Annexure-II andanyother Items of works of
Schedule
Chapter-II of NFUSSOR2010.
Annexure-II (Hiring of Multiutility Vehicle etc.) and any other Items of works of Chapter-II of
Item- 2 N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-II, but required for successful completion of
work.
S No. Item Description of Item Unit Qty Rate Amount
No
1 021430 Hiring and operating Multi-Utility vehicle of loading Each/month 24.00 34827.81 835867.44
capacity one MT with sitting capacity of 4/6 persons,
4 strokes, 4 cylinders engine, factory-built metal
body, cargo box type or passenger cabin type or
both (with 24 hours availability), including cost of
fuel, lubricants, major/minor repairs, salary of driver,
toll tax, all other tax complete, operation and
maintenance including running upto 1200 km in a
month. The vehicle shall run on pucca, kutcha road
and along the track. The contractor shall arrange
road permit for vehicles for all the States of
operation, as per instructions of engineer in-charge
and vehicle shall not be more than three years old.
2 021440 Extra over item no. 021430 for every additional km Kilometre 7200.00 28.97 208584.00
or part thereof over 1200 km in a month.
Total 1044451.44
Schedule C-Execution of NFUSSOR-2010 Items of works as per Annexure-III andanyother Items of works of
Schedule
Chapter-IV of NFUSSOR-2010.
Annexure-III (Curing Compound & Supply of Reinforcement etc ) and any other Items of works of Chapter-IV of
Item- 3 N.F.Railways USSOR-2010, which are not covered in Annexure-III,but required for successful completion of
work.
S No. Item Description of Item Unit Qty Rate Amount
No
6 192040 Providing and laying in position machine mixed, cum 10089.00 2888.42 29141269.38
machine vibrated and machine batched Design Mix
Cement Concrete M35 grade (Cast - in Situ) using
20 mm graded crushed stone aggregate and coarse
sand of approved quality in RCC raft foundation &
Pile cap including finishing, Using Admixtures in
recommended proportions ( as per IS 9103), if
approved in Mix design to accelerate or retard
setting of concrete and/or improve workability
without impairing strength and durability complete as
p e r specifications and direction of the Engineer in
charge. Payment for cement, reinforcement and
shuttering shall be paid extra
7 192050 Providing and laying in position machine mixed, cum 940.00 2888.42 2715114.80
machine vibrated and machine batched Design Mix
Cement Concrete M20 grade (Cast - in Situ) using
20 mm graded crushed stone aggregate and coarse
sand of approved quality in Abutment, pier, wing
walls and return walls of Mass cement concrete
above RCC raft Including finishing complete as per
specifications and direction of the Engineer in
charge. Payment for cement, reinforcement and
shuttering shall be paid extra
Providing and laying in position machine mixed,
machine vibrated and machine batched Design Mix
Cement Concrete M35 grade (Cast - in Situ) using
20 mm graded crushed stone aggregate and coarse
sand of approved quality for the following Reinforced
cement concrete structural elements up to height of
10 M from foundation top level, including finishing,
Using Admixtures in recommended proportions ( as
per IS 9103), if approved in Mix design to accelerate
or retard setting of concrete and/or improve
workability without impairing strength and durability
complete as per specifications and direction of the
Engineer in charge. Payment for cement,
reinforcement and shuttering shall be paid extra
8 192062 Wing wall and Return wall cum 2807.00 3177.26 8918568.82
Providing, Driving and installing Bored cast in situ
Reinforced Cement Concrete piles of specified
diameter and length below pile cap in M- 35 grade
Design Mix Cement Concrete , using 20 mm graded
crushed stone aggregate and coarse sand of
approved quality, to carry a safe working load not
less than specified, excluding the cost of casing pipe
but including the cost of shoe and length of pile to be
embedded in pile cap etc complete, concreting by
m a ch in e batching, machine mixing, scaffolding,
using Admixture in recommended proportion( as per
IS 9103), if approved in design Mix, placing with
tremie pipe, chipping off of pile top to remove
laitance concrete above cut off level etc, pumping
and bailing out water, with all labour material
complete including crossing of tracks if required, as
per approved drawing, specification and direction of
the Engineer in charge. Length of the pile for
payment shall be measured Up to the bottom of pile
cap excluding the mud mat. Payment for cement,
casing pipe & reinforcement shall be paid extra
9 192072 1200mm diameter Metre 1485.00 10059.76 14938743.60
10 192075 600mm diameter Metre 210.00 3433.19 720969.90
11 192080 Providing, fabricating and installing of casing pipe for MT 154.00 58021.44 8935301.76
bored piles for all diameters with specified thickness
of steel plate including all labour, materials, pumping
and bailing out water where ever required, complete
as per technical specifications as directed by
Engineer in charge. This will include the weight of
plate only and no cognizance will be given for the
fittings i.e. rivets and welding etc.
12 194010 Providing and laying in position machine mixed, cum 366.00 2888.42 1057161.72
machine vibrated and machine batched Design Mix
Cement Concrete M35 grade (Cast - in Situ) In
Bottom/top slab, side walls, toe wall and sumps
haunch filling head walls or any other component
using 20 mm graded crushed stone aggregate and
coarse sand of approved quality of cast-in-situ RCC
box of size upto 5 M (bigger inside dimension)
including finishing, Admixtures in recommended
proportions (as per IS 9103), if approved in Mix
design, to accelerate, retard setting of concrete,
improve workability without impairing strength and
durability, complete as per drawings and technical
specifications as directed by Engineer in charge.
Payment for cement, reinforcement and shuttering
shall be paid extra
Centring and shuttering including strutting, propping
etc. and removal of form for :
13 195031 RCC raft foundation & Pile cap Sqm 11023.00 161.10 1775805.30
14 195032 Abutment, pier, wing walls and return walls Sqm 14379.00 261.30 3757232.70
Total 80017548.23
Schedule F-Execution of NFUSSOR-2010 Items of works as per Annexure-VI andanyother Items of works of
Schedule
Chapter-XXII of NFUSSOR-2010.
Annexure-VI (Miscleneous Concerete work etc.) and any other Items of works of Chapter-XXII of
Item- 6 N.F.RailwaysUSSOR- 2010, which are not covered in Annexure-VI, but required for successful completion of
work
S No. Item Description of Item Unit Qty Rate Amount
No
1 221030 Supplying galvanized wire net trungers made from 4 Sqm 3264.00 389.29 1270642.56
mm galvanised steel wire @ 32 kg per 10 sqm
having minimum tensile strength of 300 Mpa
conforming to IS:280 and galvanizing coating
conforming to IS:4826, woven into mesh with double
twist, mesh size not exceeding 100 x 100 mm
2 221040 Providing and laying of apron with cement concrete cum 6868.00 2739.87 18817427.16
blocks cast in-situ and made with nominal mix of
1:2:4 with a minimum cement content of 250
kg/cum. Payment to be made for blocks only. Cost of
cement and shuttering to be paid extra
3 221070 Providing and laying Filter material As Per RDSO cum 490.00 2428.62 1190023.80
Specifications underneath pitching in slopes
complete as per drawing and Technical specification
4 222020 300 mm thick (average) Dry stone flooring with cum 126.00 1326.54 167144.04
boulders of not less than 35 kg each in weight , hand
packed with surface levelled off to the correct
section with hammer dressing as necessary on the
ground including filling the gaps with quarry spalls
and ordinary sand complete including the cost of
supply of all materials, labour, lead, lift, tools, plants,
crossing of tracks and the like as per drawing and
technical specification as directed by Engineer
Sealing of cracks/porous concrete by injection
process through nipples/Grouting complete as per
Technical Specification
5 222071 Neat Cement Grout with 20 % anti shrinkage Kg 750.00 167.91 125932.50
compound w.r.t. cement
14 222320 Supplying & fixing of Erosion Control Geomat (for Sqm 7500.00 289.91 2174325.00
surfacial erosion control) consisting of 2 layers of
polymeric netting, having aperture size of 20mm x
20mm and a middle layer of coir as per
Specifications. Max. width of rolls/each composite
mat shall be 5m. Work includes dressing of slopes to
proper profile & removing loose rubbles, muck &
leading to the point as directed by engineer-
incharge; supply & spreading of good earth/soil
material on slope/berm portion etc. to proper profile
for laying of Geomat anchoring in top anchor trench;
seaming of adjacent panels of Geomat with HDPE
Twine; fabrication & fixing of U-pin on slope/berms
including top of cutting for anchoring of Geomat as
per approved scheme and providing of grass sods
and placing over Geomat so as to completely cover
it, including watering for 2 weeks with all labour,
tools & materials alongwith lead & lift etc. complete
Total 35338913.02
Schedule G-Execution of NFUSSOR-2010 Items of works as per Annexure-VII andanyother Items of works of
Schedule
Chapter-XXV of NFUSSOR-2010.
Annexure-VII (Supply of Materials etc.) and any other Items of works of ChapterXXV ofN.F.Railways USSOR-
Item- 7
2010, which are not covered in Annexure-VII, but required for successful completion of work.
S No. Item Description of Item Unit Qty Rate Amount
No
1 252030 Ordinary Portland Cement grade-53 Grade MT 394.00 7590.00 2990460.00
2 252040 Ordinary Portland Cement grade-43 MT 37666.00 6532.00 246034312.00
3 253840 Mild steel plates 6 mm and above Quintal 306.15 5175.00 1584326.25
Total 250609098.25
Schedule Schedule H-Execution of NS Items of works as per Annexure-VIII
Item- 8 Annexure-VIII (Earthwork in Excavation/Cutting & filling for Cut & Cover tunnel.
S No. Item Description of Item Unit Qty Rate Amount
No
1 1 Earthwork in excavation where the tunnel is to be cum 89230.00 311.28 27775514.40
constructed adopting cut & cover method in all kind
of soils, rock requiring use of blasting and disposal
of surplus excavated spoils including
bailing/pumping out water including shoring &
shuttering as per direction of the Engineer in-charge.
Payment of earthwork in the stretch where the
tunnel is to be constructed adopting cut & cover
method shall be limited to maximum of width of cut &
cover box section and boulder backing etc. as per
drawing irrespective of fact whether earth is cut in
slopes and shoring & shuttering is done to retain
earth. Payment will be made as maximum width of
box section as given in approved drawing plus
boulder backing multiplied by average depth of cut
reckoned from the top up-to the bottom of box.
Total 27775514.40
Schedule Schedule I-Execution of NS Items of works as per Annexure-IX
Item- 9 Annexure-IX(UG Tunneling & Excavation )
S No. Item Description of Item Unit Qty Rate Amount
No
3 3 Supply, drilling, installation and grouting of SN type Each 2801.00 2688.00 7529088.00
rockbolts of the specified length Fy>= 200 KN (slope,
tunnel support & face bolts) as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.(iii)
Length 6 m
4 4 Supply, drilling, installation and grouting of SN type Each 199.00 4369.00 869431.00
rockbolts of the specified length Fy>= 200 KN (slope,
tunnel support & face bolts) as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.(iv)
Length 9 m
5 5 Supply, drilling and installation and grouting of self Each 597.00 5676.00 3388572.00
drilling bolts of the specified length, Fy>=200KN
(tunnel support & face bolt) as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.(i)
Length 4 m
6 6 Supply, drilling and installation and grouting of self Each 3000.00 7897.00 23691000.00
drilling bolts of the specified length, Fy>=200KN
(tunnel support & face bolt) as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.(ii)
Length 6 m
7 7 Supply, drilling and installation and grouting of self Each 384.00 11160.00 4285440.00
drilling bolts of the specified length, Fy>=200KN
(tunnel support & face bolt) as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.(iii)
Length 9 m
8 8 Supply, drilling and installation and grouting of self Each 280.00 7897.00 2211160.00
drilling bolts of the specified length, Fy>=230KN
(slopes) as per approved drawings & specification or
as directed by Engineer. The rate shall include costs
of all materials, labour, equipment, etc. required for
the complete job.(i) Length 6 m
9 9 Supply, drilling and installation and grouting of self Each 180.00 11160.00 2008800.00
drilling bolts of the specified length, Fy>=230KN
(slopes) as per approved drawings & specification or
as directed by Engineer. The rate shall include costs
of all materials, labour, equipment, etc. required for
the complete job.(ii) Length 9 m
10 10 Supply, drilling and installation and grouting of 76 Metre 1780.00 6025.00 10724500.00
mm outer dia self drilling bolts for pipe roof,
Fy>=1200KN of length of 15 m as per approved
drawings & specification or as directed by Engineer.
The rate shall include costs of all materials, labour,
equipment, etc. required for the complete job.
11 11 Supply, drilling and installation and grouting of Each 1872.00 1930.00 3612960.00
forepoling as per approved drawings & specification
or as directed by Engineer. The rate shall include
costs of all materials, labour, equipment, etc.
required for the complete job.(i) Self-drilling bolts,
Fy> = 200 KN
12 12 Supply, drilling and installation and grouting of Each 150.00 507.00 76050.00
forepoling as per approved drawings & specification
or as directed by Engineer. The rate shall include
costs of all materials, labour, equipment, etc.
required for the complete job.(ii) Steel Pipes, 40 mm
dia, wall thickness 4 mm
13 13 Fabrication and erection of lattice girders and all MT 200.00 10380.00 2076000.00
accessories (such as forepoling, supports, etc)
including all lead, lift, wastage, storing, drilling holes,
fixing in phases etc. and installation of accessories
for joining the lattice girder segments as per
approved workshop drawings of contractor &
specification or as directed by Engineer. The rate
shall include costs of all materials, labour,
equipment, etc. required for the complete job
including additional cost for enlargement of top
heading footing.
14 14 Placing of 150 x 150 x 6 mm welded wire fabric of MT 67.00 2943.00 197181.00
Fe 500 as reinforcement in primary lining & Inner
lining as per approved drawings & specification or as
directed by Engineer. The rate shall include all
labour, materials, cost of pins, hook, lead, lift,
handling, wastage complete with contractor's own
equipment for the complete job.
15 15 Fixing Lining Stress Controllers (LSC) as per MT 3.00 3192.00 9576.00
approved drawings & specification. The rate shall
include costs of all materials, labour, equipment, etc.
required for the complete job.
16 16 Fabrication, leading and erection in position MT 862.00 7538.00 6497756.00
permanent tunnel steel supports as per design
/approved drawing including fore poling, cutting,
drilling, welding/ riveting, cold/hot blending,
threading, fixing /removing form work, leveling,
aligning, fixing in position with providing all
accessories such as all nuts, bolts, washers, tie rod,
gusset/wall plates, base plate etc.and providing
timber struts, pre-stressing by blocking against
rock/soil surface etc. complete including all leads
and lifts from fabrication yard to erection site as
directed by the Engineer. Calculation of weight for
payment under this item will include all structural
steel, tie rods, wall plates,base plate,nuts
bolts,washers, gusset etc. as per approved drawing
as all the accessories are part of permanent steel
support in the tunnel. NOTE : Supply of structural
steel and component like tie rods, bolt & nuts, MS
Plates etc. will be paid by weight under seperate
item.
17 17 Providing and fixing S2 ZIP anchor for slope Each 250.00 1779.23 444807.50
protection and as per site requirement with
contractors materials and other bonding
material,including all lead and
lift,fixing,wastage/curig etc complete as per
specification and as directed by Engineer in charge.
18 18 Providing and fixing S8 anchor with 3M of stainless Each 150.00 26395.27 3959290.50
steel rod and load plate for slope/cut profile
protection and as per site requirement with
contractors materials and other bonding
material,including all lead and
lift,fixing,wastage/curig etc complete as per
specification and as directed by Engineer in charge
19 19 Extra over item No 1(i) to (xi) of shedule:K for supply MT 175.00 82309.00 14404075.00
and mixing of steel Fiber double end hooked loose
Steel Fibers of circular cross sectionhaving diameter
of 0.75mm & aspect ration equal to 49 conforming to
EC-certificate of conformity as per EN 14889 &
Tensile strength more than 1100 MPa & Ultimate
Strain less than 4% as per specification and as
directed by
Total 89199013.00
Schedule Schedule K-Execution of NS Items of works as per Annexure-XI
4. ELIGIBILITY CONDITIONS
The tenderer must have successfully completed any of the following during last 07
1.1 No No Not Allowed
(seven) years, ending last day of month previous to the one in which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised
1.1.1 No No Not Allowed
value of the tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised
1.1.2 No No Not Allowed
value of the tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of
1.1.3 No No Not Allowed
the tender.
In case of composite works tenderer must have successfully completed any of the
1.2 following during last 07 (seven) years, ending last day of month previous to the one in No No Not Allowed
which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised
1.2.1 No No Not Allowed
value of each component of tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised
1.2.2 No No Not Allowed
value of each component of tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of
1.2.3 No No Not Allowed
each component of tender.
Note:Work experience certificate from private individual shall not be considered.
However, in addition to work experience certificates issued by any Govt. Organisation,
work experience certificate issued by Public listed company having average annual
turnover o f R s 5 0 0 c rore a n d abov e i n l as t 3 financial years excluding the current
financial year, listed on National Stock Exchange or Bombay Stock Exchange,
incorporated/registered atleast 5 years prior to the date of opening of tender, shall also
1.2.4 be considered provided the work experience certificate has been issued by a person No No Not Allowed
authorized by the Public listed company to issue such certificates. In c as e tenderer
submits work experience certificate issued by public listed company, the tenderer shall
also submit along with work experience certificate, the relevant copy of work order, bill of
quantities, bill wise details of payment received duly certified by Chartered Accountant,
TDS certificates for all payments received and copy of final/last bill paid by company in
support of above work experience certificate
In case, the final bill of similar nature of work has not been passed and final
measurements have not been recorded, the paid amount including statutory deduction is
to be considered.If final measurements have been recorded and work has been
completed with negative variation, then also the paid amount including statutory
1.2.5 No No Not Allowed
deduction is to be considered.However, if final measurements have been recorded and
work has been completed with positive variation but variation has not been sanctioned,
original agreement value or last sanctioned agreement value which: ever is lower should
be considered for judging eligibility.
The total value of similar nature of work completed during the qualifying period and not
1.3 No No Not Allowed
the payments received within qualifying period alone, should be considered.
1.4 Defination of Similar Work :- Any under-ground Tunnel/caverns works. No No Not Allowed
5. COMPLIANCE
Commercial-Compliance
General Instructions
(a)(i) Before submitting a tender, the tenderer will be deemed to have satisfied
himself by actual inspection of the sit e and locality o f t h e works, that all
conditions liable to be encountered during t h e execution o f t h e works are
25.1 taken in t o account and that t h e rates he enters in the tender fo r m s are No No Not Allowed
adequate and all inclusive t o accord with the provisions in Clause-37 o f the
Standard General Conditions o f Contract for the completion o f works t o the
entire satisfaction of the Engineer.
(ii) Tenderers will examine the various provisions o f The Central Goods and
Services T a x Act, 2017(CGST)/ Integrated Goods and Services T a x Act,
2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/
25.2 respective state's State Goods and Services Tax Act (SGST) also, as notified No No Not Allowed
by Central/State Govt & as amended from time t o time and applicable taxes
before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC)
likely to be availed by them is duly considered while quoting rates.
( i i i ) The successful t e n d e r e r who is liable t o be registered under
CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details
required under CGST/IGST/UTGST/SGST Act to railway immediately after the
25.3 No No Not Allowed
a wa r d o f contract, without w h i c h no payment s h a l l be released to the
contractor. T h e contractor shall be responsible f o r deposition o f applicable
GST to the concerned authority.
(iv)In case the successful tenderer is not liable t o be registered under
CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST
25.4 No No Not Allowed
from his/their bills under reverse charge mechanism (RCM) and deposit the
same to the concerned authority.
ELECTRONIC REVERSE AUCTION (e-RA) will be followed for tenders valued
26 No No Not Allowed
more than Rs. 50 Cr.
PRICE VARIATION clause is not applicable for tenders having value less than
27 No No Not Allowed
Rs. 5 Crores.
Special Conditions
Technical-Compliances
Undertakings
Custom
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
Designation : AXEN/con/Tender