Nigeria LNG Limited Rotating Equipment

Natural Gas Liquefaction Complex


Bonny Island, Nigeria

FORM No. PR 808-08-J6


CONSTRUCTION SUBC. No. ______________
QUALITY CONTROL SHEET: _____ o f ______
DIESEL ENGINE INSTALLATION PROCESS SHEET
ITEM NO. UNIT NO. SYSTEM NO.:

MANUFACTURER DESCRIPTION No.

SUBCONTRACTOR:

DESCRIPTION SIGNATURE & DATE


SUBCONTR. CONTRACTOR COMPANY
1 FOUNDATION COMPLETE, LEVEL & ACCEPTED
DIESEL ENGINE
DRIVEN EQUIPMENT
CONTROL PANELS
BATTERY RACKS
BATTERY CHARGER
2 ALL ANCHOR BOLTS TIGHT, INCLUDING SKID-MOUNTED
PIPING
3 ALL INSTRUMENTATION COMPLETE & CHECKED
4 ALL GAUGES CLEAR & FUNCTIONAL
5 ALL ELECTRICAL COMPLETE & CHECKED, INCLUDING
CONTROL PANELS
6 ALL VALVES IN PROPER POSITION & OPERATIONAL
7 COOLING WATER SYSTEM COMPLETE
8 *FUEL SYSTEM CLEANED & COMPLETE*
9 *LUBE SYSTEM CLEANED & COMPLETE*
10 ALL PIPING COMPLETE, CLEAN & CONNECTED WITH NO
OBJECTIONABLE LOADS OR
11 STRAINS ON THE FLANGES
12 INTAKE & EXHAUST FREE OF OBSTRUCTIONS &
PROPERLY INSTALLED
13 ALL FANS & BLOWERS, INCLUDING ENGINE ENCLOSE
BLOWER, INSTALLED COMPLETE & OPERATIONAL
14 LUBRICATION COMPLETE
15 ROTATION CHECKED AS REQUIRED
16 ALIGNMENT COMPLETE & RECORDED
17 BATTERY INSTALLATIONS COMPLETE PER
MANUFACTURER’S INSTRUCTIONS
18 BATTERY CHARGER OPERATIONAL
REMARKS :

* Advance notification to Contractor required


THE INSTALLATION OF THE ABOVE EQUIPMENT HAS BEEN SATISFACTORILY COMPLETED IN ACCORDANCE WITH THE
DRAWINGS & SPECIFICATIONS (PAINTING & INSULATION EXCEPTED).

SIGNED :
SUBCONTRACTOR NAME DATE:

SIGNED :
CONTRACTOR NAME DATE:

SIGNED :
COMPANY NAME DATE:

JP 1000 NLG
Attachment PR 808-08-J6 (08/03)