Sei sulla pagina 1di 1

PROJECT:

DWG- MF0202.03 THE NEW CAIRO MALL


FOOD COURT
FC08
DWG- MF0202.04
FOOD COURT
FC01

KEY PLAN NORTH

RETAIL SHOP
FOOD COURT SEATING FOOD COURT
R220 FOOD COURT
FC12 FC07
FC02

RETAIL SHOP HANDICAP TOILET

R219 226

FOOD COURT
F
FC03

SERVICE R. PUBLIC CORRIDOR


RETAIL SHOP 225 207
R218

GENERAL NOTES:

FEMALE CHANGING ROOM MALE CHANGING ROOM


PUBLIC TOILET (M)
218 216
224 PEST CONTROL CHEMICALS
222
FOOD COURT FOOD COURT FOOD COURT
FC04 FC05 FC06

PUBLIC TOILET (F) STORAGE STORAGE


STORAGE STORAGE STORAGE STORAGE STORAGE
223 215 214
213 212 211 210 209
FC. TRAY WASH CLEANER JANITOR OFFICE
FEMALE STAFF TOILET MALE STAFF TOILET
234 233
219 217

SERVICE CORRIDOR
206

ELEVATOR
ELEVATOR
EL04
EL03

STAIRCASE
ST04 NO. DATE MODIFICATIONS
R0 23-MAY-13 ISSUED FOR TENDER
C R1 17-MAR-14 ISSUED FOR CONSTRUCTION
ELECTRIC R.
221

A.H.U ROOM
220
CINEMA
CN06

REVISIONS:
B
OWNER:

STAIRCASE CAIRO COMPANY FOR


ST05
HOUSING &DEVELOPMENT

CONCEPT DESIGNER:

A MAIN CONSULTANT:

DRAWING TITLE:

MECHANICAL
SECOND FLOOR PLAN
PART 4
DWG- MF0202.01
DWG- MF0202.04

FIRE FIGHTING
DESIGNED BY:
ENG. A. ZAKI
CHECKED BY:
ENG. SAID NASSAR
APPROVED BY:
ENG. NAGUIB ZEIDAN
DATE DRAWN: PLOT DATE: PROJECT NO.
01-APRIL-13 17-MAR-14 998
SCALE: SIZE: REVISION:
1:100 A0 R1
DRAWING NUMBER:
14 15 16 17 17' 18 19 20 21 21' 22 23 24 25
MF0202.04

Potrebbero piacerti anche