Sei sulla pagina 1di 2

24x7 Powerline CUSTOMER CARE CENTRE/CORRESPONDENCE

BILL OF SUPPLY RESIDENTIAL ADDRESS/INTERNAL GRIEVANCE REDRESSAL CELL


(IGRC)
We’re
TUSHAR KANTI ROY
. QUARTER NO-3 BLOCK NO-I ,
19122 listening.
i)Tilak Nager, Road no-3, Chembur, Mumbai 400 089 Fax: 30092022
ii)Sakinaka Junction., Andheri-Kurla Road, Mumbai 400 072

TPS LANE -3 , L.G.S. COLONY GHATKOPAR (W For power SMS POWER <9 digit account no.> to
7065313030 from any mobile no.
www.adanielectricity.com
helpdesk.mumbaielectricity@adani.com
GHATKOPAR METRO STATION interruption,
Give us a missed call on 1800 532 9998 Join us on,
complaint or from your registered mobile no.
restoration
MUMBAI 400086 status Whatsapp POWER <9 digit account no.>
to 9594519122 from any mobile number.
Mobile No 99******30
Email Id ro********88@gmail.com Bill No. 100818518398 Bill Date 18-07-2020 Cycle No. 24
Connected Load in kW 1.97 Bill Distribution No. EAST/EZ1-POWAI/24/130/01/001/001 Type of Supply SINGLE
PAN PHASE
GSTIN

YOUR CURRENT CONSUMPTION


This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.

To update your email Id and mobile no.,call us on 19122


Tariff Meter Multiplying Energy consumption Energy Fixed
number Factor charge charge
(MF) Present Previous Consumption (`) (`)
ACCOUNT NO reading reading (Unit kWh)
LT I (B) 896284 1 1674.00 1477.00 197.00 760.45 110.00
152773029 8

BILL MONTH TOTAL 197 760.45 110.00

JUN-20 TRACK YOUR CONSUMPTION (UNITS) ● Tentative meter reading date for your JUL-20 bill is 12-
08-2020.
● MERC vide its practice direction dated 09.05.2020 has held
applicability of holding charge/carrying cost by AEML/consumer for
DUE DATE

IMPORTANT MESSAGE
JUL-19 56 excess payment/underbilling by consumer/AEML. The same shall be
credited/debited in your next bill. Refer our website for more details.
AUG-19 70
08.08.2020 https://www.adanielectricity.com/Important-Covid-19-Update
SEP-19 127
OCT-19 57
NOV-19 36
DEC-19 101
620 JAN-20 106
FEB-20 127
MAR-20 222
APR-20 222

DUE AMOUNT 197 13


MAY-20 222
JUN-20 JUN-19

` 1,400.00* Refer to Important Message

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` :11.80) on or before discount
date 25-07-2020 ` 1390.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` :17.75) after due
date 08.08.2020 ` 1420.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.

#Payable until one month after due date, there after


interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY ORDER NO. For Advertisement please contact on
CSD/183/2019/4980 dated 22.10.2019
info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:152773029

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

24/130/01
b/f :13.38Cr 001/001/S08
0152773029500001400080820200000142000000139025072020
Round Sum payable: ` 1400.00 Discounted Amount(Round sum): ` 1390.00 Amount after due date (Round sum): ` 1420.00
JUN-20 152773029 /5/ Due date: 08.08.2020 Discount date: 25-07-2020
HOW YOUR BILL WAS CALCULATED Rate `
0152773029500001400080820200000142000000139025072020

Electrical Energy ( HSN Code 27160000)


Fixed Charge 110.00
Wheeling charge 309.29
Regulatory asset charge(RAC)## 0.00
Energy Charge 760.45
Fuel Adjustment Charge (FAC)# 0.00
Government electricity duty 16.00 % 188.76
Maharashtra Govt. tax on sale of electricity 26.04 p/unit 51.30
Current month's bill amount (A) 1,419.80
Others 0.00
Delayed Payment Charge on previous month's bill 0.00
Digital Payment Disocunt 3.98 Cr
Interest on arrears 0.00
Adjustments 0.00
Net Other Charges in current bill (B) 3.98 Cr
Current Month charges (A+B) 1,415.82
Previous month's bill amount 4,265.94
Payment received upto 20.06.2020 4,250.00
Prompt Payment Discount 29.32
Net previous balance(C) 13.38 Cr
Total bill amount(A+B+C) 1,402.44
Amount deferred 0.00
#FAC is being included in your monthly charges in accordance with MERC (MYT 3rd Amendment) Regulations, 2014 dated 8th
May 2014. Please refer to “your tariff structure” below.##RAC are included in this bill as they continue to apply for consumption
till 31.03.2020.
For Correspondence Address kindly refer the Front Page Customer Care Centre address.
AEML CIN U74999GJ2008PLC107256

Adani House, 56, Shrimali Society, Nr. Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat 380009
Regd. Office : Adani Electricity Mumbai Ltd.

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2020)
WITH THIS BILL 1,400.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate Paise/unit

LT I (B):LT- `/month `/unit `/unit `/unit JUN-20


Residential
Your security deposit 160.00
0-100 70 2.90 1.57 0.00 0.00
(SD) with us
101-300 110 4.85 1.57 0.00 0.00
Your unpaid security 301-500 110 6.65 1.57 0.00 0.00
deposit (SD)
> 500(balance 135 7.80 1.57 0.00 0.00
units)
PAN AADCD0086F

Meter reading date 13-07-2020


*Above fixed charges are for single phase connections.Fixed charge of Rs 135 per month will be levied on residential consumers
Previous meter reading date 12-06-2020 availing 3 phase supply.Additional Fixed charge of Rs 135 per 10kW load or part thereof above 10kW load shall be payable.Temporary
supply consumers shall pay 1.5 times the Fixed Charges applicable for this category
As per Electricity Supply Code, you can also opt for your own meter
(adhering to BIS standards) Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per
Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018

NOTE Rs. 10/- discount per month if you opt for Paperless E-Bill. No hard copy will be
• To pay online, visit www.adanielectricity.com generated. Log on to our website (www.adanielectricity.com) for more details
GSTN

• Cash payment limited to `20,000 or bill amount whichever is lower


• Get 7% interest on VDS (reducing balance) *Interest on Security Deposit comprises SBI MCLR rate as on
1st April for one year + 150 Basis Points(8.55% + 1.50%).
If paying by cheque, please remember For FY 2019-20,it is 10.05%
27AADCD0086F1ZW

• Cheque payment subject to realization, any dishonored cheque will


- Result in payment of bills by DD for subsequent 6 months Power theft results in power tariff hike - Report them
- Attract a penal amount of `250 per bill Honest citizens bear the cost of power stolen by unauthorized elements.
If you spot an electrical theft, please report on 19122.

Consumer Grievance Redressal Forum (CGRF) • Running your refrigerator at optimum temperature can help reduce
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
Adani Electricity, 1st Floor, Devidas Lane,
ENERGY
CONSERVATION TIPS
energy wastage.
• Ensuring usage of solar powered lights for outdoor lighting.
• Replacing conventional lighting fixtures with energy efficient ones.
Off SVP Road, Near Devidas Lane Telephone
Exchange, Borivali West, Mumbai 400 103

T 3009 4247

E Consumerforum.Mumbaielectricity@adani.com PLEASE REMEMBER


W cgrf.adanielectricity.com Using electricity connection for purposes other than that provided for is a tariff violation and may lead to

disconnection/penal action as per law.

Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.

Please quote your account no.152773029 in all your correspondence.

------------------------------------------------------------------------------------------------------------------------------------

Potrebbero piacerti anche