Sei sulla pagina 1di 2

CPP-FRM-QC-042

SAUDI ARAMCO
Onshore Maintain Potential Program at NA1&NA2
Contract # 6600042362&6600042363
China Petroleum Pipeline
Engineering Co.,Ltd Survey Report
DESCRIPTION : TRUNKLINE SITE SURVEY REPORT Date : 04-05-2019
Reference Drawing No. : CA - 539266-001-0F1 Report No. : KRSN-W131-013
Location: KHURSANIYAH 131 TRUNKLINE AREA Sheet No. : 1 OF 1
Chainage As per drawing As per site
Ground Level
WATER
As per site ( Remarks
JOINT NO. KM. LEVEL Easting Northing Elevation ( FIRST LAYER ) Easting Northing Elevation (FIRST LAYER )
NGL)

START 0+297.32 3.4 3.60 323070.048 3011077.171 3.75 323070.045 3011077.168 3.74
Ap-3 0+305.32 3.4 3.60 323062.048 3011077.171 3.75 323062.047 3011077.174 3.76
start 0+352.10 3.4 3.60 323042.090 3011034.862 3.75 323042.088 3011034.863 3.75
camel cross 0+372.60 3.4 3.60 323033.345 3011016.321 3.75 323033.348 3011016.323 3.75
end 0+399.10 3.4 3.60 323022.039 3010992.354 3.75 323022.040 3010992.352 3.76
Ap-4 0+455.97 3.4 3.60 322997.775 3010940.915 3.75 322997.773 3010940.913 3.75
Ap-5 0+462.11 3.4 3.60 322992.222 3010943.534 3.75 322992.224 3010943.531 3.75
Ap-6 0+551.71 3.4 3.60 322962.02 3010904.19 3.75 322962.023 3010904.188 3.76
END 0+547.06 3.4 3.51 322933.953 3010925.681 3.66 322933.955 3010925.678 3.67

8 " TRUNCKLINE PIPE CENTRE LINE + 4.65 M


BOTTOM OF 8" TRUNCKLINE PIPE +4.54 M

TOP OF BERM + 4.04 M PPS - 2

TOP OF ROW + 3.90 M


SELECT FILL 300 MM THK

MARL FILL 300 MM THK


NGL + 3.60 M MARL FILL 150 MM THK NGL + 3.60 M

SURVEYOR CPP QC Inspector SAPMT


NAME
SIGN
DATE
CPP-FRM-QC-042