Contractor Categories and Enlistment Rules

a) Category of Contractors:

S.No. Class of Amount of work upto which contractor can tender


Contractor As per old instructions Revised instructions
dated 1/3.10.1997
1. Special Work costing more than Rs. Specified amount of Non
conventional type works such as
Class 1.00 Crore and of non
sewage treatment plants, water
conventional type such as treatment plants (Rapid sand
filtration) fire fighting, OHSR, Tube
sewage treatment plants,
well, Air conditioning, Electrical &
fire fighting etc. requiring Mechanical works etc. requiring
specialized technical skill and of
specialized technical skill
unusual type
and of unusual type.
2. Class-I Any limit except the work Specified amount above Rs. 250
lacs except for the works mentioned
mentioned against Special
against special class.
Class.
3. Class-II Upto Rs. 50.00 lacs Specified amount upto Rs.250 lacs

4. Class-III Upto Rs. 20.00 lacs Specified amount upto Rs. 100 lacs

5. Class-IV Upto Rs. 5.00 lacs Specified amount upto Rs. 30 lacs

6. Class-V Upto Rs. 1.00 lacs Specified amount upto Rs. 10 lacs
-2-

b) Qualification for Enlistment:

S. No. Class of Qualification as per


Contractor Instruction dated Revised instructions
1/3.10.1997
1. Special The agency should have The agency should have executed
Class executed satisfactorily satisfactorily one work amounting
works costing more than to 80% of specified amount of
Rs. 1.00 Crore and of non- enlistment or three works each
conventional type required amounting to more than 50% of
specialized technical skill specified amount of enlistment, of
and of unusual type. non-conventional type requiring
specialized technical skill and of
unusual type during the last three
years.
2. Class-I The agency should have The agency should have executed
executed satisfactorily five satisfactorily three works of total
works costing more than Rs amount more than specified
30 lacs each or three works amount of enlistment or five works
costing more than Rs. 50 costing more than Rs 100
lacs each or above during lacs each during the last three
the last three years. years.

3. Class-II The agency should have The agency should have executed
executed satisfactorily five satisfactorily three works of total
works costing more than amount more than specified
Rs. 10.00 lacs each during amount of enlistment during the
the last three years. last three years.
4. Class-III The agency should have The agency should have executed
executed satisfactorily five satisfactorily three works costing
works costing more than more than specified amount of
Rs. 3.00 lacs each during enlistment during the last three
the last three years. years.
5. Class-IV The agency should have The agency should have executed
executed satisfactorily five satisfactorily three works costing
works costing more than more than specified amount of
Rs. 50,000 each during the enlistment during the last three
last three years. years.
6. Class-V Petty works Petty works

c) Powers to Enlist:

As per instructions dated Revised instructions


1/3.10.1997
3.0 The powers to make the enlistment 3.0 The powers to make the enlistment of
of contractors / Private and Public Limited contractors / Private and Public Limited
Companies in respect of Special Class , Companies in respect of Special Class ,
Class-I, Class-II, Class-III and Class-IV are Class-I, Class-II, Class-III and Class-IV
as under:- are as under:-
3.1 A committee consisting of the 3.1 A committee consisting of the
following officers has been constituted for following officers has been constituted for
examination of the application forms for examination of the application forms for
enlistment of contractors for special class enlistment of contractors for all class,
works class-I, class-II & class-III works.
-3-

Engineer-in-Chief, Haryana
Public Health Branch, Chd Chairman (i) Senior most Chief Engineer Chairman

(ii)Chief Engineer (Works) Member (ii) Second senior most Chief Engineer Member

(iii) Superintending Engineer (Planning) Member


(iii) Chief Engineer (YAP) Member Secy.

(iv)Executive Engineer (Planning) Member Secretary

3.2 A committee consisting of the following


officers has been constituted for examination of the Proposed to be deleted as included under
application forms for enlistment of contractors for above committee
Class-I and Class-II contractors :-
(i) Chief Engineer (YAP) Chairman
(ii) Superintending Engineer (Plg) Member
(iii) Superintending Engineer(Urban) Member
(iv) Executive Engineer(Plg.) Member Secy.

3.3 A committee consisting of the following 3.3 A committee consisting of the following
officers has been constituted for examination of officers has been constituted for examination
application forms for enlistment of Class-III of
contractors: application forms for enlistment of Class-IV
contractors:
(i)Superintending Engineer of Chairman
respective circle. (i)Superintending Engineer of
respective circle. Chairman
(ii) Two senior most Executive
Engineers of the Divisions (ii) Two senior most Executive
Falling under the concerned Engineers of the Divisions
Circle of superintendence. Member Falling under the concerned
Circle of superintendence. Member
(iii) Superintendent (working in
concerned circle) Member Secy. (iii) Superintendent (working in
concerned circle) Member Secy.

3.4 A committee consisting of the following


3.4 A committee consisting of the following officers has been constituted for examination of
officers has been constituted for examination of application forms for enlistment of Class-V
application forms for enlistment of Class-IV contractors:
contractors:
(i) Executive Engineer of
(i) Executive Engineer of respective Division
respective Division Chairman Chairman/Member
(ii) One Executive Engineer
(ii) Two senior most to be nominated by SE Chairman/Member
Sub-Divisional Engineer Member
(ii) One senior most
(iii) Deputy Superintendent Sub-Divisional Engineer Member
(working in respective
Division) Member Secy. (iii) Deputy Superintendent
(working in respective
Division) Member Secy.

Note: Senior among (i) and (ii) will act as


Chairman

Class-V contractors will be enlisted by each Proposed to be deleted as included under


respective Executive Engineer. above category
-4-
4.0 Jurisdiction for Enlistment

The contractor residing outside The contractor residing outside Haryana State shall
Haryana State shall apply for apply for enlistment/renewal of enlistment of the
enlistment/renewal of enlistment of the officers as given below:-
officers as given below:-
(a) Punjab, Himachal Pradesh
(a) Punjab, Himachal Pradesh and Chandigarh SE Ambala
and Chandigarh SE Ambala
(b) Uttar Pradesh SE Karnal
(b) Uttar Pradesh SE Karnal
( c) Delhi SE Rohtak
( c) Delhi SE Rohtak
(d) Rajasthan SE Hisar
(d) Rajasthan SE Hisar
(e) Any State other
(e) Any State other than above. SE Gurgaon
than above. SE Gurgaon

4.1 The respective contractors/ private 4.1 The respective contractors/ private or public
or public Limited Company desirous of Limited Company desirous of enlistment as Special
enlistment as Special Class , Class-I, Class , Class-I, Class-II and Class-III contractor
Class-II and Class-III contractor should should apply on the application for enlistment of
apply on the application for enlistment contractors prescribed in PWD Manual of Orders,
of contractors prescribed in PWD Appendix 7-C as modified from time to time, to the
Manual of Orders, Appendix 7-C as Superintending Engineer under whose jurisdiction
modified from time to time, to the the permanent address of the contractors/ Private or
Superintending Engineer under whose Public Limited Companies fall alongwith the
jurisdiction the permanent address of enlistment fee prescribed hereinafter.
the contractors/ Private or Public
Limited Companies fall alongwith the
enlistment fee prescribed hereinafter.
4.2 After examination of such 4.2 After examination of such applications the
applications the respective respective Superintending Engineers will send these
Superintending Engineers will send applications to the Member Secretary to the
these applications to the Member Committee.
Secretary to the Committee.
4.3 The Committee will meet after 4.3 The Committee will meet after every three
every three months to examine the months to examine the applications received for
applications received for enlistment enlistment and shall finally decide these cases.
and shall finally decide these cases.
4.4 The decision of the above 4.4 The decision of the above Committee shall be
Committee shall be communicated by communicated by the Member Secretary of the
the Member Secretary of the Committee to the concerned Superintending
Committee to the concerned Engineer who shall issue the necessary certificate of
Superintending Engineer who shall enlistment to the contractors / Private Limited
issue the necessary certificate of Companies. The necessary register of contractors
enlistment to the contractors / Private shall be maintained by the concerned
Limited Companies. The necessary Superintending Engineer. Similarly, for enlistment as
register of contractors shall be Class-IV and V contractors, the prospective
maintained by the concerned contractors desirous of enlistment should apply on
Superintending Engineer. Similarly , for the application for enlistment of contractors
enlistment as Class-IV and V prescribed in PWD Manual of Orders Appendix 7-C
contractors, the prospective contractors as modified from time to time, to the Executive
desirous of enlistment should apply on Engineer under whose jurisdiction the permanent
the application for enlistment of address of the contractors fall alongwith the
contractors prescribed in PWD Manual enlistment fee prescribed hereafter.
of Orders Appendix 7-C as modified
from time to time, to the Executive
Engineer under whose jurisdiction the
permanent address of the contractors
fall alongwith the enlistment fee
prescribed hereafter.
-5 -

5.0 Enlistment Fee


The enlistment fee under different Classes shall be as under:

S.No. Category of Rate of Remarks S.No. Category of Rate of Remarks


Contractors the fee Contractors the fee
prescribed prescribed
------------------------------------------------------------------ ----------------------------------------------------------------------
1. Special Class Rs. 5,000/- Renewal after 2 Yrs. 1. Special Class Rs. 25,000/- Renewal after 2 Yrs.
2. Class-I Rs. 5,000/- financial years 2. Class-I Rs. 25,000/- financial years
3. Class-II Rs. 4,000/- at a fee equal 3. Class-II Rs. 20,000/- at a fee equal
4. Class-III Rs. 3,000/- 50% of enlistment 4. Class-III Rs. 15,000/- 50% of enlistment
5. Class-IV Rs. 1,000/- fee. 5. Class-IV Rs. 5,000/- fee.
6. Class-V Rs. 500/- 6. Class-V Rs. 2,500/-

Action against the contractors for delay in completion of works:


Time is the essence of the contract agreement. It has been observed that most of
the works are not completed within the stipulated contract period and sometimes the works
are completed in more than the double of contract period leading to delayed benefits of the
project to the public / beneficiaries. This is because of the callous attitude of the contractors
as well as the officers towards the completion of work within time period. Moreover hardly
any action is initiated against the contractors for delay in completion of works & time
extension is granted on flimsy grounds . To check this menace of delay in completion of
works as well as to encourage timely completion of works, some actions other than penalty
clauses of contract agreement are proposed as under:-

(I) The enlistment of the contractor be suspended in case he does not


execute the agreement after acceptance of the tender. He shall be
debarred & suspended from participating in the re-tender of that work or in
future tenders also for a period of two years.

(II) The enlistment of the contractor be suspended in case he does not start
the work by the date of commencement as notified by the Engineer-in-
Charge except in cases where he is not at fault e.g. delay in handing over
the site etc. He shall be debarred and suspended from participating in the
re-tender of that work or in future tenders also for a period of two years.

(III) The enlistment of the contractor be suspended for three years in case
action under Clause 3-C of the agreement has been initiated against the
contractors.

(IV) The contractor be demoted to a lower class at the time or renewal of his
enlistment in case he has not been able to finish at least 75% of the works
awarded to him within the original contract time period except in cases
where he is not at fault e.g. delay in handing over the site, approval of
structural design, delay in supply of material to be given by the
Department, natural calamity etc. to be decided by the Engineer-in-charge.

(V) The action proposed at (i) , (ii), (iii) & (iv) regarding demotion, debarring/
suspension can be reviewed by competent authority as prescribed from
time to time.