INDUSTRIAL TRAINING REPORT
BANGI
2019
i
DECLARATION
I declare that all the parts of this report are the result of my own work except
for the quotations and references, the sources of which have been
acknowledged in the bibliography.
ii
APPROVAL
……………….…………………………... …………………………..
(FARA IZUAN FAREEZ BIN JAFFAR) Date
Company Supervisor
………………………………………. …………………………..
(MOHAMMAD JURAIDI BIN JAMAL) Date
University Supervisor
iii
ACKNOWLEDGEMENT
First and foremost, all praise is to Allah S.W.T for His blessing as helping me
to give guide and strength to keep calm and patient for through this amazing
Secondly, I would like to express my special gratitude to Mr. Lim Tow Seng
Fareez my company supervisor for instruct and give me opportunity for doing
the industrial training at OMRON. Also, to Mr. Nazif and Mr. Firdaus, who
all the staff in the company. Without their support, I never thought that I would
internship. Last but not least, I would like to give a big thanks to MARA for helping
me to continue my study, all the lecturers who have thought me in Universiti Kuala
Lumpur Malaysia France Institute. Only Allah S.W.T can repay for their kindness.
iv
ABSTRACT
Industrial Training, INTRA is one of the most important parts for a complete
learning session for the undergraduates. This is a prior preparation for the
undergraduates to join the industry. OMRON Malaysia Sdn. Bhd. is a
company that focusing in electronics production. During 6 months of the
Industrial Training, there are numerous of knowledge that has been gained
from the staffs of OMRON Malaysia Sdn. Bhd. As an intern I was given a
golden opportunity to try a lot of new thing. The tasks that related to
designing and assembly for G9TA Sub Assembly Machine and G2RS Coil
Terminal Insert where basic knowledge got from UniKL MFI can be apply
during this internship period. The conclusion and recommendation have been
discussed at the end of this report
v
CONTENTS
DECLARATION ii
APPROVAL iii
ACKNOWLEDGEMENT iv
ABSTRACT v
CONTENTS vi
LIST OF ABBREVIATION ix
CHAPTER 1: INTRODUCTION 1
1.1 OVERVIEW 1
2.3.1 Vision 8
2.4.2 Mission 8
2.4.3 Values 8
vi
CHAPTER 3: TECHNICAL SECTION 11
3.1 INTRODUCTION 11
3.3 DESIGNING 12
3.4 ASSEMBLY 14
4.1 CONCLUSION 24
4.2 RECOMMENDATION 24
BIBLIOGRAPHY 26
APPENDIX A 27
APPENDIX B 30
APPENDIX C 32
APPENDIX D 34
vii
LIST OF ILLUSTRATIONS
viii
LIST OF ABBREVIATION
2D Two-Dimensional
3D Three-Dimensional
AC Alternate Current
CMM Coordinate Measuring Machine
DC Direct Current
EMC Electronics and Mechanical Components
etc.
GD&T Geometric, Dimensioning and Tolerance
InTra Industrial Training
JIS Japanese Industrial Standard
MID-PED Manufacturing Innovation Department – Production Engineering
Division
mm Millimetre
NG Not Go
OMB OMRON Malaysia Sdn. Bhd.
OMCP OMRON Asia Pacific Pte. Ltd
OMI OMRON Manufacturing Indonesia
OSH Occupational Safety and Health
V Volts
ix
CHAPTER 1: INTRODUCTION
1.1 OVERVIEW
Industrial Training (InTra) is the work experience done during the program of
study that is applicable to professional development prior to graduation. InTra
refers to a program which aims to provide supervised training within a
specific timeframe. The duration of the industrial training is 24 weeks and for
this semester it starts on 15th of July 2019 and end on 27th of December
2019. This training can be carried out either in government organisations or
in the private sector. During the InTra, students will be given tasks by the
company and their performance will be assessed by the company supervisor.
There is also assessment by the lecturer from university where the lecturer
will visit the student’s internship place and the value of the student
performance based on the company supervisor comment and their daily
reports.
1
Apply technical knowledge and engineering methods to a real life
situations
2
Figure 1. 2 Location of Company
3
related to my course taking in university which is Machine Tools
Manufacturing that focus on designing, machining and assembly processes. I
have been reported duty under supervision of Mr. Fara Izuan Fareez is an
Engineer and Mechanical Designer. The task as intern is supporting team to
finish their work well.
4
1.6 MID – PED ORGANIZATION CHART
5
CHAPTER 2: COMPANY INFORMATION
6
2.2 COMPANY HISTORY
7
2.3 VISION, MISSION AND VALUES OF COMPANY
2.3.1 Vision
OMRON Principles represent our unchanging, unshakeable beliefs.
The OMRON Principles are the cornerstone of our decisions and
actions, they are what binds us together, and they are driving force
behind OMRON’s growth.
2.4.2 Mission
To improve lives and contribute to a better society
2.4.3 Values
• Innovation Driven by Social Needs
Be a pioneer in creating inspired solutions for the future
• Challenging Ourselves
Purse new challenges with passion and courage
• Respect for All
Act with integrity and encourage everyone’s potential
8
Figure 2. 2 OMB Main Product
9
• Complying with all applicable Occupational Safety and Health Act,
as well as regulation, guidelines, and codes of practices.
• To preserve a workplace with safe and healthy working
environment for the employees, and those affected by our
business.
• To provide employees with adequate training and necessary
resources relevant to safety and health.
• To do our best to reduce or eliminate and control any occupational,
safety and health risk.
• To promote safety and health awareness programs to employees.
• To communicate safety and health policy to employees and others
interested parties.
• To provide a platform for the employee and their representative for
consultation and participation in OSH programs.
10
CHAPTER 3: TECHNICAL SECTION
3.1 INTRODUCTION
Internship or most likely known as Industrial Training (INTRA) in UniKL is
compulsory for all undergraduate students for them to complete their
bachelor’s degree. The purpose of this training is to give students final
preparation before they graduate and join the industries. I chose OMRON
Malaysia Sdn. Bhd. for me to have my 24 weeks of INTRA. I learnt a lot
during my 24 weeks at OMRON Thus, this is the summary of my 24 weeks at
OMRON Malaysia Sdn. Bhd.
11
3.3 DESIGNING
Designing is one of the important elements I learn in UniKL especially in my
course that I apply during my internship since I involve in two (2) projects for
designing process which is:
a. G9TA Sub Assembly Machine
b. G2RS Coil Terminal Insert
Basically, OMRON is one of the Japanese companies, that all standard
units are based on Japanese Industrial Standard (JIS). In MID-PED, there
are three designer and support by two people from assembly team. For major
design, the project will be design by main designer that are start from concept
design, design review, 3D design, 2D drawing, bill of material list and timing
chart list. Usually support designer will assist designer for minor design and
2D drawing
12
Figure 3. 1 NG Unit Before Modification
13
Figure 3. 3 Index Plate 2D drawing
3.4 ASSEMBLY
Assembly process is a process after designing process and part received
from supplier. Figure below shows the process flow during assembly:
Part received
Check dimension
Check surface
roughness
3D design referance
Start assemble
(bottom to top)
14
3.4.1 Spool Supply Unit
Mr. Nazif as assembly leader has assign me to assembly spool supply station
which this station is the first station of machine and very important station
because spool cannot be transfer to the conveyor from bowl feeder if spool
supply unit does not assemble well. During this process, if the surface of the
part not smooth or their dimension is not follow to the drawing, the part need
to rework by own for simple modification but for critical part or precision part,
it need to send back to supplier to rework it.
15
3.4.2 Platen Jig
After finish spool supply unit assembly, I have been giving a task to assemble
platen jig which this jig is self-align jig for X-axis and Y-axis. Platen jig is a
component to hold spool during to terminal insert process along 8 terminals.
Jig is one of the units that must precise and the component at jig must be
tighten very well because this platen jig will be moving on the conveyor that
vibrate. Most of the fastener on the jig is tight using Loctite 243 and Loctite
640 to seal all fasteners with medium bond strength.
16
Figure 3. 9 Platen Jig Assembly (Complete Unit)
17
Figure 3. 11 Press SLSR (80% Progress)
18
Figure 3. 14 Pin at Press Unit
19
Figure 3. 16 Tubing for Press Unit
20
Figure 3. 18 Platen Jig for Checking
21
3.6 MACHINE WIRING
To complete my task during industrial training period, I also got an
opportunity to learn and do some basic machine wiring. Basically all electrical
panels has been done by supplier but the electrical layout is make by
Mr.Ashraf as electrical leader. Mr. Ashraf has given me task to prepare wiring
for bowl feeder that need to connect from electrical panel with bowl feeder
unit. G2RS Coil Terminal Insert machine is using 24V AC/DC. To ease the
wiring work, wire label is used to label the wire either it is Neutral, Live, and
Ground. Both end cable jacket needs to be stripped and use cable string to
avoid stripped wire inside damage. Electrical wire crimp connector is use
before connecting into pin plug male or female connector.
22
Figure 3. 22 Wire Labelling
23
CHAPTER 4: CONCLUSION AND RECOMMENDATION
4.1 CONCLUSION
After going through industrial training for 24 weeks, a lot of experience,
knowledge and exposure that have been obtained. All the exposure was self-
awakening for me to boost my self-confidence to enter the real working
environment. I got a lot of skill that useful and related to mechanical and
manufacturing fields. These skills really motivate me to success when enter
the real world of work.
Training is a compliment to the theory that has been learnt. This is
clearly the concept of science and charity where they have learned without
practice will be lost and will not give anything. I also found that the knowledge
that I need when enter the industry is not only the technical related
knowledge, but also the self-confidence, communication skills and also work
ethics that importance.
4.2 RECOMMENDATION
OMRON is a global company specialise in electronics field, but that does not
mean OMRON has no weakness. As an industry trainee at OMRON, I would
like to suggest that 5S practice enforcement is more practical. This is
because; most of the equipment is not placed in the tool drawer correctly
according to labelling.
24
Figure 4. 1 Tools/ Equipment Not Placing at Right Place
25
BIBLIOGRAPHY
Igaki, Tsutomo; Somekawa, Satomi; Yasui, Kazunori; Iida, Kisho; Chishiro, Ayumi;
Tsukimoto, Tomoyoshi; Fuse, M. (2019). OMRON Integrated Report 2019.
26
APPENDIX A
COMPANY LETTER OF INTERNSHIP ACCEPTANCE
27
APPENDIX B
REPORT DUTY FORM
30
APPENDIX C
COMPANY INDUSTRIAL TRAINEE ATTENDANCE
32
APPENDIX D
TECHNICAL INFORMATION
34
4 5 2D
1 2 3 6 7 3D
A 76.3 ±0.1 A
88
44 12 ±0.1
155 PCD
45°
0.05 A
B
0.05
28
B B
45°
SCALE 1 : 7
163.7 ±0.1
189
66.5
94
30°
60° 47 8-4x M5x0.8 THRU
500
44 44
C 35 35 C
+0.028
+0.013
8 F7
30
28
24
31.3
27.3
25.3
D D
9.8
6 x 6.5 THRU +0.028
AT PCD 155 8 F7 +0.013 THRU A +0.012
4 75.5 77.5 ±0.1 8-4x 4 H7 0 THRU
100 THRU
8-4x M4x0.7 THRU
8x B (1 : 2)
E E
1
APPLICATION QTY
MATERIAL A5052 SCALE
FINISH CLEAR ANODIZE 6µm 1:4
TOLERANCE DESIGNED CHECKED APPROVED INDEX PLATE
3RD
F IT14 9/2/2019 ANGLE
F
ROUGHNESS MID-PED
Refer to the
outside of
Refer to the
outside of SHEET
DRWG
NO. X010808A
12.5
[ UNIT : mm ] SYM DATE E/C CONTENTS E/C NO. SIGN NIZAM the frame the frame 1/1 DESIGNED FOR G2RS COIL TERM INSERT- INDEX TABLE
DRAWN ADAM A3
3 4
1 2 5 6
4x 3.4 THRU
6.5 3
A (BACK SIDE) A
+0.010
10 x 3 H7 0 THRU
108 ±0.1
78 ±0.1
56 16
12 x M3x0.5 THRU 64 ±0.1
2 - C2
50 ±0.1
20 ±0.1
A
B B
20
38.5
26
55
20
17
12.5
7.5
7
C 14 30 40 30 C
6.5 15 15 15 25 15 15 15 6 0.05 A
128
8x 4.5 THRU
8 4
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 SCALE
X010803A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN NIZAM the frame the frame 1/1 DESIGNED FOR G2RS COIL TERM INSERT-LOADING INDEX
DRAWN ADAM A4
3 4
1 2 5 6
180
10 60 100 15 150
30 120 3
15
3
A A
107.5 ±0.1
50 45
105
125
15
3 x M4x0.7 THRU
(BOTH SIDE)
102
±0.1
388.5
102
A A NOTE:
C C
114.5
1) WELDING CONSTRUCTION
2) WELDING TOGETHER WITH RECTANGULAR
HOLLOW (100x75xt3)
3) MILLING PROCESS AFTER WELDING
95
15
30 75
10 100 135
A 180 1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 t16 , RACTANGULAR HOLLOW (75x100xt3) SCALE
X010786A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN NIZAM the frame the frame 1/1 DESIGNED FOR G2RS COIL TERM INSERT- LOADING INDEX
DRAWN ADAM A4
3 4
1 2 5 6
M3x0.5 6
68.5
2.5
THRU
A 9 A
NOTE 1 100 +0.022 5
10 40 40 4 F7 +0.010 THRU
3
+0.022
+0.010
80
±0.1
4 F7 45 3x 5.5 THRU
19.5 1
7
2 x (R)
24.9
30
51
8
2 x (R)
80
80
150 ±0.1NOTE 1
+0.2
+0.1
B B
10.2
4 x M4x0.7 THRU
8.5 THRU
58
170
THRU
30
+0.022
+0.010
2 x (R) 2-2x M4x0.7 8
(BOTH SIDE)
6 F7
C C
NOTE:
1) TOLERANCE VALUE IS APPLICABLE
+0.025 34.5 1 C20 AT DOWEL PIN HOLE ONLY
40 H7 0 THRU
13 74 +0.022
2x 5.5 THRU ALL 31 58 6 F7 +0.010 THRU
10 5.5
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 SCALE
X010771A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN CKW(NIZAM) the frame the frame 1/1 DESIGNED FOR G2RS COIL TERM INSERT - BRIDGE CONV
DRAWN ADAM A4
3 4
1 2 5 6
6
A A
4x 3.4 THRU
6.5 3
(FROM BOTTOM)
128 +0.010
10 x 3 H7 0 THRU
108 ±0.1
78.2 ±0.1
2 - C2 64 ±0.1
50 ±0.1
20 ±0.1
18
13
C 8x 4.5 THRU C
7
8 4
56 16
14 30 40 30
6.5 15 15 15 25 15 15 15
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 SCALE
X010554A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN NIZAM the frame the frame 1/1 DESIGNED FOR G2RS COIL TERM INSRT-PART LOCK MC2
DRAWN ADAM A4
3 4
1 2 5 6
A A
+0.022
8x 3.5 THRU
5 F7 +0.010 THRU 2 x R5 6.5 4
2 x M4x0.7 THRU
6 - C5
2 x (R)
20
B B
35
90
52
31
45
20
THRU
10.5 ±0.1
NOTE 1
15 50
7.5
+0.022
+0.010
23.5 1 10
31.5 ±0.1
5 F7
74 32 +0.010
C 80 20 2x 3 H7 0 THRU C
90 ±0.1 NOTE:
4x 5.5 THRU
10 5 110 1) TOLERANCE VALUE IS APPLICABLE AT
(BACK SIDE) DEWEL PIN HOLE ONLY
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL A5052 SCALE
X009984A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN FAREEZ the frame the frame 1/1 DESIGNED FOR G9TA SUB ASSY MC - UNLOADING UNIT
DRAWN ADAM ZUHAIRI A4
3 4
1 2 5 6
92
3 - C10 28 30
15 ±0.1
44 ±0.1
A 0.05 B A
0.1
65
0.05 A
R10 A
+0.012
75
283
B 4x 4 H7 0 THRU B
10 x 5.5 THRU
200
75
28
90
±0.1
39.5
53.5
35
B
C 70.5 7.5 C
65 100 8
6x 5.5 THRU 80 80 10
10 6 180
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 SCALE
X009976A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
12.5
outside of outside of
SYM DATE E/C CONTENTS E/C NO. SIGN FAREEZ the frame the frame 1/1 DESIGNED FOR G9TA SUB ASSY MC - UNLOADING UNIT
DRAWN ADAM ZUHAIRI A4
3 4
1 2 5 6
51
M4x0.7 15
A A
SCALE 1 : 2
R0.2max
R0.2max
31°
31° 31°
B 31° 4 ±0.015 B
+0.015
M4x0.7 15 10 H7 0 THRU
51
+0.1
01.8
57
53
24
53
C C
+0.1 +0.1
2.2 9 0 2.2 9 0
0.1 A 13.4 42.2 0.1 A
69
3
[ UNIT : mm ] APPLICATION QTY
MATERIAL SUS 304 SCALE
FINISH - 1:1.5
D TOLERANCE DESIGNED CHECKED APPROVED
Drive Pulley D
3RD
IT 14 12/07/19 ANGLE
X009213A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
12.5
outside of outside of
SYM DATE E/C CONTENTS E/C NO. SIGN CKW(NIZAM) the frame the frame 1/1 DESIGNED FOR G2RS Coil Terminal Insert - Bridge Conv
DRAWN ADAM A4
3 4
1 2 5 6
A 0.03 A A
24.5
13 ±0.1
20.8
24.8
A
R0.2 max.
2x 3.5 THRU +0.010
8 7 2x 3 H7 0 THRU
4 15
B 23 B
8
5 13 4x(R)
6
4.5 4.5
6
0.05 B
33
21
C C
15
6
B
1
[ UNIT : mm ] APPLICATION QTY
MATERIAL SS400 SCALE
X008978A
Refer to the Refer to the DRWG
ROUGHNESS MID-PED SHEET NO.
outside of outside of
12.5
SYM DATE E/C CONTENTS E/C NO. SIGN FAREEZ the frame the frame 1/1 DESIGNED FOR G9TA SUB ASSY MC - MOVING BLOCK
DRAWN ADAM A4
NO INFOPOINT
A X009621 ELB MOUNT BRACKET SPCC t3.0 ENP 3~5µm 1 NEW ADDED
SPEED CONTROLER
A X010985 SUS304 t2.0 - 5 NEW ADDED
BRACKET
A X010986 EMERGENCY BRACKET SUS304 t3.0 - 5 NEW ADDED
A X010987 APU MOUNT BRACKET SPCC t2.0 ENP 3~5µm 3 NEW ADDED
A X010994 MAGNET CATCHES MOUNT SPCC t3.2 ENP 3~5µm 16 NEW ADDED
ASSEMBLY DRAWING