PHASE 2 EXPANSION (STAGE 2B – SEPARATION & PROCESSING UNIT)
DAILY INSPECTION CHECKLIST FOR HEAVY MACHINERY/ EQUIPMENT MONTH : 1 2 3 4 5 6 7 8 9 10 11 12 YEAR : 2019/2020/2021

CRANE BACKHOE COMPACTOR PILING RIG OTHERS


TRUCK EXCAVATOR LOADER FORKLIFT (Please Specify) :

HEAVY MACHINERY/ EQUIPMENT OPERATOR ACKNOWLEDGE BY MAINTENANCE DEPT.


Equipment Type :
Equipment Owner :
Model Number / KVA :
Serial Number : (SIGNATURE) (SIGNATURE)
Manufacturer / Maker : Name : Name :
PMT/DOE Registration Number : Project / Department : Designation :
Result Column √ : Yes / Good X : Unaccepted. Not To Use NA : Not Applicable
DATE
INSPECTION ITEM REMARKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Engine/ Exhaust Condition
Engine/ Hydraulic/ Transmission Oil Level
Fuel/ Coolant Level
Drip Tay/ Spil recovery items
Body and Overhead Guard Condition
Cabin Condition (Door/Glass/Mirror/Panel)
Switch / Control Panel Condition
Tyres/ Track Condition
Light (Head/Break/Signal/Beacon/Warning
Wire Rope/ Hoist Control
Outriggers/ Stabilizer/ Floads Pads
Steering / Hydraulic Control Condition
Gauge/ Warning Indicator/ Function
Boom/Articulating Boom/Blade/Roller
Mount/Dump Component/Bucket Condition
Emergency Stop Function
Fan/ Drive Belt Condition
Rotary Component Lubrication
Swing Brake / Lock Function
Anti Two-Block Condition (Crane)
Load Chain/ Mast Assembly/ Anchor
Accessories Condition (Sling/Shackle/ Block)
Fire Extinguisher
Check By: (Sub-Contractor)
Operator/Machanical Personnel
Acknowledged By: HSE Personnel / Engine
Coordinator