KING SHAKA INTERNATIONAL AIRPORT

1m3 Storm-water Pollution Containment Chamber (Slops Tank)

Unit

1 Excavation in soft material not exceeding 2m deep m3


2 Soft rock excavation m3
3 Hard rock excavation m3
4 Back excavation of vertical sides of excavation in earth for working space m2
5 Extra over all excavations for carting away m3
6 Risk of collapse of excavations m2
7 Keeping excavations free of water item
8 Dewatering of seepage water No
9 Backfilling to trenches, holes, etc m3
10 Coarse river sand filling m3
11 Compaction of ground surface under floors m2
12 Surface blinding m3
13 20 Mpa surface bed on blinding m3
14 20 Mpa concrete slab m3
15 Finishing top surfaces of concrete smooth with a wood float m2
16 Finishing top surfaces of concrete smooth with a steel trowel m2
17 Formwork to sides of edges,etc m
18 Formwork to soffits of slabs m2
19 Boxing in formwork to form 450 x 600 openings No
20 Reinforcement to concrete ton
21 245 Mesh reinforcement m2
22 Brickwork of NFX bricks (14 MPa nominal compressive strength), one brick wall bagged m2
23 150mm Wide reinforcement built in horizontally m
24 Two coats "Sikagard " sealing agent on brickwalls m2
25 Internal plastering on walls m2
26 190mm HDPE pipes m
27 450x600 Heavy duty man hole cover No
Quantity Rate Amount

11.05 0
1.105 0
1.105 0
18.97 0
8.62 0
18.97 0
1 0
1 0
2.43 0
0.283 0
5.66 0
0.2264 0
1.42 0
0.65 0
2.95 0
1.7 0
7.7 0
1.7 0
2 0
0.126 0
11.33 0
13.23 0
38.91 0
11.1 0
11.1 0
0
2 0

0
KING SHAKA INTERNATIONAL AIRPORT
6m3 Storm-water Pollution Containment Chamber (Slops Tank)

Unit

1 Excavation in soft material not exceeding 2m deep m3


2 Soft rock excavation m3
3 Hard rock excavation m3
4 Back excavation of vertical sides of excavation in earth for working space m2
5 Extra over all excavations for carting away m3
6 Risk of collapse of excavations m2
7 Keeping excavations free of water item
8 Dewatering of seepage water No
9 Backfilling to trenches, holes, etc m3
10 Coarse river sand filling m3
11 Compaction of ground surface under floors m2
12 Surface blinding m3
13 20 Mpa surface bed on blinding m3
14 20 Mpa concrete slab m3
15 Finishing top surfaces of concrete smooth with a wood float m2
16 Finishing top surfaces of concrete smooth with a steel trowel m2
17 Formwork to sides of edges,etc m
18 Formwork to soffits of slabs m2
19 Boxing in formwork to form 450 x 600 openings No
20 Reinforcement to concrete ton
21 245 Mesh reinforcement m2
22 Brickwork of NFX bricks (14 MPa nominal compressive strength), one brick wall bagged m2
23 150mm Wide reinforcement built in horizontally m
24 Two coats "Sikagard " sealing agent on brickwalls m2
25 Internal plastering on walls m2
26 190mm HDPE pipes m
27 450x600 Heavy duty man hole cover No
Quantity Rate Amount

26.99 0
2.699 0
2.699 0
29.24 0
20.62 0
29.24 0
1 0
1 0
6.37 0
0.692 0
13.84 0
0.5536 0
3.46 0
2.65 0
14.38 0
6.85 0
14 0
6.31 0
2 0
0.593 0
27 0
21.12 0
62.12 0
20.55 0
20.55 0
0