EVALUATION OF MINIMUM WALL THICKNESS CALCULATION ON PIPE/TUBE

CDGT Km 125, Duri HRSG # 02


t = P D / ( 2 SE + 2yP ) + C
Thickness Calculation Based on ASME Sect. I Par. PG. 27 : No. List of Material N. S.
P.D 1. Pipe SA 53 Gr.B Sch. XXS 6"
t-min = 2.S + P + 0,005 D + e 2. Pipe SA 53 Gr.B Sch. 80 3"
t-req = t-min + CA 3. Pipe SA 53 Gr.B Sch. 80 1,5"
4. Elbow 1800 SA 234 WPB Sch. 80 3"
t-req : Thickness Requirement (mm) 5. Elbow 1800 SA 234 WPB Sch. 80 1,5"
t-act : Actual Thickness (mm) 6. Elbow 900 SA 234 WPB Sch. 80 3"
t-min : Minimum Thickness (mm) 7. Elbow 900 SA 234 WPB Sch. 80 1,5"
P : Maximum Allowable Working Pressure (psig)
D : Outside Diameter Pipe / Tube (inch) MAWP (psig) 1300 Maximum Allowable Stress Value :
S : Maximum Allowable Stress Values (psi) T operating (°F) 0-650 > at 650°F S = 15000 psi
e : Thickness Factor For Expanded Tube Ends P design (psig) 1600
CA : Corrosion Allowance = 1/16 inch (1,58 mm) T design (°F) 700
tm : Mill Tollerance = 12.5 %

ECONOMIZER TUBES t-act (mm) tm P D S e CA t-min (mm) t-req (mm) Client Spect. Status Remark
1,5" Pipe / Tube 3,08 0.125 1300 1.900 15000 0.00 0.0625 2.246 3.833 3.90 Rejected Manhole VI Front Pipe 1 no. 01, 40, 43.
1,5" Fitting 4,04 0.125 1300 1.900 15000 0.00 0.0625 2.246 3.833 3.90 Accepted
6" Header 20,21 0.125 1300 6.630 15000 0.00 0.0625 7.836 9.424 - Accepted

EVAPORATOR TUBES t-act (mm) tm P D S e CA t-min (mm) t-req (mm) Client Spect. Status Remark
1,5" Pipe / Tube 4,33 0.125 1300 1.900 15000 0.00 0.0625 2.246 3.833 3.90 Accepted
1,5" Fitting 4,79 0.125 1300 1.900 15000 0.00 0.0625 2.246 3.833 3.90 Accepted
3" Pipe / Tube 7,02 0.125 1300 3.500 15000 0.00 0.0625 4.137 5.724 - Accepted
3" Fitting 9,19 0.125 1300 3.500 15000 0.00 0.0625 4.137 5.724 - Accepted

Disetujui oleh, Disahkan oleh,


Disiapkan oleh, AK3 PU & BT Pegawai Pengawas Ketenagakerjaan
QA / QC Engineer Site Manager

Yandri Muhammad Reza, ST Agustiawirman, ST