GLOBALFOUNDRIES

AD-01 ABU DHABI SEMI CONDUCTOR PLANT


PRICING DOCUMENT

BILL NO. 1

GENERAL ITEMS

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 2

DESIGN OBLIGATIONS

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 3

PERMITTING

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 4

PROCUREMENT

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 5

PROJECT AND CONSTRUCTION MANAGEMENT

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 6

EHSE

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

BILL NO. 7

OVERHEADS AND PROFIT

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

MAIN SUMMARY

08/07/2020 486352354.xlsx
GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

GENERAL ITEMS

General Notes

A These General Items are applicable to the


whole of the Works. Each item, clause or
sub-clause must be individually priced.
The Tenderer shall not enter any lump
sum covering more than one or all items,
clauses or sub-clauses. Where any item,
clause or sub-clause of the Preliminaries
has not been priced, it will be deemed that
the value of such item, clause or sub-clause
is included in the rates for the Project item

Form of Tender

B The Contractor shall describe and list


below and price herein any obligation
contained in the Form of Tender
and Appendices for which he has not
allowed elsewhere and wishes to price
separately item

Instructions to Tenderers

C The Contractor shall describe and list


below and price herein any obligation
contained in the Instructions to
Tenderers for which he has not
allowed elsewhere and wishes to price
separately item

Performance Bond

D Allow for the provision of the Performance


Bond as detailed in the RFP item

Insurances

E Allow for the provision of the following


insurances as detailed in the RFP item

08/07/2020 Page B1.9


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)
To Collection US $

Form of Agreement

A The Contractor shall describe and list


below and price herein any obligation
the Form of Agreement for
which he has not
allowed elsewhere and wishes to price
separately item

Conditions of Contract

B The Contractor shall describe and list


below and price herein any obligation
contained in the General Conditions of
Contract for which he has not
allowed elsewhere and wishes to price
separately item

Novations

C Allow for taking over all responsibility for


and employing the followings design or
other consultants all as defined in
Volume I of the RFP

D Allow for Taking over responsibility for all


permitting obligation to be carried out by
ERM Consultancy Item

08/07/2020 Page B1.10


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

To Collection US $

Information Management

A The Contractor shall allow for all obligations


related to the Information Management
procedure detailed in Volumes I and II of
the RFP item

Document Control

B The Contractor shall allow for all obligations


related to the Document Control
procedure detailed in Volumes I and II of
the RFP item

Commisioning and Handover

C The Contractor shall allow for all obligations


related to the Commissioning and Handover
procedure detailed in Volumes I and II of
the RFP item

Master Planning Services

D The Contractor shall allow for all obligations


related to the Master Planning Services
detailed in Volumes I and II of
the RFP item

08/07/2020 Page B1.11


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

To Collection US $

Site Boundary Demarcation Certificate

A The Contractor shall obtain the


Site Boundary Demarcation Certificate
from the relevant section of the
Abu Dhabi Municipality
and shall agree the location
of the Site Boundary markers with
the Survey Section. The Owner
shall provide the Contractor with a copy
of the Demarcation Certificate and the
Contractor shall satisfy himself with regard
to the setting out of the site prior to
commencing any work. item

Site Survey and Setting Out

Topographical Survey

B As soon as the Contract has been signed,


the Contractor shall carry out a
survey of the site as detailed
the Project Specification item

C A permanent datum point must be


established during this operation to the
approval of the Engineer item

Geotechnical Survey

D Independent site investigations have been


carried out. Full copies of the report may be
inspected at the Engineer's office item

E The Contractor will be deemed to have


examined the reports, familiarised himself
with the site, satisfied himself as to the
nature of the ground and subsoil and
carried out any additional investigations
he considers necessary item

08/07/2020 Page B1.12


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

To Collection US $

Surveying Equipment

A The Contractor shall provide and keep


on site an adequate supply of surveying
instruments for the proper execution of
the Works as detailed in the
Project Specification
The instruments shall be in
proper adjustment and always kept in
perfect working order and they shall be
immediately available for us by the
Engineer whenever required, together
with all necessary assistance item

B The Contractor shall provide such labour


materials and transport the Engineer may
require to assist him carrying out surveys item

Contractor's Working Area

C It is solely the Contractor's


responsibility to arrange for the occupation
of any additional area of land with the
owners of such land and/or with the Abu Dhabi
Municipality and to pay all charges,
costs, etc., in connection therewith
which the Contractor considers necessary
for his working area item

D The Contractor will be held responsible


for any nuisance caused by his workmen
to grounds surrounding the site and
adjoining buildings, etc., and must make
good all such damage and settle any claims
for compensation at his own expense item

Staff and Labour Accommodation

E A Labour Camp is not permitted on Site,


watchmen and security staff only may be

08/07/2020 Page B1.13


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)
accommodated on site item

To Collection US $

Security

A The Contractor shall allow for protecting


the site and works from unauthorised entry item

B The Contractor shall control the labour


force to ensure that they do not cause a
nuisance or trespass on to adjacent
property item

C The Contractor shall provide all necessary


watching and lighting by day and by night
to protect the works from damage and to
protect all public and private traffic on
and in the vicinity of the works. Necessary
warning signs are to be provided item

D The Contractor shall take all necessary


precautions to prevent the out break of
fire and shall provide adequate fire fighting
appliances on site at strategic and clearly
defined points to the approval of the
Engineer. The Contractor shall also take
all necessary precautions against fire as
required by the relevant authorities and
the Insurance Company insuring the works. item

Establishment item

Maintenance Day

Removal Item

Transportation of Staff and Labour

E The Contractor shall provide transportation


of staff to and from site and
pay all costs in connection therewith item

08/07/2020 Page B1.14


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

To Collection US $

From Page No. B1.1

B1.2

B1.3

B1.4

B1.5

B1.6

08/07/2020 Page B1.15


GLOBALFOUNDRIES BILL NO. 1
AD-01 ABU DHABI SEMI CONDUCTOR PLANT GENERAL ITEMS
DESIGN - BUILD CONTRACT PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

TOTAL FOR BILL NO. 1 - GENERAL ITEMS CARRIED TO


MAIN SUMMARY - US $

08/07/2020 Page B1.16


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT DESIGN OBLIGATIONS
PRICING DOCUMENT

Item Ref. Description Quantity Unit Rate

DESIGN OBLIGATIONS

General Notes

The Contractor shall allow for the following


design obligations as detailed in Volume I
and II of the RFP and Contract document.
The Contractor shall provide a fully detailed
resource deployment schedule in accordance
with the proforma provided at Appendix B
to Volune III of the RFP including
all resources and assumed percentage
allocations for all design staff

Design Period

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Construction Period

E FAB Building Month

F CUB Month

G Office Building Month

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. Month

08/07/2020 Page B2.17


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT DESIGN OBLIGATIONS
PRICING DOCUMENT

Item Ref. Description Quantity Unit Rate


To Collection US $

08/07/2020 Page B2.18


BILL NO. 2
DESIGN OBLIGATIONS

Amount
(US $)

08/07/2020 Page B2.19


BILL NO. 2
DESIGN OBLIGATIONS

Amount
(US $)

08/07/2020 Page B2.20


GLOBALFOUNDRIES BILL NO. 3
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PERMITTING
PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

PERMITTING OBLIGATIONS

General Notes

The Contractor shall allow for all


obligations as detailed in Volume I
of the RFP
The Contractor shall provide a fully
detailed method statement and schedule
for the Permitting Obligations detailed in the
Volune I and II Of the Tender Documents
including the following

Design Period

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Construction Period

E FAB Building Month

F CUB Month

G Office Building Month

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. Month

To Collection US $
08/07/2020 Page B3.21
GLOBALFOUNDRIES BILL NO. 3
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PERMITTING
PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

08/07/2020 Page B3.22


GLOBALFOUNDRIES BILL NO. 4
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PROCUREMENT
PRICING DOCUMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

PROCUREMENT OBLIGATIONS

General Notes

The Contractor shall allow for all


obligations as detailed in Volume I and II
of the Tender and Contract Documents.
The Contractor shall provide a fully
detailed method statement and schedule
for the Permitting Obligations detailed in the
Volune I and II Of the RFP
including the following

Design Period

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Construction Period

E FAB Building Month

F CUB Month

G Office Building Month

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. Month

08/07/2020 Page B4.23


To Collection US $

08/07/2020 Page B4.24


GLOBALFOUNDRIES BILL NO. 5
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PROJECT AND CONSTRUCTION
PRICING DOCUMENT MANAGEMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

PROJECT MANAGEMENT AND CONSTRUCTION


MANAGEMENT OBLIGATIONS

General Notes

The Contractor shall allow for all


obligations as detailed in Volume I and II
of the RFP.
The Contractor shall provide a fully
detailed method statement and schedule
for the project and construction
management obligations detailed in
Volume I and II of the RFP
including all Cost Management, Change
management obligations detailed in
for the following facilities

Design Period

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Construction Period

E FAB Building Month

F CUB Month

G Office Building Month

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. Month

To Collection US $
08/07/2020 Page B5.25
GLOBALFOUNDRIES BILL NO. 5
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PROJECT AND CONSTRUCTION
PRICING DOCUMENT MANAGEMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

Construction Management - Pre-Contract

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Construction Period

E FAB Building Month

F CUB Month

G Office Building Month

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. Month

08/07/2020 Page B5.26


GLOBALFOUNDRIES BILL NO. 5
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PROJECT AND CONSTRUCTION
PRICING DOCUMENT MANAGEMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)

To Collection US $

From Page No.

B5.1

B5.2

08/07/2020 Page B5.27


GLOBALFOUNDRIES BILL NO. 5
AD-01 ABU DHABI SEMI CONDUCTOR PLANT PROJECT AND CONSTRUCTION
PRICING DOCUMENT MANAGEMENT

Amount
Item Ref. Description Quantity Unit Rate
(US $)
TOTAL FOR BILL NO. 5 - PROJECT AND CONSTRUCTION
MANAGEMENT TO MAIN SUMMARY - US $

08/07/2020 Page B5.28


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

Item Ref. Description Quantity Unit Rate

ENVIRONMENTAL, HEALTH AND SAFETY


REQUIREMENT

General Notes

The Contractor shall allow for all


obligations as detailed in Volume I
of this RFP
The Contractor shall provide a fully
detailed method statement and schedule
for the EHSE Obligations detailed in the
Volune I and II of the RFP

Allow for establishing and maintaining a


Project wide EHSE policy in full compliance
with the Owner's requirements all
as detailed in Volumes I and II
of the RFP

A Mobilisation item

B Maintenance day

C Removal item

08/07/2020 Page B6.29


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

Item Ref. Description Quantity Unit Rate


To Collection US $

08/07/2020 Page B6.30


BILL NO. 6
EHSE

Amount
(US $)

08/07/2020 Page B6.31


BILL NO. 6
EHSE

Amount
(US $)

08/07/2020 Page B6.32


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT DESIGN AND BUILD CONTRACTOR'S
PRICING DOCUMENT OVERHEAD AND PROFITS

Item Ref. Description Quantity Unit Rate

CONSTRUCTION MANAGEMENT - DESIGN


AND BUILD CONTRACTOR'S OVERHEAD AND
PROFITS

The Contractor shall allow for all


obligations as detailed in Volume I and II
of the RFP.
The Contractor shall provide a fully
detailed price build up for all
Overheads and Profits for the Tenderer's
Work Breakdown Structure
including proposed WBS proposed
for the following Main facilities

Overheads

A FAB Building item

B CUB item

C Office Building item

D Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

Profits

E FAB Building item

F CUB item

G Office Building item

H Site Works including Infrastructure, roads,


and other external works and services
Landscaping, etc. item

08/07/2020 Page B7.33


GLOBALFOUNDRIES
AD-01 ABU DHABI SEMI CONDUCTOR PLANT DESIGN AND BUILD CONTRACTOR'S
PRICING DOCUMENT OVERHEAD AND PROFITS

Item Ref. Description Quantity Unit Rate


To Collection US $

08/07/2020 Page B7.34


BILL NO. 7
BUILD CONTRACTOR'S
ERHEAD AND PROFITS

Amount
(US $)

08/07/2020 Page B7.35


BILL NO. 7
BUILD CONTRACTOR'S
ERHEAD AND PROFITS

Amount
(US $)

08/07/2020 Page B7.36


GLOBALFOUNDRIES MAIN SUMMARY
AD-01 ABU DHABI SEMI CONDUCTOR PLANT
PRICING DOCUMENT

Amount
Item Ref. Description Page Unit Rate
(US $)

MAIN SUMMARY

Bill No. 1 - General Items B1.9

Bill No. 2 - Design Obligations B2.1

Bill No. 3 - Permitting B3.1

Bill No. 4 - Procurement B4.1

Bill No. 5 - Project Management B5.3

Bill No 6 - HSE B6.1

Bill No. 7 - Overheads and Profit B7.1

To Carried to Form of Tender - US $

08/07/2020 Page M.S. 37


08/07/2020 Page M.S. 38