HSE Corrective Action Plan

Project: Location: Project start date: Project completion date:


Design & buikld of two 33/11 KV PU Al Ain Zoo 24/11/2019 21/02/2021
Substations in Al Ain Zoo
Project Manager/ In charge Name: Mr. Basim Obaid Telephone No.# 050 6625139 Email address:basim.obaid@musanada.com

Corrective Action taken


S/N Observation Action By Action Date Remarks Satus

The access has been provided, and it will be ensured going forward

CoP 53.0, CoP 23.0 & CoP 29.0 -


Potential risk of falls from height
1 Engsol 18/06/2020 Closed
due to absence of safe access to
the trial pit exacavtion.

The excavated soil has been removed from the edge of excavation and it will be
ensured going foreward

CoP 53.0 & CoP 29.0 -Excavated


soil kept near excavation edges
with potential risk of falling.

Engsol 18/06/2020
Corrective Action taken
S/N Observation Action By Action Date Remarks Satus

New sign boards has been istalled in the site

Engsol 18/06/2020 Closed


CoP 53.0 & CoP 17.0 - Damaged
and sub-standard safety signage Engsol 16/06/2020 Closed
used at site.

CoP 53.0 & CoP 22.0 - Gaps


The gap between fence and ground
between site perimeter fences
The gap will be filled during excavation work Engsol 30/7/2020 will be filled with xcavated material Open
and the ground with potential risk
during plot excavation works.
of unauthorised entry.

Name Signature
Mr. Niyas Alayan
Prepared by:

Mr. Thirumurugan Pandiaraj


Contractor PM:

Mr. Venkata Ramanathan


Consultant RE: